Rapid Replacement of Bridge Decks

Rapid Replacement of Bridge Decks PDF Author: Maher K. Tadros
Publisher: Transportation Research Board
ISBN: 9780309062602
Category : Technology & Engineering
Languages : en
Pages : 64

Get Book Here

Book Description

Rapid Replacement of Bridge Decks

Rapid Replacement of Bridge Decks PDF Author: Maher K. Tadros
Publisher: Transportation Research Board
ISBN: 9780309062602
Category : Technology & Engineering
Languages : en
Pages : 64

Get Book Here

Book Description


Rapid Replacement of Bridge Deck Expansion Joints Study -- Phase I

Rapid Replacement of Bridge Deck Expansion Joints Study -- Phase I PDF Author: Adam M. Miller
Publisher:
ISBN:
Category : Bridges
Languages : en
Pages : 73

Get Book Here

Book Description
Bridge deck expansion joints are used to allow for movement of the bridge deck due to thermal expansion, dynamics loading, and other factors. More recently, expansion joints have also been utilized to prevent the passage of winter de-icing chemicals and other corrosives applied to bridge decks from penetrating and damaging substructure components of the bridge. Expansion joints are often one of the first components of a bridge deck to fail and repairing or replacing expansion joints are essential to extending the life of any bridge. In the Phase I study, the research team focused on the current means and methods of repairing and replacing bridge deck expansion joints. Research team members visited with Iowa Department of Transportation (DOT) Bridge Crew Leaders to document methods of maintaining and repairing bridge deck expansion joints. Active joint replacement projects around Iowa were observed to document the means of replacing expansion joints that were beyond repair, as well as, to identify bottlenecks in the construction process that could be modified to decrease the length of expansion joint replacement projects. After maintenance and replacement strategies had been identified, a workshop was held at the Iowa State Institute for Transportation to develop ideas to better maintain and replace expansion joints. Maintenance strategies were included in the discussion as a way to extend the useful life of a joint, thus decreasing the number of joints replaced in a year and reducing the traffic disruptions.

Rapid Replacement of Bridge Decks

Rapid Replacement of Bridge Decks PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 52

Get Book Here

Book Description


Rapid Rehabilitation/replacement of Bridge Decks

Rapid Rehabilitation/replacement of Bridge Decks PDF Author: George Edward Ramey
Publisher:
ISBN:
Category : Bridges
Languages : en
Pages :

Get Book Here

Book Description


Rapid Bridge Deck Replacement

Rapid Bridge Deck Replacement PDF Author: Roberto Alejandro Osegueda
Publisher:
ISBN:
Category : Bridges
Languages : en
Pages : 88

Get Book Here

Book Description
This report describes a full-size field demonstration of a rapid bridge deck replacement concept put forward several years ago. The concept was to utilize a sand mortar made with a rapid setting epoxy to provide the shear tie between precast concrete deck panels and existing steel stringer beams. The demonstration site was a 50 ft simple span that serves as part of the SPUR 326 overpass over the AT & SF railroad tracks in downtown Lubbock, Texas. The demonstration bridge is one of two identical bridges, side-by-side; the other was redecked using a conventional poured-in-place technique. Eight precast panels, each 6 ft 3 in. x 45 ft x 8 in., were used to form the experimental deck. Each panel was cast with blockouts (holes) positioned directly over the supporting steel beams. When the original concrete deck was removed, the steel shear studs were cut away leaving the top of the flanges of the steel beams clean and flat. The precast panels were then positioned atop of the steel in an operation lasting less than 5 hours, the new steel studs were welded into place through the blockouts in about 4 hours, and then the panels were epoxied into place in less than 2 full working days.

