Idaho National Laboratory Comprehensive Land Use and Environmental Stewardship Report

Idaho National Laboratory Comprehensive Land Use and Environmental Stewardship Report PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
Land and facility use planning and decisions at the Idaho National Laboratory (INL) Site are guided by a comprehensive site planning process in accordance with Department of Energy Policy 430.1, 'Land and Facility Use Policy, ' that integrates mission, economic, ecologic, social, and cultural factors. The INL Ten-Year Site Plan, prepared in accordance with Department of Energy Order 430.1B, 'Real Property Asset Management, ' outlines the vision and strategy to transform INL to deliver world-leading capabilities that will enable the Department of Energy to accomplish its mission. Land use planning is the overarching function within real property asset management that integrates the other functions of acquisition, recapitalization, maintenance, disposition, real property utilization, and long-term stewardship into a coordinated effort to ensure current and future mission needs are met. All land and facility use projects planned at the INL Site are considered through a formal planning process that supports the Ten-Year Site Plan. This Comprehensive Land Use and Environmental Stewardship Report describes that process. The land use planning process identifies the current condition of existing land and facility assets and the scope of constraints across INL and in the surrounding region. Current land use conditions are included in the Comprehensive Land Use and Environmental Stewardship Report and facility assets and scope of constraints are discussed in the Ten-Year Site Plan. This report also presents the past, present, and future uses of land at the INL Site that are considered during the planning process, as well as outlining the future of the INL Site for the 10, 30, and 100-year timeframes.

Idaho National Laboratory Comprehensive Land Use and Environmental Stewardship Report

Idaho National Laboratory Comprehensive Land Use and Environmental Stewardship Report PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
Land and facility use planning and decisions at the Idaho National Laboratory (INL) Site are guided by a comprehensive site planning process in accordance with Department of Energy Policy 430.1, 'Land and Facility Use Policy, ' that integrates mission, economic, ecologic, social, and cultural factors. The INL Ten-Year Site Plan, prepared in accordance with Department of Energy Order 430.1B, 'Real Property Asset Management, ' outlines the vision and strategy to transform INL to deliver world-leading capabilities that will enable the Department of Energy to accomplish its mission. Land use planning is the overarching function within real property asset management that integrates the other functions of acquisition, recapitalization, maintenance, disposition, real property utilization, and long-term stewardship into a coordinated effort to ensure current and future mission needs are met. All land and facility use projects planned at the INL Site are considered through a formal planning process that supports the Ten-Year Site Plan. This Comprehensive Land Use and Environmental Stewardship Report describes that process. The land use planning process identifies the current condition of existing land and facility assets and the scope of constraints across INL and in the surrounding region. Current land use conditions are included in the Comprehensive Land Use and Environmental Stewardship Report and facility assets and scope of constraints are discussed in the Ten-Year Site Plan. This report also presents the past, present, and future uses of land at the INL Site that are considered during the planning process, as well as outlining the future of the INL Site for the 10, 30, and 100-year timeframes.

Idaho National Laboratory Site Environmental Monitoring Plan

Idaho National Laboratory Site Environmental Monitoring Plan PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, "Environmental Protection Program," and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

The ... Baseline Environmental Management Report

The ... Baseline Environmental Management Report PDF Author:
Publisher:
ISBN:
Category : Nuclear weapons plants
Languages : en
Pages : 274

Get Book Here

Book Description


Idaho National Laboratory Environmental Monitoring Plan

Idaho National Laboratory Environmental Monitoring Plan PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1,?Environmental Protection Program,? and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

Baseline Environmental Management Report

Baseline Environmental Management Report PDF Author:
Publisher:
ISBN:
Category : Radioactive pollution
Languages : en
Pages : 274

Get Book Here

Book Description
The Baseline Environmental Management Report (Baseline Report) is an analytical tool to help guide the Departmental decisions and provide an accounting of the Department's progress, spending, and plans. In addition to illustrating the assumed path forward, the 1996 Baseline Report presents policy analyses that examine the consequences of modifying key program assumptions.

