Charleston Harbor, South Carolina Deep Draft Navigation Project, Communication from the Acting Assistant Secretary (Civil Works), the Department of the Army

Charleston Harbor, South Carolina Deep Draft Navigation Project, Communication from the Acting Assistant Secretary (Civil Works), the Department of the Army PDF Author: United States. Congress. House. Committee on Transportation and Infrastructure
Publisher:
ISBN:
Category : Dredging
Languages : en
Pages : 212

Get Book Here

Book Description

Charleston Harbor, South Carolina Deep Draft Navigation Project, Communication from the Acting Assistant Secretary (Civil Works), the Department of the Army

Charleston Harbor, South Carolina Deep Draft Navigation Project, Communication from the Acting Assistant Secretary (Civil Works), the Department of the Army PDF Author: United States. Congress. House. Committee on Transportation and Infrastructure
Publisher:
ISBN:
Category : Dredging
Languages : en
Pages : 212

Get Book Here

Book Description


Charleston Harbor, South Carolina Deep Draft Navigation Project

Charleston Harbor, South Carolina Deep Draft Navigation Project PDF Author: United States. Office of the Assistant Secretary of the Army (Civil Works)
Publisher:
ISBN:
Category : Channels (Hydraulic engineering)
Languages : en
Pages : 190

Get Book Here

Book Description


Charleston Harbor, South Carolina Deep Draft Navigation Project

Charleston Harbor, South Carolina Deep Draft Navigation Project PDF Author: United States. Office of the Assistant Secretary of the Army (Civil Works)
Publisher:
ISBN:
Category : Channels (Hydraulic engineering)
Languages : en
Pages : 214

Get Book Here

Book Description


Final Report Charleston Harbor Navigation Improvement Project (Post 45)

Final Report Charleston Harbor Navigation Improvement Project (Post 45) PDF Author: United States. Army. Corps of Engineers. Charleston District
Publisher:
ISBN:
Category : Dredging
Languages : en
Pages : 113

Get Book Here

Book Description


Charleston Harbor Deepening Project, Charleston Harbor and Shipyard River

Charleston Harbor Deepening Project, Charleston Harbor and Shipyard River PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 308

Get Book Here

Book Description


Deepening and Extending Channels for Navigation. Charleston Harbor, South Carolina

Deepening and Extending Channels for Navigation. Charleston Harbor, South Carolina PDF Author: CORPS OF ENGINEERS CHARLESTON SC CHARLESTON DISTRICT.
Publisher:
ISBN:
Category :
Languages : en
Pages : 143

Get Book Here

Book Description
This report recommends deepening the existing Charleston and Shipyard River Project, to 40 and 38 feet respectively. Some additional basin and channel widening is also recommended. Ocean disposal was the most viable means of disposing of the dredged material. (Author).

Charleston Harbor, South Carolina

Charleston Harbor, South Carolina PDF Author: United States. Army. Corps of Engineers
Publisher:
ISBN:
Category : Harbors
Languages : en
Pages : 432

Get Book Here

Book Description


Folly River Navigation Study, Charleston County, South Carolina

Folly River Navigation Study, Charleston County, South Carolina PDF Author: United States. Army. Corps of Engineers
Publisher:
ISBN:
Category : Dredging
Languages : en
Pages : 368

Get Book Here

Book Description


Charleston Harbor Deepening Project. Charleston Harbor and Shipyard River, South Carolina

Charleston Harbor Deepening Project. Charleston Harbor and Shipyard River, South Carolina PDF Author: CORPS OF ENGINEERS CHARLESTON SC CHARLESTON DISTRICT.
Publisher:
ISBN:
Category :
Languages : en
Pages : 238

Get Book Here

Book Description
The purpose of this project is to provide safe navigation for existing and prospective large vessel traffic by deepening existing channels providing new and enlarged turning basins, and providing minor alignment changes and easing of bends. The proposed plan of improvement for Charleston Harbor consists of the following: (a) Deepening the existing entrance channel from a depth of 35 feet to a depth of 42 feet; (b) Deepening the existing entrance channel from a depth of 35 feet to a depth of 40 feet from the Entrance Channel (Mile 0.6) to Mile 15.7 at Goose Creek; (c) Deepening the Shipyard River channel from 30 feet to 38 feet; (d) Enlargement of the anchorage basin at the harbor mouth; (e) Enlargement of the existing turning basin at the head of the commercial channel; (f) Dredging a new turning basin adjacent to the Columbus Street docks; (g) Widening North Charleston and Filbin reaches to 500 feet; (h) Shifting of channels near the various terminals to provide 125 feet between existing piers and the edge of the channel.

Savannah Harbor Navigation Project, Long Term Management Strategy (LTMS) Study, Chatham County [GA], Jasper County [SC]

Savannah Harbor Navigation Project, Long Term Management Strategy (LTMS) Study, Chatham County [GA], Jasper County [SC] PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 1046

Get Book Here

Book Description