Wabaco-Dover Transmission Projects, Dairyland Power Cooperative Projects, Substation, 69 KV Line, Environmental Report

Wabaco-Dover Transmission Projects, Dairyland Power Cooperative Projects, Substation, 69 KV Line, Environmental Report PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 180

Get Book Here

Book Description


Dover-Wabasha 69 KV Transmission Line and Associated Facilities, Olmstead County

Dover-Wabasha 69 KV Transmission Line and Associated Facilities, Olmstead County PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 16

Get Book Here

Book Description


Marys Lake 69/115-kV Transmission Line Upgrade and Substation Expansion Projects

Marys Lake 69/115-kV Transmission Line Upgrade and Substation Expansion Projects PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 212

Get Book Here

Book Description
Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

Electric Transmission Facilities Construction, Fennimore Distribution Substation Reconstruction, Grant County

Electric Transmission Facilities Construction, Fennimore Distribution Substation Reconstruction, Grant County PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 18

Get Book Here

Book Description


Rycevile-Lexington Park 230 KV Transmission Line

Rycevile-Lexington Park 230 KV Transmission Line PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 172

Get Book Here

Book Description


Chalk Point-Lexington Park 230 KV Transmission Line

Chalk Point-Lexington Park 230 KV Transmission Line PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 546

Get Book Here

Book Description


Schultz-Hanford Area Transmission Line Project

Schultz-Hanford Area Transmission Line Project PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 378

Get Book Here

Book Description


Grand Coulee-Bell 500-kV Transmission Line Project

Grand Coulee-Bell 500-kV Transmission Line Project PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 218

Get Book Here

Book Description


Environmental Impact Statement on the Proposed 161-kV Transmission Line from Crystal Cave, Pierce County, to Apple River, Polk County

Environmental Impact Statement on the Proposed 161-kV Transmission Line from Crystal Cave, Pierce County, to Apple River, Polk County PDF Author: Public Service Commission of Wisconsin. Bureau of Environmental and Energy Systems
Publisher:
ISBN:
Category : Electric power distribution
Languages : en
Pages : 168

Get Book Here

Book Description


Agricultural Impact Statement, CAPX 2020 345 KV Transmission Line Project, Arcadia-Holmen

Agricultural Impact Statement, CAPX 2020 345 KV Transmission Line Project, Arcadia-Holmen PDF Author: Alice Halpin
Publisher:
ISBN:
Category : Agricultural conservation
Languages : en
Pages : 116

Get Book Here

Book Description