Idaho National Laboratory Site Pollution Prevention Plan

Idaho National Laboratory Site Pollution Prevention Plan PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
It is the policy of the Department of Energy (DOE) that pollution prevention and sustainable environmental stewardship will be integrated into DOE operations as a good business practice to reduce environmental hazards, protect environmental resources, avoid pollution control costs, and improve operational efficiency and mission sustainability. In furtherance of this policy, DOE established five strategic, performance-based Pollution Prevention (P2) and Sustainable Environmental Stewardship goals and included them as an attachment to DOE O 450.1, Environmental Protection Program. These goals and accompanying strategies are to be implemented by DOE sites through the integration of Pollution Prevention into each site's Environmental Management System (EMS). This document presents a P2 and Sustainability Program and corresponding plan pursuant to DOE Order 450.1 and DOE O 435.1, Radioactive Waste Management. This plan is also required by the state of Idaho, pursuant to the Resource Conservation and Recovery Act (RCRA) partial permit. The objective of this document is to describe the Idaho National Laboratory (INL) Site P2 and Sustainability Program. The purpose of the program is to decrease the environmental footprint of the INL Site while providing enhanced support of its mission. The success of the program is dependent on financial and management support. The signatures on the previous page indicate INL, ICP, and AMWTP Contractor management support and dedication to the program. P2 requirements have been integrated into working procedures to ensure an effective EMS as part of an Integrated Safety Management System (ISMS). This plan focuses on programmatic functions which include environmentally preferable procurement, sustainable design, P2 and Sustainability awareness, waste generation and reduction, source reduction and recycling, energy management, and pollution prevention opportunity assessments. The INL Site P2 and Sustainability Program is administratively managed by the INL Site P2 Coordinator. Development and maintenance of this overall INL Site plan is ultimately the responsibility of DOE-ID. This plan is applicable to all INL Site contractors except those at the Naval Reactors Facility.

Idaho National Laboratory Site Long-Term Stewardship Implementation Plan

Idaho National Laboratory Site Long-Term Stewardship Implementation Plan PDF Author: B. E. Olaveson
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
The U.S. Department of Energy has established long-term stewardship programs to protect human health and the environment at sites where residual contamination remains after site cleanup. At the Idaho National Laboratory Site, Comprehensive Environmental Response, Compensation, and Liability Act (CERLA) long-term stewardship activities performed under the aegis of regulatory agreements, the Federal Facility Agreement and Consent Order for the Idaho National Laboratory, and state and federal requirements are administered primarily under the direction of the Idaho Cleanup Project. It represents a subset of all on-going environmental activity at the Idaho National Laboratory Site. This plan provides a listing of applicable CERCLA long-term stewardship requirements and their planned and completed implementation goals. It proffers the Long-Term Stewardship Environmental Data Warehouse for Sitewide management of environmental data. This plan will be updated as needed over time, based on input from the U.S. Department of Energy, its cognizant subcontractors, and other local and regional stakeholders.

Complete Guide to the Idaho National Laboratory (INL) - History from Atomic Reactors to Nuclear Waste Cleanup, Rickover and the Nuclear Navy, SL-1 Fatal Reactor Accident, Uranium and Plutonium

Complete Guide to the Idaho National Laboratory (INL) - History from Atomic Reactors to Nuclear Waste Cleanup, Rickover and the Nuclear Navy, SL-1 Fatal Reactor Accident, Uranium and Plutonium PDF Author: Department of Defense
Publisher:
ISBN: 9781521021439
Category :
Languages : en
Pages : 447

