Requirements for Maintenance of Inspections, Tests, Analyses, and Acceptance Criteria (Us Nuclear Regulatory Commission Regulation) (Nrc) (2018 Edition)

Requirements for Maintenance of Inspections, Tests, Analyses, and Acceptance Criteria (Us Nuclear Regulatory Commission Regulation) (Nrc) (2018 Edition) PDF Author: The Law The Law Library
Publisher: Createspace Independent Publishing Platform
ISBN: 9781729870143
Category :
Languages : en
Pages : 34

Get Book Here

Book Description
Requirements for Maintenance of Inspections, Tests, Analyses, and Acceptance Criteria (US Nuclear Regulatory Commission Regulation) (NRC) (2018 Edition) The Law Library presents the complete text of the Requirements for Maintenance of Inspections, Tests, Analyses, and Acceptance Criteria (US Nuclear Regulatory Commission Regulation) (NRC) (2018 Edition). Updated as of May 29, 2018 The U.S. Nuclear Regulatory Commission (NRC or the Commission) is amending its regulations related to verification of nuclear power plant construction activities through inspections, tests, analyses, and acceptance criteria (ITAAC) under a combined license, and issuing a revision to Regulatory Guide (RG) 1.215, "Guidance for ITAAC Closure Under 10 CFR [Title 10 of the Code of Federal Regulations] Part 52." The final rule contains new provisions that apply after a licensee has completed an ITAAC and submitted an ITAAC closure notification. The new provisions require licensees to report new information materially altering the basis for determining that inspections, tests, or analyses were performed as required, or that acceptance criteria are met, and to notify the NRC of the completion of all ITAAC activities. In addition, the NRC is including editorial corrections to existing language in the NRC's regulations to make that language consistent with language in the Atomic Energy Act of 1954, as amended (AEA). Regulatory Guide 1.215 describes a method that the staff of the NRC considers acceptable for use in satisfying the requirements for documenting the completion of ITAAC. This book contains: - The complete text of the Requirements for Maintenance of Inspections, Tests, Analyses, and Acceptance Criteria (US Nuclear Regulatory Commission Regulation) (NRC) (2018 Edition) - A table of contents with the page number of each section

Requirements for Maintenance of Inspections, Tests, Analyses, and Acceptance Criteria (Us Nuclear Regulatory Commission Regulation) (Nrc) (2018 Edition)

Requirements for Maintenance of Inspections, Tests, Analyses, and Acceptance Criteria (Us Nuclear Regulatory Commission Regulation) (Nrc) (2018 Edition) PDF Author: The Law The Law Library
Publisher: Createspace Independent Publishing Platform
ISBN: 9781729870143
Category :
Languages : en
Pages : 34

Get Book Here

Book Description
Requirements for Maintenance of Inspections, Tests, Analyses, and Acceptance Criteria (US Nuclear Regulatory Commission Regulation) (NRC) (2018 Edition) The Law Library presents the complete text of the Requirements for Maintenance of Inspections, Tests, Analyses, and Acceptance Criteria (US Nuclear Regulatory Commission Regulation) (NRC) (2018 Edition). Updated as of May 29, 2018 The U.S. Nuclear Regulatory Commission (NRC or the Commission) is amending its regulations related to verification of nuclear power plant construction activities through inspections, tests, analyses, and acceptance criteria (ITAAC) under a combined license, and issuing a revision to Regulatory Guide (RG) 1.215, "Guidance for ITAAC Closure Under 10 CFR [Title 10 of the Code of Federal Regulations] Part 52." The final rule contains new provisions that apply after a licensee has completed an ITAAC and submitted an ITAAC closure notification. The new provisions require licensees to report new information materially altering the basis for determining that inspections, tests, or analyses were performed as required, or that acceptance criteria are met, and to notify the NRC of the completion of all ITAAC activities. In addition, the NRC is including editorial corrections to existing language in the NRC's regulations to make that language consistent with language in the Atomic Energy Act of 1954, as amended (AEA). Regulatory Guide 1.215 describes a method that the staff of the NRC considers acceptable for use in satisfying the requirements for documenting the completion of ITAAC. This book contains: - The complete text of the Requirements for Maintenance of Inspections, Tests, Analyses, and Acceptance Criteria (US Nuclear Regulatory Commission Regulation) (NRC) (2018 Edition) - A table of contents with the page number of each section

