Environmental Assessment for Housing Demolition, Construction, Renovation, and Leasing Bethel Manor, Lighter-than-Air, and Heavier-than-Air Military Family Housing Areas

Environmental Assessment for Housing Demolition, Construction, Renovation, and Leasing Bethel Manor, Lighter-than-Air, and Heavier-than-Air Military Family Housing Areas PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 337

Get Book Here

Book Description
The purpose of the Proposed Action is to privatize MFH at Langley AFB. Privatizing MFH includes conveying 1,496 existing units to a privatization contractor and leasing the property on which the units are located to the contractor. This EA evaluates the No Action Alternative, the Proposed Action, the Maximum Development Alternative, and cumulative impacts of other actions. Under the No Action Alternative, the 1,496 existing MFH units would not be conveyed to a privatization contractor and the units would continue to be used to house military personnel and dependents. The Proposed Action and Maximum Development Alternative include conveying 1,496 units and associated infrastructure and leasing 350 acres associated with the MFH to a privatization contractor. Under the Proposed Action Alternative, the contractor would demolish 1,104 units in the Bethel Manor area and construct 1,049 replacement units, construct two units in the HTA area, renovate 109 units (47 units in the LTA and 62 units in the HTA area), and convey?as is? 270 units (148 units in the 2000 area of Bethel Manor, 72 units in the LTA area, and 50 units in the HTA area). The contractor would operate, maintain, and manage an MFH inventory totaling 1,430 units. Under the Maximum Development Alternative, the contractor would demolish all 1,252 units in Bethel Manor and construct 1,211 replacement units. No units would be renovated at Bethel Manor under the Maximum Development Alternative. Construction and renovation activities in the LTA and HTA housing areas would remain the same as the Proposed Action. The privatization contractor would manage an inventory totaling 1,444 units. The privatization contractor would manage the housing development for a minimum of 50 years under the Proposed Action or Maximum Development Alternative. Resources considered in the impact analysis were: noise, land use, coastal zone, air.

Environmental Assessment for Housing Demolition, Construction, Renovation, and Leasing Bethel Manor, Lighter-than-Air, and Heavier-than-Air Military Family Housing Areas

Environmental Assessment for Housing Demolition, Construction, Renovation, and Leasing Bethel Manor, Lighter-than-Air, and Heavier-than-Air Military Family Housing Areas PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 337

Get Book Here

Book Description
The purpose of the Proposed Action is to privatize MFH at Langley AFB. Privatizing MFH includes conveying 1,496 existing units to a privatization contractor and leasing the property on which the units are located to the contractor. This EA evaluates the No Action Alternative, the Proposed Action, the Maximum Development Alternative, and cumulative impacts of other actions. Under the No Action Alternative, the 1,496 existing MFH units would not be conveyed to a privatization contractor and the units would continue to be used to house military personnel and dependents. The Proposed Action and Maximum Development Alternative include conveying 1,496 units and associated infrastructure and leasing 350 acres associated with the MFH to a privatization contractor. Under the Proposed Action Alternative, the contractor would demolish 1,104 units in the Bethel Manor area and construct 1,049 replacement units, construct two units in the HTA area, renovate 109 units (47 units in the LTA and 62 units in the HTA area), and convey?as is? 270 units (148 units in the 2000 area of Bethel Manor, 72 units in the LTA area, and 50 units in the HTA area). The contractor would operate, maintain, and manage an MFH inventory totaling 1,430 units. Under the Maximum Development Alternative, the contractor would demolish all 1,252 units in Bethel Manor and construct 1,211 replacement units. No units would be renovated at Bethel Manor under the Maximum Development Alternative. Construction and renovation activities in the LTA and HTA housing areas would remain the same as the Proposed Action. The privatization contractor would manage an inventory totaling 1,444 units. The privatization contractor would manage the housing development for a minimum of 50 years under the Proposed Action or Maximum Development Alternative. Resources considered in the impact analysis were: noise, land use, coastal zone, air.

Draft Environmental Assessment

Draft Environmental Assessment PDF Author: United States. Air Force. Langley Air Force Base (Va.)
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages :

Get Book Here

Book Description


Environmental Assessment

Environmental Assessment PDF Author: United States. Air Force. Air Combat Command
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages :

Get Book Here

Book Description


Environmental Assessment Guide for Housing Projects

Environmental Assessment Guide for Housing Projects PDF Author: United States. Department of Housing and Urban Development. Office of Housing
Publisher:
ISBN:
Category : Environmental health
Languages : en
Pages : 152

Get Book Here

Book Description


The Historical Archaeology of Virginia from Initial Settlement to the Present

The Historical Archaeology of Virginia from Initial Settlement to the Present PDF Author: Clarence R. Geier
Publisher: Createspace Independent Publishing Platform
ISBN: 9781541023482
Category :
Languages : en
Pages : 232

Get Book Here

Book Description
The book includes six chapters that cover Virginia history from initial settlement through the 20th century plus one that deals with the important role of underwater archaeology. Written by prominent archaeologists with research experience in their respective topic areas, the chapters consider important issues of Virginia history and consider how the discipline of historic archaeology has addressed them and needs to address them . Changes in research strategy over time are discussed , and recommendations are made concerning the need to recognize the diverse and often differing roles and impacts that characterized the different regions of Virginia over the course of its historic past. Significant issues in Virginia history needing greater study are identified.

Bethlehem Revisited

Bethlehem Revisited PDF Author: Floyd I. Brewer
Publisher:
ISBN: 9780963540201
Category : Bethlehem (N.Y.)
Languages : en
Pages : 501

Get Book Here

Book Description


The Virginia Landmarks Register

The Virginia Landmarks Register PDF Author: Calder Loth
Publisher: University of Virginia Press
ISBN: 0813918626
Category : Historic buildings
Languages : en
Pages : 650

Get Book Here

Book Description
The Virginia Landmarks Register, fourth edition, will create for the reader a deeper awareness of a unique legacy and will serve to enhance the stewardship of Virginia's irreplaceable heritage.

Fact Stranger Than Fiction

Fact Stranger Than Fiction PDF Author: John Patterson Green
Publisher:
ISBN:
Category : African Americans
Languages : en
Pages : 480

Get Book Here

Book Description


The Negro in Chicago

The Negro in Chicago PDF Author: Chicago Commission on Race Relations
Publisher:
ISBN:
Category : History
Languages : en
Pages : 866

Get Book Here

Book Description


Reminiscences of Famous Georgians

Reminiscences of Famous Georgians PDF Author: Lucian Lamar Knight
Publisher:
ISBN:
Category : American literature
Languages : en
Pages : 786

Get Book Here

Book Description