Get Book Here

Book Description
Two comprehensive histories of the Idaho National Laboratory (INL) provide extensive information about the lab's role in the development of nuclear reactors and other technologies, covering the period from before its establishment in 1949 through 2010. Originally created as the National Reactor Testing Station (NRTS), the laboratory has evolved over the years and acquired a number of slightly different names, including the Idaho National Engineering Laboratory (INEL) and the Idaho National Engineering and Environmental Laboratory (INEEL). The history of dozens of important atomic reactors is outlined in these reports. There also is coverage of the famous SL-1 reactor accident. Contents: Proving the Principle * 1 Aviator's Cave * 2 The Naval Proving Ground * 3 The Uranium Trail Leads To Idaho * 4 The Party Plan * 5 Inventing The Testing Station * 6 Fast Flux, High Flux And Rickover's Flux * 7 Safety Inside And Outside The Fences * 8 The Reactor Zoo Goes Critical * 9 Hot Stuff * 10 Cores And Competencies * 11 The Chem Plant * 12 Reactors Beget Reactors * 13 The Triumph Of Political Gravity Over Nuclear Flight * 14 Imagining The Worst * 15 The SL-1 Reactor * 16 The Aftermath * 17 Science In The Desert * 18 The Shaw Effect * 19 And The Idaho Boost * 20 A Question Of Mission * 21 By The End Of This Decade * 22 Jumping The Fence * 23 The Endowment Of Uranium * 24 The Uranium Trail Fades * 25 Mission: Future * Transformed: A Recent History of the Idaho National Laboratory, 2000-2010 Transformed: A Recent History of the Idaho National Laboratory, 2000-2010 * 1 INTRODUCTION: FORGING OPPORTUNITIES FROM ADVERSITY * 2 WE HAVE A DEAL 1995-2000 * BLUEPRINT FOR CLEANUP * ADDING AN "E": THE NATION'S ENGINEERING & ENVIRONMENTAL LABORATORY * HARD LESSONS LEARNED * GOING FORWARD * 3 CLEAN IT UP, CLOSE IT DOWN 2000-2003 * MAKE NO MISTAKE; CHANGE IS COMING * INSIDE THE LABORATORY * BREAKTHROUGH * JUMPSTARTING THE SITE'S TRANSFORMATION * 4 BRINGING CREATIVITY TO THE TABLE * DIVISION AND UNIFICATION * WORKING THE 60/40 RATIO * RETURN TO NUCLEAR ENERGY RESEARCH * ADVANCED TEST REACTOR * CENTER FOR ADVANCED ENERGY STUDIES * "WORK FOR OTHERS" AND NON-DOE WORK * NASA PROGRAM * SPECIFIC MANUFACTURING CAPABILITY PROJECT (SMC) AND NATIONAL SECURITY PROGRAMS. * SUMMARY * 5 BALANCING THE MACHINE WITH THE GARDEN * IDAHO CLEANUP PROJECT * FORGING COMMUNITY RELATIONSHIPS * ENVIRONMENTAL STEWARDSHIP * 6 FUTURE VISION During the first decade of this century, Idaho National Laboratory (INL) got a new name, a new structure, and a newly-revitalized mission as the nation's lead nuclear energy research laboratory. For a laboratory that began the decade in search of a well-defined mission and being offered up for cleanup and closure, the 2000s saw a dramatic turnaround. As the last century ended, Idaho's national laboratory was still known as the Idaho National Engineering and Environmental Laboratory (INEEL), the last "e" in the acronym symbolizing the fact that the majority of the lab's budget came from the Department of Energy's Environmental Management program. As the new century progressed, however, the department merged INEEL and Argonne National Laboratory-West (ANL-W) into one unified "INL." The result was a nearly billion dollar a year entity that led the newly-revitalized interest in nuclear power, in a country trying to cope with the specter of global warming and rising carbon emissions. To accommodate this growing mission and revitalize a laboratory that had not seen much in the way of new infrastructure over the past 20 years or so, the Department of Energy and Congress invested over $900 million in the lab through the Idaho Facilities Management Fund. That money was spent upgrading the infrastructure at the Advanced Test Reactor Complex and the Materials and Fuels Complex at the desert site, and at the Research and Education Campus in Idaho Falls - the three areas where the INL's primary nuclear energy research mission is carried out.

Idaho National Laboratory (INL) Sitewide Institutional Controls Plan

Idaho National Laboratory (INL) Sitewide Institutional Controls Plan PDF Author: W. L. Jolley
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
On November 9, 2002, the U.S. Environmental Protection Agency (EPA), the U.S. Department of Energy (DOE), and the Idaho Department of Environmental Quality approved the Record of Decision Experimental Breeder Reactor-I/Boiling Water Reactor Experiment Area and Miscellaneous Sites, which requires a Sitewide Institutional Controls Plan for the then Idaho National Engineering and Environmental Laboratory (now known as the Idaho National Laboratory). This document, first issued in June 2004, fulfilled that requirement. The revision is needed to provide an update as remedial actions are completed and new areas of concern are found. This Sitewide Institutional Controls Plan is based on guidance in the May 3, 1999, EPA Region 10 Final Policy on the Use of Institutional Controls at Federal Facilities; the September 29, 2000, EPA guidance Institutional Controls: A Site Manager's Guide to Identifying, Evaluating, and Selecting Institutional Controls at Superfund and RCRA Corrective Action Cleanups; and the April 9, 2003, DOE Policy 454.1, "Use of Institutional Controls." These policies establish measures that ensure short- and long-term effectiveness of institutional controls that protect human health and the environment at federal facility sites undergoing remedial action pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and/or corrective action pursuant to the Resource Conservation and Recovery Act (RCRA). The site-specific institutional controls currently in place at the Idaho National Laboratory are documented in this Sitewide Institutional Controls Plan. This plan is being updated, along with the Idaho National Engineering and Environmental Laboratory Comprehensive Facilities and Land Use Plan, to reflect the progress of remedial activities and changes in CERCLA sites.

Idaho National Engineering Laboratory Environmental Restoration & Waste Management Environmental Impact Statement

Idaho National Engineering Laboratory Environmental Restoration & Waste Management Environmental Impact Statement PDF Author:
Publisher:
ISBN:
Category : Radioactive waste disposal
Languages : en
Pages : 44

Get Book Here

Book Description