Integrated Maintenance Information System (imis) ... Final Program Report, Volume 2: Program Methodology ... Al/hr-tr-1995-0041 ... U

Integrated Maintenance Information System (imis) ... Final Program Report, Volume 2: Program Methodology ... Al/hr-tr-1995-0041 ... U PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


INTEGRATED MAINTENANCE INFORMATION SYSTEM (IMIS) ... FINAL PROGRAM REPORT, VOLUME 2

INTEGRATED MAINTENANCE INFORMATION SYSTEM (IMIS) ... FINAL PROGRAM REPORT, VOLUME 2 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


Integrated Maintenance Information System (IMIS). Volume 2: Program Methodology

Integrated Maintenance Information System (IMIS). Volume 2: Program Methodology PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 67

Get Book Here

Book Description
Volume 2 of the IMIS Final Program Report discusses the three phases of the IMIS program: Requirements Analysis; System Design and Development; and Demonstration System Fabrication and Field Evaluation. Main objectives of the Requirements Analysis phase were to: (1) identify and analyze the functional, informational, and human computer interface requirements for an IMIS in the Air Force maintenance environment; (2) develop a system architecture which supported those requirements; and (3) develop system functional requirements specifications. Primary products of the Requirements Analysis were the IMIS Architecture and the System/Segment Specification. During System Design and Development, a subset of IMIS requirements was selected for implementation and demonstration. Upon completion of the IMIS demonstration system, hardware and software were installed and field tested at Luke Air Force Base, Arizona. Objectives of the field evaluation were to: (1) test the IMIS concept under realistic operational conditions, (2) evaluate IMIS effectiveness in supporting the unit maintenance mission, (3) demonstrate the technical advantages of IMIS over the current system, and (4) identify strengths and weaknesses of the demonstration system which could be used in refining requirements for a production implementation.

Integrated Maintenance Information System (imis) ... Final Program Report, Vol. 1: Executive Summary ... Al/hr-tr-1995-0040 ... U.s. de

Integrated Maintenance Information System (imis) ... Final Program Report, Vol. 1: Executive Summary ... Al/hr-tr-1995-0040 ... U.s. de PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


Integrated Maintenance Information System (imis) ... Final Program Report, Vol. 3: Results, Conclusions, and Recommendations ... Al/hr

Integrated Maintenance Information System (imis) ... Final Program Report, Vol. 3: Results, Conclusions, and Recommendations ... Al/hr PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


Government Reports Announcements & Index

Government Reports Announcements & Index PDF Author:
Publisher:
ISBN:
Category : Government publications
Languages : en
Pages : 530

Get Book Here

Book Description


Integrated Maintenance Information System (IMIS). Volume 1: Executive Summary

Integrated Maintenance Information System (IMIS). Volume 1: Executive Summary PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 34

Get Book Here

Book Description
The Executive Summary is the first volume in a three-volume final program report. It contains a summary of the objectives, methodology, results, conclusions, and recommendations of the Integrated Maintenance Information System (IMIS) program. The overall scope of the IMIS program was to (1) identity and define the requirements for IMIS; (2) develop specifications documenting the requirements; (3) design and develop a demonstration system capable of supporting the essential IMIS requirements; (4) evaluate the IMIS concept and requirements using the demonstration system; and (3) finalize the IMIS specifications by incorporating the results of the tests, demonstrations, and evaluations. The program was structured to satisfy the scope by applying information gained during each phase to the subsequent phases. The IMIS Field Test and Demonstration was separated into three parts: Debrief Test, End-to-End Demonstration, and Fault Isolation Test. The primary objectives of these activities were to (1) test the IMIS concept under realistic operational conditions, where possible, (2) evaluate the effectiveness of IMIS in supporting the maintenance mission of the unit, (3) demonstrate the technical advantages of IMIS over the current system, and (4) identity strengths and weaknesses of the demonstration system which could be used in defining requirements for a production implementation.

Integrated Maintenance Information System (imis): User Field Demonstration and Test ... Al/hr-tr-1995-0034 ... U.s. Department of de

Integrated Maintenance Information System (imis): User Field Demonstration and Test ... Al/hr-tr-1995-0034 ... U.s. Department of de PDF Author: United States. Department of the Air Force
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


Integrated Maintenance Information System (IMIS) Diagnostic Module Redesign

Integrated Maintenance Information System (IMIS) Diagnostic Module Redesign PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 129

Get Book Here

Book Description
This technical report describes Research and Development efforts to redesign and enhance the Integrated Maintenance Information System Diagnostic Module (MIS-DM). The diagnostic module, redesigned in Smalltalk/V and utilizing information from the Content Data Model (CDM), provides technical support to the maintenance technician by furnishing a wide range of capabilities to assist in the selection of an efficient sequence of maintenance tasks. Object-Oriented (OO) rapid prototyping techniques were used to create a diagnostic module compatible with hierarchical data base concepts employed by the CDM. The enhanced IMIS diagnostic module now provides three modes of assessment (functional, physical, and degraded) whereas the previous version provided only the functional mode. Other IMIS diagnostic module enhancements further expanded diagnostic capabilities with the implementation of algorithms to provide an access group option, 'But Not' data entry, presentation of test results, and a revised critically function.

Integrated Maintenance Information System Diagnostic Module (IMIS-DM). Version 5.0

Integrated Maintenance Information System Diagnostic Module (IMIS-DM). Version 5.0 PDF Author: Garth Cooke
Publisher:
ISBN:
Category :
Languages : en
Pages : 56

Get Book Here

Book Description
The Air Force Human Resources Laboratory/Combat Logistics Branch (AFHRL/LRC) is engaged in the research and development (R and D) of an Integrated Maintenance Information System (IMIS). This system will be capable of accessing and integrating information from several Air Force data bases to provide technical support to the maintenance technician. This support will be provided by a portable computer maintenance aid which will provide instructions for accomplishing maintenance tasks. A diagnostic module will be contained in the portable computer software to help the technician in performing complex diagnostic tasks. This paper is a comprehensive description of the IMIS diagnostic Module (IMIS-DM) Version 5.0.