Woodbridge Research Facility Remedial Investigation/Feasibility Study, Sampling and Analysis Plan. Volume 2. Quality Assurance Project Plan

Woodbridge Research Facility Remedial Investigation/Feasibility Study, Sampling and Analysis Plan. Volume 2. Quality Assurance Project Plan PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 0

Get Book Here

Book Description
U.S. Army Woodbridge Research Facility (WRF) was used in the past as a major military communications center and a research and development laboratory where electromagnetic pulse energy was tested on military and other equipment. "RF is presently an inactive facility on the Base Realignment and Closure (BRAC) list. Past investigation activities indicate that PCBs are a primary chemical of concern. The WRF is presently in the process of being turned over to the USFWS to be used as a wildlife refuge and training facility. This task calls for provision of the necessary staff and equipment to provide remedial investigation/ feasibility support for the USAEC BRAC Program investigation at WRF. The scope of work includes Focused Feasibility studies, Remedial Investigations, Feasibility studies, ecological assessments, risk assessments, proposed plans, RODS and community relations support. This Sampling and Analysis Plan, Vol II: Quality Assurance Project Plan presents the data quality objectives, proposed laboratory methods for chemical and physical methods, and standard operating procedures for field operations.

Christlob Mylius

Christlob Mylius PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


Remedial Investigation Sampling and Analysis Plan for J-Field, Aberdeen Proving Ground, Maryland: Volume 2, Quality Assurance Project Plan

Remedial Investigation Sampling and Analysis Plan for J-Field, Aberdeen Proving Ground, Maryland: Volume 2, Quality Assurance Project Plan PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 0

Get Book Here

Book Description


Remedial Investigation/feasibility Study Work Plans

Remedial Investigation/feasibility Study Work Plans PDF Author: URS Corporation Group Consultants
Publisher:
ISBN:
Category : American Cleaners site
Languages : en
Pages :

Get Book Here

Book Description


Final Sampling and Analysis Plan

Final Sampling and Analysis Plan PDF Author: Malcolm Pirnie
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


Woodbridge Research Facility Remedial Investigation/Feasibility Study. Health and Safety Plan

Woodbridge Research Facility Remedial Investigation/Feasibility Study. Health and Safety Plan PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 100

Get Book Here

Book Description
The requirements set forth in 29 CFR 1910.120(f), shall be met for all employees performing or supervising hazardous waste operations. Medical exams shall be conducted as soon as possible upon notification by an employee that he/she has developed signs or symptoms indicating possible health hazards or overexposure to hazardous substances. Subcontractor personnel shall provide documentation of current status of participation in a medical surveillance program as required by 29 CFR 1910.120(f). Subcontractors unable to provide such documentation shall have successfully completed a medical examination as described in the above referenced OSHA standard prior to beginning work in a contaminated zone. Specific protocols for medical examinations are designed by an occupational physician. Common components include: (a) medical history and physical examination; (b) dipstick urinalysis, vision screen and vital signs; (c) spirometry ;(d) audiometry; (e) blood chemistry (complete blood count, liver function, kidney function, lipid metabolism, carbohydrate metabolism); (f) resting EkG (with approval); (g) chest radiograph (P/A). No project-specific medical examinations, or biological monitoring is required for this project.

Woodbridge Research Facility Remedial Investigation/Feasibility Study; Remedial Investigation, Volume 1 - Text, Tables, and Figures

Woodbridge Research Facility Remedial Investigation/Feasibility Study; Remedial Investigation, Volume 1 - Text, Tables, and Figures PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 0

Get Book Here

Book Description
RThe U.S. Army Woodbridge Research Facility (WRF) was used in the past as a major military communications center and a research and development laboratory where electromagnetic pulse energy was tested on military and other equipment. WRF is presently an inactive facility pursuant to the 1991 Base Realignment and Closure list. Past investigation activities indicate that polychlorinated biphenyl compounds (PCBs) are the primary chemicals of concern. A Remedial Investigation (RI) was performed to evaluate the nature and extent of contamination at WRF. Surface soil, subsurface soil, surface water/sediment, and storm water runoff samples were collected as part of the RI. Groundwater monitoring wells were installed and sampled to evaluate the quality of groundwater at WRF. A conceptual hydrogeologic model was developed using water levels obtained from the monitoring wells. A wetland delineation was performed to map the wetland areas of WRF. Human health and ecological risk assessments were performed to evaluate the potential risk to human and ecological receptors from exposures to chemicals present at WRF.

Final Remedial Investigation/feasibility Study Quality Assurance Project Plan, Addendum for Source Area Operable Units, Aerojet Superfund Site

Final Remedial Investigation/feasibility Study Quality Assurance Project Plan, Addendum for Source Area Operable Units, Aerojet Superfund Site PDF Author:
Publisher:
ISBN:
Category : Groundwater
Languages : en
Pages :

Get Book Here

Book Description


Final Phase II Remedial Investigation/feasibility Study Work Plan and Field Sampling Plan

Final Phase II Remedial Investigation/feasibility Study Work Plan and Field Sampling Plan PDF Author: PRC Environmental Management, Inc
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages :

Get Book Here

Book Description


Quality Assurance Project Plan/sampling and Analysis Plan for Performing Multi-media Split Sampling During RCRA Facility Investigation/corrective Measures Oversight, Koppers Company, Inc., Denver, Colorado

Quality Assurance Project Plan/sampling and Analysis Plan for Performing Multi-media Split Sampling During RCRA Facility Investigation/corrective Measures Oversight, Koppers Company, Inc., Denver, Colorado PDF Author: Jacobs Engineering Group
Publisher:
ISBN:
Category : Groundwater
Languages : en
Pages : 600

Get Book Here

Book Description