Lummi Bay Marina Navigation Improvements, Whatcom County

Lummi Bay Marina Navigation Improvements, Whatcom County PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 400

Get Book Here

Book Description

Lummi Bay Marina Navigation Improvements, Whatcom County

Lummi Bay Marina Navigation Improvements, Whatcom County PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 400

Get Book Here

Book Description


Lummi Bay Marina, Whatcom County, Washington. Draft Detailed Project Report and Draft Environmental Impact Statement

Lummi Bay Marina, Whatcom County, Washington. Draft Detailed Project Report and Draft Environmental Impact Statement PDF Author: CORPS OF ENGINEERS SEATTLE WA SEATTLE DISTRICT.
Publisher:
ISBN:
Category :
Languages : en
Pages : 369

Get Book Here

Book Description
Conducted under Section 107 of the 1960 River and Harbor Act, as amended, the Corps of Engineers study determined the feasibility of federal involvement in constructing a navigation access channel and other improvements to service a proposed public commercial fishing boat marina at Lummi Day in northwestern Washington. Principal features of the tentatively recommended plan are (1) a moorage basin for 438 commercial fishing boats with floats, docks, etc., and a public boat launching ramp for small boats to be built by the Lummi Indian Tribe behind a diked portion of their existing aquaculture pond project; (2) federal navigation channel, 7300 feet long by 100 feet wide by 12 feet deep at mean lower low water with timber pile breakwater protection at the moorage basin entrance and a turning basin and local access channel; (3) disposal of approximately 1,470,000 cubic yards of material from channel and moorage basin dredging behind containment dikes to provide 65 acres of fill for marina support buildings and other water-related development by the Lummi Tribe; (4) mitigation for project-related impacts to shallow-water habitat by reintroducing 65 acres of the existing sea pond project not now in use for aquaculture to tidal action and preserving the portion as an undeveloped tidal area with establishment of wetland marshes and planting of eelgrass in selected areas; (5) maintenance dredging of channels and moorage basin with disposal of about 2 to 3 acres of dredged fill every five years at a 25-acre site within the unused sea pond.

Lummi Bay Marina, Whatcom County, Washington

Lummi Bay Marina, Whatcom County, Washington PDF Author: United States. Army. Corps of Engineers
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages :

Get Book Here

Book Description


Federal Register

Federal Register PDF Author:
Publisher:
ISBN:
Category : Administrative law
Languages : en
Pages : 1514

Get Book Here

Book Description


Bellingham Harbor Navigation Project

Bellingham Harbor Navigation Project PDF Author:
Publisher:
ISBN:
Category : Channels (Hydraulic engineering)
Languages : en
Pages : 110

Get Book Here

Book Description


EIS Cumulative

EIS Cumulative PDF Author:
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages : 260

Get Book Here

Book Description


Unconfined Open Water Disposal for Dredged Material, Phase II (north and South Puget Sound)

Unconfined Open Water Disposal for Dredged Material, Phase II (north and South Puget Sound) PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 282

Get Book Here

Book Description


Tidal-flushing Characteristics of the Proposed Lummi Bay Marina, Whatcom County, Washington

Tidal-flushing Characteristics of the Proposed Lummi Bay Marina, Whatcom County, Washington PDF Author: William Morse Watts
Publisher:
ISBN:
Category : Lummi Bay (Wash.)
Languages : en
Pages : 0

Get Book Here

Book Description
Tidal-flushing of the proposed Lummi Bay Marina was studied using a physical model. The model was distinct from those of other regional marinas in that it included a berm around the edges, depth contours, sloping walls, and simulated mixed-semidiurnal tides. Spectrophotometric measurements of absorbance of dye in water resulted in the calculation of exchange-coefficients and flushing efficiency. Exchange coefficients in the physical model increased with increasing tidal range, suggesting a tendency for decreased water quality during smaller tides. Exchange was best in spring-tide simulations, but water tended to stagnate during the smaller ebb and flood cycles in both spring and neap simulations. Water quality in the proposed Lummi Bay Marina will probably also vary with tidal range and may be vulnerable to depletion of dissolved oxygen and increased temperature during periods of smaller tidal exchange. Circulation gyres forming in the model contained less-mixed water toward their centers than at their edges. The primary counterclockwise-gyre retained enough momentum to remain intact throughout a tidal cycle. Neap tides did not induce as strong a circulation of water as did spring tides. Secondary clockwise-gyres formed in the north and south corners of the model over the berm. Those gyres were destroyed each time the berm was exposed, causing short-term water-quality problems. In the event of construction of the marina, the problem of tidal-flushing should be studied using a field approach to verify the results of this study.

Environment Reporter

Environment Reporter PDF Author:
Publisher:
ISBN:
Category : Environmental law
Languages : en
Pages : 1528

Get Book Here

Book Description
Current developments: a weekly review of pollution control and related environmental management problems -- Decisions (later published in bound volumes. Environment reporter. Cases) --Monographs -- Federal laws -- Federal regulations --State air laws -- State water laws -- State solid waste, land use laws -- Mining.

Lummi Bay Marina, Whatcom County, Washington

Lummi Bay Marina, Whatcom County, Washington PDF Author: United States. Army. Corps of Engineers. Seattle District
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages :

Get Book Here

Book Description