Tritium Processing at the Savannah River Site (SRS)

Tritium Processing at the Savannah River Site (SRS) PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 22

Get Book Here

Book Description
Tritium handling equipment and methods at the Savannah River Site Tritium Facilities have been continually improved since tritium processing operations began in 1955. Several new technologies were introduced into the Tritium Facilities in the 1980's. One of these is the use of fluidless, mechanical pumps (Normetex and Metal Bellows) to replace mercury pumps. A second is the use of metal hydride technology to store, purify, isotopically separate, pump, and compress hydrogen isotopes. Metal hydrides, such as La-Ni-Al alloys and Pd loaded on kieselguhr, offer significant flexibility and size advantages compared with conventional tritium handling technology, such as gas tanks, thermal diffusion columns, and mechanical compressors. Metal hydrides have been used in the Tritium Facilities since 1984 with the most important application of this technology being planned for the Replacement Tritium Facility, a $140 million facility scheduled for completion in 1990 and startup in 1991. 11 refs., 9 figs.

Tritium Processing at the Savannah River Site (SRS)

Tritium Processing at the Savannah River Site (SRS) PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 22

Get Book Here

Book Description
Tritium handling equipment and methods at the Savannah River Site Tritium Facilities have been continually improved since tritium processing operations began in 1955. Several new technologies were introduced into the Tritium Facilities in the 1980's. One of these is the use of fluidless, mechanical pumps (Normetex and Metal Bellows) to replace mercury pumps. A second is the use of metal hydride technology to store, purify, isotopically separate, pump, and compress hydrogen isotopes. Metal hydrides, such as La-Ni-Al alloys and Pd loaded on kieselguhr, offer significant flexibility and size advantages compared with conventional tritium handling technology, such as gas tanks, thermal diffusion columns, and mechanical compressors. Metal hydrides have been used in the Tritium Facilities since 1984 with the most important application of this technology being planned for the Replacement Tritium Facility, a $140 million facility scheduled for completion in 1990 and startup in 1991. 11 refs., 9 figs.

Startup Status of the Replacement Tritium Facility at the Savannah River Site

Startup Status of the Replacement Tritium Facility at the Savannah River Site PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 8

Get Book Here

Book Description
Tritium processing operations have been performed at the Savannah River Site (SRS) since 1955. It was determined in the early 1980's that new tritium facilities were required in order to meet increasingly stringent safety and environmental requirements while maintaining productivity. Construction of a new tritium handling facility, the Replacement Tritium Facility (RTF), began in 1987. This new facility incorporates the latest technology and design philosophy to mitigate accident consequences, enhance operational safety, minimize tritium losses to the environment, and ensure material safeguards and security. The RTF is currently completing startup operations. This report details key features addressed during the design and startup of this facility.

Tritium Confinement in a New Tritium Processing Facility at the Savannah River Site

Tritium Confinement in a New Tritium Processing Facility at the Savannah River Site PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 12

Get Book Here

Book Description
A new tritium processing facility, named the Replacement Tritium Facility (RTF), has been completed and is being prepared for startup at the Savannah River Site (SRS). The RTF has the capability to recover, purify and separate hydrogen isotopes from recycled gas containers. A multilayered confinement system is designed to reduce tritium losses to the environment. This confinement system is expected to confine and recover any tritium that might escape the process equipment, and to maintain the tritium concentration in the nitrogen glovebox atmosphere to less than 10−2 [mu]Ci/cc tritium.

Tritium Processing and Containment Practices at the Savannah River Site

Tritium Processing and Containment Practices at the Savannah River Site PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 0

Get Book Here

Book Description


NEW SYSTEMS FOR WASTE PROCESSING OF TRITIUM-CONTAINING GASESAT THE SAVANNAH RIVER SITE.

NEW SYSTEMS FOR WASTE PROCESSING OF TRITIUM-CONTAINING GASESAT THE SAVANNAH RIVER SITE. PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 5

Get Book Here

Book Description
A project to relocate and consolidate tritium processing activities from old, second generation buildings to newer buildings was initiated in the late 1990's at the Savannah River Site (SRS). This project replaces two existing gaseous process waste treatment systems currently operating in an older facility. The new waste gas processing systems located in the newer facility use recent technology, including metal getters, an innovative permeator design, and TCAP--Thermal Cycling Absorption Process--technology for removal of residual tritium prior to releasing the effluent to the environment. Startup testing results and corresponding lessons learned for these systems are presented. These systems have successfully completed startup testing and are operational.

Accelerator Production of Tritium at the Savannah River Site

Accelerator Production of Tritium at the Savannah River Site PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 412

Get Book Here

Book Description


Construction and Operation of a Tritium Extraction Facility at the Savannah River Site

Construction and Operation of a Tritium Extraction Facility at the Savannah River Site PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 168

Get Book Here

Book Description


הגדה של פסח

הגדה של פסח PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


Transporter Development for the Tritium Extraction Facility at the Savannah River Site

Transporter Development for the Tritium Extraction Facility at the Savannah River Site PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
The Commercial Light Water Reactor-Tritium Extraction Facility (CLWR-TEF) is planned for location at the Savannah River Site (SRS) as part of the US Department of Energy CLWR tritium production alternative. This new facility will rely on processes and equipment that are significantly different from those proven in the past or currently in use at SRS. For instance, the CLWR-TEF reference design employs remote modules to provide an inert processing atmosphere, secondary confinement for tritium and the primary confinement for particulate contamination. The primary component of this modular system is the Transporter. A Transporter mock-up was developed to demonstrate concept feasibility of the required processing functions (sealing, attachment/alignment and materials handling). The module design, the seal door selection, and the planned test program are discussed.

New Tritium Production Reactor Capacity Facilities, Siting, Construction and Operation

New Tritium Production Reactor Capacity Facilities, Siting, Construction and Operation PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 322

Get Book Here

Book Description