Remedial Investigation Report for J-Field, Aberdeen Proving Ground, Maryland. Volume 3

Remedial Investigation Report for J-Field, Aberdeen Proving Ground, Maryland. Volume 3 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 651

Get Book Here

Book Description
The Environmental Management Division of the U.S. Army Aberdeen Proving Ground (APG), Maryland, is conducting a remedial investigation (RI) and feasibility study (FS) of the J-Field area at APG, pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. As part of that activity, Argonne National Laboratory (ANL) conducted an ecological risk assessment (ERA) of the J-Field site. This report presents the results of that assessment.

Remedial Investigation Report for J-Field, Aberdeen Proving Ground, Maryland. Volume 3

Remedial Investigation Report for J-Field, Aberdeen Proving Ground, Maryland. Volume 3 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 651

Get Book Here

Book Description
The Environmental Management Division of the U.S. Army Aberdeen Proving Ground (APG), Maryland, is conducting a remedial investigation (RI) and feasibility study (FS) of the J-Field area at APG, pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. As part of that activity, Argonne National Laboratory (ANL) conducted an ecological risk assessment (ERA) of the J-Field site. This report presents the results of that assessment.

Tsjechisch (Kosmos taalgids. Wat en hoe).

Tsjechisch (Kosmos taalgids. Wat en hoe). PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


Remedial Investigation Sampling and Analysis Plan for J-Field, Aberdeen Proving Ground, Maryland: Volume 2, Quality Assurance Project Plan

Remedial Investigation Sampling and Analysis Plan for J-Field, Aberdeen Proving Ground, Maryland: Volume 2, Quality Assurance Project Plan PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 0

Get Book Here

Book Description


Voprosy partiĭnogo stroitelʹstva

Voprosy partiĭnogo stroitelʹstva PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 253

Get Book Here

Book Description


Remedial Investigation Work Plan for J-Field, Aberdeen Proving Ground, Maryland

Remedial Investigation Work Plan for J-Field, Aberdeen Proving Ground, Maryland PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 209

Get Book Here

Book Description
The purpose of an RI/FS is to characterize the nature and extent of the risks posed by contaminants present at a site and to develop and evaluate options for remedial actions. The overall objective of the RI is to provide a comprehensive evaluation of site conditions, types and quantities of contaminants present, release mechanisms and migration pathways, target populations, and risks to human health and the environment. The information developed during the RI provides the basis for the design and implementation of remedial actions during the FS. The purpose of this RI Work Plan is to define the tasks that will direct the remedial investigation of the J-Field site at APG.

Water-resources Investigations Report

Water-resources Investigations Report PDF Author:
Publisher:
ISBN:
Category : Hydrology
Languages : en
Pages : 208

Get Book Here

Book Description


Hydrogeologic Setting, Hydraulic Properties, and Ground-water Flow at the O-Field Area of Aberdeen Proving Ground, Maryland

Hydrogeologic Setting, Hydraulic Properties, and Ground-water Flow at the O-Field Area of Aberdeen Proving Ground, Maryland PDF Author: William S. L. Banks
Publisher:
ISBN:
Category : Groundwater flow
Languages : en
Pages : 36

Get Book Here

Book Description


Remedial Investigation Addendum Report Data Item A009. Volume 4: Appendices I-Z.

Remedial Investigation Addendum Report Data Item A009. Volume 4: Appendices I-Z. PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 539

Get Book Here

Book Description
The U.S. Army Environmental Center (USAEC) directed ABB Environmental Services, Inc. (ABB-ES), under Contract No. DAAA15-91-D-0008, to collect environmental samples at Fort Devens, Massachusetts to fill data gaps identified during initiation of the Feasibility Study (FS) for Group 1A sites. The Group 1A sites include the Shepley's Hill Landfill and Cold Spring Brook Landfill at Fort Devens. This Remedial Investigation (RI) Addendum report summarizes the supplemental field investigations, presents the data obtained, and updates the baseline risk assessment prepared for the RI report. Field investigation programs were conducted between September 1992 and July 1993 and included collecting and analyzing of sediment core samples from Plow Shop and Cold Spring Brook ponds, collecting and analyzing fish tissue samples from these two ponds, and conducting a macroinvertebrate study of the two ponds. In addition, several new monitoring wells were installed and groundwater samples were collected for analysis from 27 monitoring wells at Shepley's Hill Landfill and from 10 monitoring wells at Cold Spring Brook Landfill. Soil, sediment, and groundwater samples were also collected from several other areas, including Nonacoicus Brook Wetland and Grove Pond adjacent to Shepley's Hill Landfill, and the Magazine Area adjacent to Cold Spring Brook Landfill.

Remedial Investigation Addendum Report Data Item A009. Volume 1: Report Test

Remedial Investigation Addendum Report Data Item A009. Volume 1: Report Test PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 534

Get Book Here

Book Description
The U.S. Army Environmental Center (USAEC) directed ABB Environmental Services, Inc. (ABB-ES), under Contract No. DAAA15-91-D-0008, to collect environmental samples at Fort Devens, Massachusetts to fill data gaps identified during initiation of the Feasibility Study (FS) for Group 1A sites. The Group 1A sites include the Shepley's Hill Landfill and Cold Spring Brook Landfill at Fort Devens. This Remedial Investigation (RI) Addendum report summarizes the supplemental field investigations, presents the data obtained, and updates the baseline risk assessment prepared for the RI report. Field investigation programs were conducted between September 1992 and July 1993 and included collecting and analyzing of sediment core samples from Plow Shop and Cold Spring Brook ponds, collecting and analyzing fish tissue samples from these two ponds, and conducting a macroinvertebrate study of the two ponds. In addition, several new monitoring wells were installed and groundwater samples were collected for analysis from 27 monitoring wells at Shepley's Hill Landfill and from 10 monitoring wells at Cold Spring Brook Landfill. Soil, sediment, and groundwater samples were also collected from several other areas, including Nonacoicus Brook Wetland and Grove Pond adjacent to Shepley's Hill Landfill, and the Magazine Area adjacent to Cold Spring Brook Landfill.

Work Plan for the Feasibility Study for Remedial Action at J-Field, Aberdeen Proving Ground, Maryland

Work Plan for the Feasibility Study for Remedial Action at J-Field, Aberdeen Proving Ground, Maryland PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 182

Get Book Here

Book Description
The purpose of the feasibility study is to gather sufficient information to develop and evaluate alternative remedial actions to address contamination at J-Field in compliance with the NCP, CERCLA, and SARA. This FS Work Plan summarizes existing environmental data for each AOC and outlines the tasks to be performed to evaluate and select remedial technologies. The tasks to be performed will include (1) developing remedial action objectives and identifying response actions to meet these objectives; (2) identifying and screening remedial action technologies on the basis of effectiveness, implementability, and cost; (3) assembling technologies into comprehensive alternatives for J-Field; (4) evaluating, in detail, each alternative against the nine EPA evaluation criteria and comparing the alternatives to identify their respective strengths and weaknesses; and (5) selecting the preferred alternative for each operable unit.