Rapid Bridge Deck Replacement

Rapid Bridge Deck Replacement PDF Author: Roberto Alejandro Osegueda
Publisher:
ISBN:
Category : Bridges
Languages : en
Pages : 452

Get Book Here

Book Description


Rapid Replacement/rehabilitation of Bridge Decks

Rapid Replacement/rehabilitation of Bridge Decks PDF Author: Russell S. Oliver
Publisher:
ISBN:
Category : Concrete bridges
Languages : en
Pages : 498

Get Book Here

Book Description


Rapid Rehabilitation/ Replacement of Bridge Decks Via the Addition of Girder Lines

Rapid Rehabilitation/ Replacement of Bridge Decks Via the Addition of Girder Lines PDF Author: Stephen McRae
Publisher:
ISBN:
Category : Bridges
Languages : en
Pages : 376

Get Book Here

Book Description


Rapid Replacement of Tangier Island Bridges Including Lightweight and Durable Fiber-reinforced Polymer Deck Systems

Rapid Replacement of Tangier Island Bridges Including Lightweight and Durable Fiber-reinforced Polymer Deck Systems PDF Author:
Publisher:
ISBN:
Category : Bridges
Languages : en
Pages : 19

Get Book Here

Book Description
Fiber-reinforced polymer (FRP) composite cellular deck systems were used as new bridge decks on two replacement bridges on Tangier Island, Virginia. The most important characteristics of this application were reduced self-weight and increased durability for an FRP deck system over a reinforced concrete bridge deck. Tangier Island is in the Chesapeake Bay and is accessible only by water or air; each bridge is over saltwater. The two bridge deck systems used were from different manufacturers: Strongwell Corp. and Zellcomp, Inc. The deck system from Strongwell was virtually identical to a previous application by the Virginia Department of Transportation (VDOT) in Covington, Virginia. Because of the extensive testing of this system conducted as part of a prior Innovative Bridge Research and Deployment project, further investigation of its behavior was not warranted. The objectives of the testing of the Zellcomp deck system were four-fold: (1) investigate connection behavior under simulated pseudo-static service load; (2) examine flexural strength and failure mode of connections and deck; (3) explore fatigue behavior during simulated cyclic wheel loading and residual strength after fatigue loading; and (4) investigate viability of transition connection. Two test sections were constructed in the Structures and Materials Laboratory at Virginia Tech. The test sections included sections of the Zellcomp deck attached to supporting steel stringers. The first was flat, 11 ft by 8 ft in plan, and subjected to static and simulated truck loadings. The second included a transition connection and was 17 ft by 8 ft in plan. Of special interest during this testing was the investigation of the static and cyclic behavior of all Zellcomp deck connections (top plate to supporting T-sections, T-section to T-section, and T-section to supporting stringers). The flat Zellcomp deck test specimen had a 1.4 safety factor against sustaining permanent damage and a 2.4 safety factor against failure when subjected to an HL-93 wheel load of 22 kips. There was no measured composite action between the top plate and supporting T-section. Generally, the specimen performed well during the fatigue test. However, there was some indication of deterioration of the lap joint connections at 1 million cycles of load and loss of stiffness at about 2.5 million cycles of load. The bent lap joint connection was difficult to construct. A permanent gap between the top plate and supporting T-sections resulted because of inherent construction tolerances. The slope Zellcomp deck specimen underwent significant deterioration during the first 600,000 cycles of load. Numerous top plate screw connections loosened, with several completely fracturing. The damage to the deck increased for the next 400,000 cycles. The study recommended that VDOT's Structure and Bridge Division (1) not use the sloped deck transition on any applications of the Zellcomp bridge deck system; (2) consider close inspection of all screw connections on the Zellcomp deck during regularly scheduled bridge inspections; and (3) consider additional more rigorous full-scale testing of the Zellcomp deck system before considering its use on any bridge structure that has truck traffic. The Tangier Island Bridge is subjected to very light truck traffic, and the Zellcomp system proved to be adequate for this specific application only.

The Future of Rapid Bridge Deck Replacement

The Future of Rapid Bridge Deck Replacement PDF Author: Annabelle Allen
Publisher:
ISBN:
Category : Bridges
Languages : en
Pages : 25

Get Book Here

Book Description