The APF was shut down on September 23, 1993 and no operation was performed during this quarter. This report summarizes inspection, candle reinstallation, retrofit and accelerometer testing conducted during this three month outage.

PFBC HGCU Test Facility. Fourth Quarterly Technical Progress Report, [October--December 1993].

PFBC HGCU Test Facility. Fourth Quarterly Technical Progress Report, [October--December 1993]. PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 157

Get Book Here

Book Description
The APF was shut down on September 23, 1993 and no operation was performed during this quarter. This report summarizes inspection, candle reinstallation, retrofit and accelerometer testing conducted during this three month outage.

Energy Research Abstracts

Energy Research Abstracts PDF Author:
Publisher:
ISBN:
Category : Power resources
Languages : en
Pages : 544

Get Book Here

Book Description


PFBC HGCU Test Facility. Technical Progress Report: Third Quarter, CY 1993

PFBC HGCU Test Facility. Technical Progress Report: Third Quarter, CY 1993 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
This is the sixteenth Technical Progress Report submitted to the Department of Energy (DOE) in connection with the cooperative agreement between the DOE and Ohio Power Company for the Tidd PFBC (pressurized fluidized-bed combustion) Hot Gas Clean Up Test Facility (HGCU). This report covers the period of work completed during the Third Quarter of CY 1993. During this quarter, the Advanced Particle Filter (APF) was operated for a total of 1295 hours. This represents 58% availability during July, August, September, and including June 30 of the previous quarter. The operating dates and times since initial operation are summarized. The APF operating temperatures and differential pressures are provided. Details of the APF runs during this quarter are included in this report.

Government Reports Annual Index

Government Reports Annual Index PDF Author:
Publisher:
ISBN:
Category : Government publications
Languages : en
Pages : 1148

Get Book Here

Book Description


PFBC HGCU Test Facility. Fourth Quarterly Technical Progress Report, CY 1992

PFBC HGCU Test Facility. Fourth Quarterly Technical Progress Report, CY 1992 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 72

Get Book Here

Book Description
This is the thirteenth Technical Progress Report submitted to the Department of Energy (DOE) in connection with the cooperative agreement between the DOE and Ohio Power Company for the Tidd PFBC Hot Gas Clean Up Test Facility. This report covers the period of work completed during the Fourth Quarter of CY 1992. The following are highlights of the activities that occurred during this report period: Initial operation of the Advanced Particle Filter (APF) occurred during this quarter. The following table summarizes the operating dates and times. HGCU ash lockhopper valve plugged with ash. Primary cyclone ash pluggage. Problems with the coal water paste. Unit restarted warm 13 hours later. HGCU expansion joint No. 7 leak in internal ply of bellows. Problems encountered during these initial tests included hot spots on the APP, backup cyclone and instrumentation spools, two breakdowns of the backpulse air compressor, pluggage of the APF hopper and ash removal system, failure (breakage) of 21 filter candles, leakage of the inner ply of one (1) expansion joint bellows, and numerous other smaller problems. These operating problems are discussed in detail in a subsequent section of this report. Following shutdown and equipment inspection in December, design modifications were initiated to correct the problems noted above. The system is scheduled to resume operation in March, 1993.

Government Reports Announcements & Index

Government Reports Announcements & Index PDF Author:
Publisher:
ISBN:
Category : Science
Languages : en
Pages : 576

Get Book Here

Book Description


Acid Precipitation

Acid Precipitation PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 500

Get Book Here

Book Description


PFBC HGCU Test Facility. Second Quarterly Technical Progress Report, CY 1993

PFBC HGCU Test Facility. Second Quarterly Technical Progress Report, CY 1993 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 98

Get Book Here

Book Description
This is the fifteenth Technical Progress Report submitted to the Department of Energy (DOE) in connection with the cooperative agreement between the DOE and Ohio Power Company for the Tidd Pressurized Fluidized Bed Combustion (PFBC) Hot Gas Clean Up Test Facility. This report covers the period of work completed during the Second Quarter of CY 1993. Work accomplished during the reporting period includes: the expansion joint heaters and control system were installed and tested. The system consists of 8 bellows heaters and 14 heaters on the adjacent piping. During initial testing, 11 of the 14 pipe and heaters failed due to overheating caused by control and installation problems; A pneumatically powered vibrator was installed in the APF manway nozzle to vibrate the hopper liner during back pulsing. This should eliminate any build-up on the pipes of the hopper; Two half capacity diesel driven back-up pulse air compressors were rented and installed; Installation of an emergency ash removal system was completed. The system enables ash to be removed via a line connected to the pipe between the outlet of the screw cooler and the inlet of the lockhopper system; Installation of the spoiling air line, valves, and metering orifice to the primary cyclone was completed; Numerous revisions were made to the Net 90 instrumentation and control system and the POPS data trending system to enhance system control and performance monitoring capability.

PFBC HGCU Test Facility. Fourth Quarterly Technical Progress Report, CY 1991

PFBC HGCU Test Facility. Fourth Quarterly Technical Progress Report, CY 1991 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 23

Get Book Here

Book Description
This is the ninth technical progress report submitted to the Department of Energy in connection with the Cooperative Agreement between DOE and Ohio Power Company for the Tidd PFBC Hot Gas Clean Up Test Facility. This report covers the period of work completed during the Fourth Quarter of CY 1991. During the reporting period, work focused on completing Task 2, Hot Gas Clean Up (HGCU) Detailed Design and Task 4, Procurement Activities to support the installation of the Westinghouse advanced particle filter (APE). The following significant events occurred during this report period: The mechanical/structural contractor (Pullman Power Products) mobilized at the Tidd site in December and began erecting steel framing for the APF. A contract modification was issued to Babcock & Wilcox Co. for the supply of piping materials required for the combustor internal modifications. A contract was awarded to ANARAD, Inc. for a gas analysis system. A contract was prepared and is being processed for electrical erection.

PFBC HGCU Test Facility. Technical Progress Report, Fourth Quarter, CY 1994

PFBC HGCU Test Facility. Technical Progress Report, Fourth Quarter, CY 1994 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 311

Get Book Here

Book Description
During this quarter, the Tidd Hot Gas Clean Up System completed a 691-hour test run which began during the third quarter. Table 1 summarizes all test runs since initial operation. Following this test run the system was shut down and the filter opened for inspection and recandling. The system remained out of service during the remainder of the quarter. In addition to monitoring and evaluating the performance of the HGCU system during testing, engineering effort was devoted to posttest inspection of the APF (Advanced Particle Filter) and evaluation of the effects of totally spoiling the primary cyclone. In addition, the authors worked with Westinghouse in the selection of replacement candles that were installed during the fourth quarter. During the unit outage this quarter, the primary cyclone upstream of the APF was modified to force all of the ash to pass through the cyclone and enter the APF without using spoiling air. Appendices to this report describe the dust shroud support strap design; an analysis of the effect of support-transferred vibrations on the failure of ceramic candle filters; the Tidd APF operation; the Tidd APF boroscope inspection; a general inspection of Tidd filter internals; tally of Tidd filters; ash formations in the W-APF-October 1994 post-test inspection; characterization of the as-manufactured and PFBC-exposed 3M CVI-SiC composite filter matrix; strength characterization of the first and second generation candle filters after 1,705 hours of PFBC operation at Tidd; and filters used in the December 1994 recandling effort at Tidd.