The dam is a 184 ft. long concrete dam with a maximum height of 16 ft. There are deficiencies which must be corrected to assure the continued performance of the dam. Generally the dam is considered to be in fair to good condition. It is small in size and has a significant hazard potential. (Author).

National Program for Inspection of Non-Federal Dams. Hunts Pond Dam (MA 00634), Connecticut River Basin, Winchendon, Massachusetts. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Hunts Pond Dam (MA 00634), Connecticut River Basin, Winchendon, Massachusetts. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 108

Get Book Here

Book Description
The dam is a 184 ft. long concrete dam with a maximum height of 16 ft. There are deficiencies which must be corrected to assure the continued performance of the dam. Generally the dam is considered to be in fair to good condition. It is small in size and has a significant hazard potential. (Author).

Government Reports Annual Index

Government Reports Annual Index PDF Author:
Publisher:
ISBN:
Category : Government reports announcements & index
Languages : en
Pages : 1236

Get Book Here

Book Description


National Program for Inspection of Non-Federal Dams. Whites Mill Pond Dam (MA 00630), Connecticut River Basin, Winchendon, Massachusetts. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Whites Mill Pond Dam (MA 00630), Connecticut River Basin, Winchendon, Massachusetts. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 88

Get Book Here

Book Description
White's Mill Pond dam which was built before 1923 is a 340-foot long earthfill dam with upstream and downstream dry stone masonry walls. The dam has a maximum height of 13 feet and consists of a spillway, low level outlet, an intake toi a plant, and an earth dike. The following deficiencies were observed at the site: severe seepage at several locations along the toe of the dam; downstream stone masonry walls are out of plumb; lack of access to the low level outlet operator; erosion at the low point of the dam crest; bulging of the downstream masonry wall in several locations; stone missing from the upstream face of the spillway, mortar missing from the stone masonry spillway of the dam; heavy growth of brush and trees on the dam crest and on the dike; and an accumulation of debris in the discharge channel. Hydraulic analyses indicate that the spillway (without stoplogs) can discharge 520 cfs, or 76 percent of the test flood outflow before the dam is overtopped. (With the stoplogs, the spillway can discharge 170 cfs or 22 percent of the test flood outflow before the dam is overtopped).

Government Reports Announcements & Index

Government Reports Announcements & Index PDF Author:
Publisher:
ISBN:
Category : Science
Languages : en
Pages : 536

Get Book Here

Book Description


National Program for Inspection of Non-Federal Dams. Whitney Pond (MA 00633), Connecticut River Basin, Winchendon, Massachusetts. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Whitney Pond (MA 00633), Connecticut River Basin, Winchendon, Massachusetts. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 96

Get Book Here

Book Description
The dam is comprised of an 82 foot long stone masonry spillway, a 450 foot earth embankment to the left of the spillway, and a 30 foot earth embankment to the right of the spillway. The spillway can pass 7 percent of this flow. The dam would be overtopped by 6 feet. The dam is in generally good condition. It is felt, however, that certain normal maintenance and operational procedures need attention. These include removal of brush and trees on the upstream and downstream slopes; development of a formal warning system and monitoring of the condition of the downstream training wall. Also repairs to the walkway over the spillway are required.

National Program for Inspection of Non-Federal Dams. Powder Mill Pond Dam (MA 00092), Connecticut River Basin, South Barre, Massachusetts. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Powder Mill Pond Dam (MA 00092), Connecticut River Basin, South Barre, Massachusetts. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 107

Get Book Here

Book Description
Powder Mill Pond Dam is located on the Ware River approximately one mile upstream of South Barre, Massachusetts. The dam, reconstructed in 1908 to generate electric power for the Barre Wool Combing Company, consists of an upgated concrete spillway approximately 125 ft. long and 20 ft. high, a short emergency spillway and an outlet canal with two inoperative timber gates. The dam was extensively modified during the 1930's. Based on a visual examination of the structure, the facility is in fair to poor condition. Nevertheless, there was no evidence of structural failure or other conditions which would warrant urgent remedial treatment. Based on size and hazard classifications in accordance with Corps of Engineers guidelines, the test flood for this dam is the Probable Maximum Flood (PMF). The PMF outflow of 48,160 cfs would overtop the dam by 5.15 ft. With the water level at top of dam, the main and emergency spillways can pass 17,940 cfs which is 37 percent of the test flood.

