Technical Evaluation Report on the Second 10-year Interval Inservice Inspection Program Plan

Technical Evaluation Report on the Second 10-year Interval Inservice Inspection Program Plan PDF Author: M. T. Anderson
Publisher:
ISBN:
Category : Nuclear power plants
Languages : en
Pages : 41

Get Book Here

Book Description

Technical Evaluation Report on the Second 10-year Interval Inservice Inspection Program Plan

Technical Evaluation Report on the Second 10-year Interval Inservice Inspection Program Plan PDF Author: M. T. Anderson
Publisher:
ISBN:
Category : Nuclear power plants
Languages : en
Pages : 41

Get Book Here

Book Description


Title List of Documents Made Publicly Available

Title List of Documents Made Publicly Available PDF Author: U.S. Nuclear Regulatory Commission
Publisher:
ISBN:
Category : Nuclear energy
Languages : en
Pages : 688

Get Book Here

Book Description


Nuclear Regulatory Commission Issuances

Nuclear Regulatory Commission Issuances PDF Author: U.S. Nuclear Regulatory Commission
Publisher:
ISBN:
Category : Nuclear energy
Languages : en
Pages : 414

Get Book Here

Book Description


Energy Research Abstracts

Energy Research Abstracts PDF Author:
Publisher:
ISBN:
Category : Power resources
Languages : en
Pages : 1288

Get Book Here

Book Description


Federal Register

Federal Register PDF Author:
Publisher:
ISBN:
Category : Administrative law
Languages : en
Pages : 1574

Get Book Here

Book Description


Operating Reactors Licensing Actions Summary

Operating Reactors Licensing Actions Summary PDF Author:
Publisher:
ISBN:
Category : Nuclear power plants
Languages : en
Pages : 820

Get Book Here

Book Description


Proceedings of the ASME Pressure Vessels and Piping Conference--2005: Materials and fabrication

Proceedings of the ASME Pressure Vessels and Piping Conference--2005: Materials and fabrication PDF Author:
Publisher:
ISBN:
Category : Earthquake engineering
Languages : en
Pages : 998

Get Book Here

Book Description


Licensed Operating Reactors, Status Summary Report

Licensed Operating Reactors, Status Summary Report PDF Author:
Publisher:
ISBN:
Category : Nuclear power plants
Languages : en
Pages : 570

Get Book Here

Book Description


Analysis of Inservice Inspection Relief Requests

Analysis of Inservice Inspection Relief Requests PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 106

Get Book Here

Book Description
Nuclear Regulatory Commission (NRC) regulations require inspection (ISI) of boiling or pressurized water-cooled nuclear power plants be performed in accordance with a referenced edition and addenda of Section XI, ''Rules for Inservice Inspection of Nuclear Power Plant components, '' of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code. The regulations permit licensees to request relief from the NRC from specific ASME Code requirements that are determined to be impractical for the specific licensee. The NRC evaluates these requests and may grant such relief, but the NRC may also impose alternative or augmented inspections to assure structural reliability. The purpose, of this task was to evaluate the basis for ISI nondestructive examination (NDE) relief requests and to evaluate the effect of proposed ASME Code changes that would reduce the need for such requests or provide for more complete information in relief requests. This report contains the results of an analysis of an ISI relief request data base that has been expanded to include 1195 ISI relief requests versus the 296 relief requests covered in the first report in April 1987, EGG-SD-7430. Also relief requests were added to the data base which came from both first and second 10-year inspection intervals for several facilities. This provided the means to analyze the effect of recently approved ASME Code cases and updated Code requirements, some of which have been published as a result of earlier work on this task.

Materials Evaluation

Materials Evaluation PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 786

Get Book Here

Book Description