PFBC HGCU Test Facility. Technical Progress Report No. 10 for the First Quarter, CY 1992

PFBC HGCU Test Facility. Technical Progress Report No. 10 for the First Quarter, CY 1992 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 15

Get Book Here

Book Description
This is the tenth technical progress report in connection with the Cooperative Agreement between DOE and Ohio Power Company for the Tidd PFBC Hot Gas Clean Up Test Facility. This report covers the period of work completed during the First Quarter of C 1992. Work focused on supporting field construction activities and expediting delivery of equipment. The project is on schedule. The following significant events occurred during this report period: The major components of the system were delivered to the site and installed: contract Modification No. 5 issued to Westinghouse authorized partial funding for proof-of-concept touting of an alternate filter candle material at Karhula, Finland; and contract Modification No. 2, issued to Babcock & Wilcox covered additional material (hangers, steel) and certain work scope changes.

PFBC HGCU Test Facility. Technical Progress Report No. 10 for the First Quarter, CY 1992

PFBC HGCU Test Facility. Technical Progress Report No. 10 for the First Quarter, CY 1992 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 15

Get Book Here

Book Description
This is the tenth technical progress report in connection with the Cooperative Agreement between DOE and Ohio Power Company for the Tidd PFBC Hot Gas Clean Up Test Facility. This report covers the period of work completed during the First Quarter of C 1992. Work focused on supporting field construction activities and expediting delivery of equipment. The project is on schedule. The following significant events occurred during this report period: The major components of the system were delivered to the site and installed: contract Modification No. 5 issued to Westinghouse authorized partial funding for proof-of-concept touting of an alternate filter candle material at Karhula, Finland; and contract Modification No. 2, issued to Babcock & Wilcox covered additional material (hangers, steel) and certain work scope changes.

Energy Research Abstracts

Energy Research Abstracts PDF Author:
Publisher:
ISBN:
Category : Power resources
Languages : en
Pages : 294

Get Book Here

Book Description


Government Reports Annual Index

Government Reports Annual Index PDF Author:
Publisher:
ISBN:
Category : Government reports announcements & index
Languages : en
Pages : 1220

Get Book Here

Book Description


PFBC HGCU Test Facility. Fourth Quarterly Technical Progress Report, CY 1992

PFBC HGCU Test Facility. Fourth Quarterly Technical Progress Report, CY 1992 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 72

Get Book Here

Book Description
This is the thirteenth Technical Progress Report submitted to the Department of Energy (DOE) in connection with the cooperative agreement between the DOE and Ohio Power Company for the Tidd PFBC Hot Gas Clean Up Test Facility. This report covers the period of work completed during the Fourth Quarter of CY 1992. The following are highlights of the activities that occurred during this report period: Initial operation of the Advanced Particle Filter (APF) occurred during this quarter. The following table summarizes the operating dates and times. HGCU ash lockhopper valve plugged with ash. Primary cyclone ash pluggage. Problems with the coal water paste. Unit restarted warm 13 hours later. HGCU expansion joint No. 7 leak in internal ply of bellows. Problems encountered during these initial tests included hot spots on the APP, backup cyclone and instrumentation spools, two breakdowns of the backpulse air compressor, pluggage of the APF hopper and ash removal system, failure (breakage) of 21 filter candles, leakage of the inner ply of one (1) expansion joint bellows, and numerous other smaller problems. These operating problems are discussed in detail in a subsequent section of this report. Following shutdown and equipment inspection in December, design modifications were initiated to correct the problems noted above. The system is scheduled to resume operation in March, 1993.

PFBC HGCU Test Facility. Second Quarterly Technical Progress Report, CY 1992

PFBC HGCU Test Facility. Second Quarterly Technical Progress Report, CY 1992 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 29

Get Book Here

Book Description
This is the eleventh technical progress report submitted to the Department of Energy (DOE) in connection with the Cooperative Agreement between DOE and Ohio Power company for the Tidd Pressurized Fluidized Bed Combustion (PFBC) Hot Gas Clean Up Test Facility. This report covers the period of work completed during the Second Quarter of CY 1992. Activities included: The Tidd combustor internals were modified to connect the hot gas system for slipstream operation; Various pre-operational activities were completed, including pneumatic leak testing of the HGCU system, operation of the closed cycle cooling water system, operation of the back pulse compressor and air preheater, and checkout of the back pulse skid. Initial operation of the system using the bypass cyclone occurred during May 21--23, 1992; On May 23, 1992, an expansion joint ruptured, forcing the unit to be shut down. The failure was later determined to be due to stress corrosion. Following the expansion joint failure, a complete engineering review of the system was undertaken and is continuing; Contract Modification No. 6 was issued to Westinghouse during this quarter. This modification is for APF surveillance testing services; A purchase order was issued to Battelle for ash sampling hardware and testing services.

PFBC HGCU Test Facility. Technical Progress Report No. 24, Third Quarter, CY 1995

PFBC HGCU Test Facility. Technical Progress Report No. 24, Third Quarter, CY 1995 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


Government Reports Announcements & Index

Government Reports Announcements & Index PDF Author:
Publisher:
ISBN:
Category : Science
Languages : en
Pages : 778

Get Book Here

Book Description


PFBC HGCU Test Facility Technical Progress Report Second Quarter, CY 1994

PFBC HGCU Test Facility Technical Progress Report Second Quarter, CY 1994 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


PFBC HGCU Test Facility. Technical Progress Report, Fourth Quarter, CY 1994

PFBC HGCU Test Facility. Technical Progress Report, Fourth Quarter, CY 1994 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


PFBC HGCU Test Facility Technical Progress Report. First Quarter, CY 1994

PFBC HGCU Test Facility Technical Progress Report. First Quarter, CY 1994 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 228

Get Book Here

Book Description
This is the eighteenth Technical Progress Report submitted in connection with the cooperative agreement between the DOE and Ohio Power Company for the Tidd PFBC Hot Gas Clean Up Test Facility. During this quarter, the Tidd Hot Gas Clean Up System operated for 835 hours during six separate test runs. The system was starting into a seventh run at the end of the quarter. Highlights of this period are summarized below: the longest run during the quarter was approximately 333 hours; filter pressure drop was stable during all test runs this quarter using spoiling air to the primary cyclone upstream of the Advanced Particle Filter (APF); the tempering air system was commissioned this quarter which enabled the unit to operate at full load conditions while limiting the gas temperature in the APF to 1,400 F; during a portion of the one run, the tempering air was removed and the filter operated without problems up to 1,450 F; ash sampling was performed by Battelle personnel upstream and downstream of the APF and ash loading and particle size distribution data were obtained, a summary report is included; a hot area on the APF head was successfully repaired in service; a hot spot on the top of an expansion joint was successfully repaired by drilling holes from the inside of the pipe and pumping in refractory insulation; a corrosion inspection program for the HGCU system was issued giving recommendations for points to inspect; filter internal inspections following test runs 13 and 17 revealed a light coating (up to 1/4 inch thick) of residual ash on the candles and some ash bridging between the dust sheds and inner rows of candles. Data from these inspections are included with this report.