Plan for Engineering and Design, Des Moines Recreational River and Greenbelt, Des Moines River, Iowa

Plan for Engineering and Design, Des Moines Recreational River and Greenbelt, Des Moines River, Iowa PDF Author:
Publisher:
ISBN:
Category : Des Moines Recreational River and Greenbelt (Iowa)
Languages : en
Pages : 19

Get Book Here

Book Description

Plan for Engineering and Design, Des Moines Recreational River and Greenbelt, Des Moines River, Iowa

Plan for Engineering and Design, Des Moines Recreational River and Greenbelt, Des Moines River, Iowa PDF Author:
Publisher:
ISBN:
Category : Des Moines Recreational River and Greenbelt (Iowa)
Languages : en
Pages : 19

Get Book Here

Book Description


Des Moines River, Recreational River and Greenbelt GDM

Des Moines River, Recreational River and Greenbelt GDM PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 330

Get Book Here

Book Description


Draft General Design Memorandum, Des Moines Recreational River and Greenbelt, Des Moines River, Iowa

Draft General Design Memorandum, Des Moines Recreational River and Greenbelt, Des Moines River, Iowa PDF Author:
Publisher:
ISBN:
Category : Des Moines Recreational River and Greenbelt (Iowa)
Languages : en
Pages :

Get Book Here

Book Description


Des Moines River, Recreational River and Greenbelt GDM

Des Moines River, Recreational River and Greenbelt GDM PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 352

Get Book Here

Book Description


Des Moines Recreational River and Greenbelt

Des Moines Recreational River and Greenbelt PDF Author:
Publisher:
ISBN:
Category : Amphitheaters
Languages : en
Pages :

Get Book Here

Book Description


Boundaries of the Des Moines Recreational River and Greenbelt, Iowa Project

Boundaries of the Des Moines Recreational River and Greenbelt, Iowa Project PDF Author:
Publisher:
ISBN:
Category : Des Moines River
Languages : en
Pages : 8

Get Book Here

Book Description


General Design Memorandum, Des Moines Recreational River and Greenbelt, Des Moines River, Iowa

General Design Memorandum, Des Moines Recreational River and Greenbelt, Des Moines River, Iowa PDF Author:
Publisher:
ISBN:
Category : Des Moines River Region (Minn. and Iowa)
Languages : en
Pages :

Get Book Here

Book Description


Des Moines Recreational River and Greenbelt Feature Design Memorandum #10 with Environmental Assessment

Des Moines Recreational River and Greenbelt Feature Design Memorandum #10 with Environmental Assessment PDF Author:
Publisher:
ISBN:
Category : Des Moines Recreational River and Greenbelt (Iowa)
Languages : en
Pages :

Get Book Here

Book Description


Red Rock Dam and Lake Red Rock O&M, Des Moines River

Red Rock Dam and Lake Red Rock O&M, Des Moines River PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 858

Get Book Here

Book Description


Annual Program Management Report (1990), Des Moines Recreational River and Greenbelt, Des Moines River, Iowa

Annual Program Management Report (1990), Des Moines Recreational River and Greenbelt, Des Moines River, Iowa PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 113

Get Book Here

Book Description
The General Design Memorandum (GDM) and Programmatic Environmental Impact Statement for the Des Moines Recreational River and Greenbelt were approved on August 1, 1988. The GDM includes a recommendation to increase the Federal Construction cost estimate, prepare Feature Design Memoranda (FDM) for nine projects, and submit annual reports which will include an update of the master plan. The 1989 Annual Program Management Report was the first yearly report prepared for the project. The Advisory Committee recommended and the Corps of Engineers approved the addition of 15 projects to the master plan, the preparation of Feature Design Memoranda for 11 projects, and the deletion of 2 projects which have proceeded to construction by local interests. The 1989 Annual Program Management Report was approved on October 2, 1989. For the 1990 Annual Program Management Report, the Advisory Committee has recommended the addition of 5 projects to the master plan, the preparation of Feature Design Memoranda for 3 potentially cost-shared projects and the deletion of 1 project which will be constructed by the local sensor.