Revised Inspection Program for Nuclear Power Plants

Revised Inspection Program for Nuclear Power Plants PDF Author: U.S. Nuclear Regulatory Commission. Office of Inspection and Enforcement
Publisher:
ISBN:
Category : Nuclear power plants
Languages : en
Pages : 32

Get Book Here

Book Description


Development of a Checklist for Evaluating Maintenance, Test, and Calibration Procedures Used in Nuclear Power Plants

Development of a Checklist for Evaluating Maintenance, Test, and Calibration Procedures Used in Nuclear Power Plants PDF Author: Robert L. Brune
Publisher:
ISBN:
Category : Nuclear power plants
Languages : en
Pages : 168

Get Book Here

Book Description


Procedures Evaluation Checklist for Maintenance, Test, and Calibration Procedures

Procedures Evaluation Checklist for Maintenance, Test, and Calibration Procedures PDF Author: Robert L. Brune
Publisher:
ISBN:
Category : Nuclear power plants
Languages : en
Pages : 32

Get Book Here

Book Description


Federal Register

Federal Register PDF Author:
Publisher:
ISBN:
Category : Delegated legislation
Languages : en
Pages : 318

Get Book Here

Book Description


Report on Nuclear Industry Quality Assurance Procedures for Safety Analysis Computer Code Development and Use

Report on Nuclear Industry Quality Assurance Procedures for Safety Analysis Computer Code Development and Use PDF Author: Brian Sheron
Publisher:
ISBN:
Category : Computers
Languages : en
Pages : 180

Get Book Here

Book Description


Maintenance Inspection Guidance Procedure IP 62703

Maintenance Inspection Guidance Procedure IP 62703 PDF Author: U.S. Nuclear Regulatory Commission. Office of the Secretary
Publisher:
ISBN:
Category : Nuclear facilities
Languages : en
Pages : 16

Get Book Here

Book Description


Audit of Nrc's Inspections, Tests, Analyses, and Acceptance Criteria (Itaac) Process

Audit of Nrc's Inspections, Tests, Analyses, and Acceptance Criteria (Itaac) Process PDF Author: CreateSpace Independent Publishing Platform
Publisher: Createspace Independent Publishing Platform
ISBN: 9781722188368
Category :
Languages : en
Pages : 48

Get Book Here

Book Description
Audit of NRC's Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) process

Guidelines for Inservice Testing at Nuclear Power Plantsat Nuclear Power Plants

Guidelines for Inservice Testing at Nuclear Power Plantsat Nuclear Power Plants PDF Author: U.s. Nuclear Reglatory Commission
Publisher: CreateSpace
ISBN: 9781499650679
Category : Science
Languages : en
Pages : 212

Get Book Here

Book Description
The staff of the U.S. Nuclear Regulatory Commission (NRC) is issuing Revision 2 to the NUREG-1482, “Guidelines for Inservice Testing at Nuclear Power Plants,” to assist the nuclear industry in establishing a basic understanding of the regulatory basis for pump and valve inservice testing (IST) programs and dynamic restraint (snubbers) examination and testing programs. This NUREG also provides information regarding the NRC's involvement in the development of the American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants (OM Code). In this NUREG, the staff discusses OM Code inquiries, the inservice examination and testing of snubbers, pump and valve IST, the use of ASME code cases, conditions on the use of the OM Code, guidance for OM Code noncompliance, requests for alternatives to the OM Code at operating commercial nuclear power plants, and the development of IST programs for new reactors*.

Technical Specification Improvement Program Highlights

Technical Specification Improvement Program Highlights PDF Author:
Publisher:
ISBN:
Category : Nuclear reactors
Languages : en
Pages : 22

Get Book Here

Book Description