National Program for Inspection of Non-Federal Dams. Whiting Street Pond Dam (MA 00070), Connecticut River Basin, Holyoke, Massachusetts. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Whiting Street Pond Dam (MA 00070), Connecticut River Basin, Holyoke, Massachusetts. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 76

Get Book Here

Book Description
Whiting Street Pond Dam is an earth-buttresed stone masonry dam, 1900 feet long with a maximum height of about 19 feet. A two level stone masonry and concrete spillway is located about 70 feet from the dam's south abutment. A gatehouse and gate chamber are located at approximately the center of the dam and contain the operating mechanisms for controlling the outflows into the City's Water Supply and to the low level outlet. Discharges from the low level outlet and the spillway converge and flow into an unnamed creek before emptying into the Connecticut River. Phase I inspection and evaluation of Whiting Street Pond Dam does not indicate conditions which would constitute an immediate hazard to human life or property. Based on engineering judgement and the performance of the dam and the outlet works, the project is considered to be in fair condition. The project, however, does have a number of deficiencies which, if not remedied, have the potential for developing into hazardous conditions. The test flood, in accordance with Corps of Engineers guidelines, is the Probable Maximum Flood (PMF). The PMF yields an outflow of 8253 cfs which is greater than the maximum discharge capacity of the spillway of 215 cfs and would result in overtopping of the dam by about 1.4 feet.

National Program for Inspection of Non-Federal Dams. Snow Pond Dam (MA 00079), Connecticut River Basin, Ware, Massachusetts. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Snow Pond Dam (MA 00079), Connecticut River Basin, Ware, Massachusetts. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 79

Get Book Here

Book Description
Snow Pond dam is approximately 200 ft. long overall, and consists of a small earth embankment approximately 6 ft. high, an ungated concrete ogee spillway, a section of earth fill retained by concrete and stone masonry walls and a 6-ft. diameter outlet pipe. The dam is in fair condition. There are no obvious signs of failure or conditions which would warrant urgent remedial treatment. Hydraulic analyses indicate that the spillway cannot pass either one-half the probable maximum flood or the 100-year flood and the spillway is considered inadequate. Recommendations for remedial work include earthwork to restore embankment grades, structural repair of the control gate to the outlet conduit and reconstruction of certain retaining walls. Work should be designed and constructed as soon as practical under the supervision of a registered professional engineer.

National Program for Inspection of Non-Federal Dams, Ashfield Pond Dam (MA 00523), Connecticut River Basin, Ashfield, Massachusetts. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams, Ashfield Pond Dam (MA 00523), Connecticut River Basin, Ashfield, Massachusetts. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 77

Get Book Here

Book Description
Ashfield Pond Dam is an earth embankment about 775 feet long with a maximum height of about 15 feet. A 30 foot long, 14.5 foot high stone masonry and concrete stepped spillway is located about 110 feet from the east abutment. A rectangular concrete low level outlet, 4 feet wide and 1.7 feet high is located at the east end of the spillway. Phase I inspection and evaluation of Ashfield Pond Dam does not indicate conditions which would constitute an immediate hazard to human life or property. Based on enginnering judgment and the performance of the earth embankment and the outlet works, the project is considered to be in fair condition. The project has a number of deficiencies which, if not remedied, have the potential for developing into hazardous conditions. Selection of 1/2 PMF as the test flood, yields an outflow of 1698 cfs (assuming the low level outlet is closed), which is greater than the maximum spillway discharge capacity of 965 cfs and would result in an overtopping of the dam by about 0.43 feet.

National Program for Inspection of Non-Federal Dams. South Barre Mill Pond Dam (MA 00091), Connecticut River Basin, South Barre, Massachusetts. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. South Barre Mill Pond Dam (MA 00091), Connecticut River Basin, South Barre, Massachusetts. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 69

Get Book Here

Book Description
The South Barre Mill Pond dam is a small dam consisting of two adjacent concrete ogee spillways, a short earth embankment on the right side and an outlet works to a penstock at the left abutment. The present dam, constructed about 1904, was extensively damaged in the floods of 1936 and 1938 and has been reconstructed on several occasions, the latest work in 1944. The dam is in fair to good condition. There are no obvious signs of failure or conditions which would warrant urgent remedial treatment. Hydraulic analyses indicate that the spillway will not pass one-half the probable maximum flood and the spillway is considered inadequate, Recommendations for remedial work include repair of concrete at the left training wall and right spillway weir and restoration of gates to good operating condition. Additional investigation of the right spillway weir is recommended, since no data are available concerning this portion of the structure.