Airport Electrification Project

Airport Electrification Project PDF Author: Joseph Permatteo
Publisher:
ISBN:
Category : Airports
Languages : en
Pages :

Get Book Here

Book Description

Airport Electrification Project

Airport Electrification Project PDF Author: Joseph Permatteo
Publisher:
ISBN:
Category : Airports
Languages : en
Pages :

Get Book Here

Book Description


Airport Electrification Project

Airport Electrification Project PDF Author: M. W. Goldsmith
Publisher:
ISBN:
Category : Air
Languages : en
Pages :

Get Book Here

Book Description


Developing a Business Case for Renewable Energy at Airports

Developing a Business Case for Renewable Energy at Airports PDF Author: Stephen B. Barrett
Publisher:
ISBN:
Category : Airports
Languages : en
Pages : 174

Get Book Here

Book Description
This report is a guidebook to help airports understand renewable energy opportunities. The report includes instructions and tools to evaluate proposed renewable energy projects and their alternatives so that an informed decision that maximizes financial, self-sustainability, environmental, and social benefits can be reached. The report lays out what a business case is, why renewable energy is important, and what a business case for renewable energy looks like. It describes the importance of identifying the project objective and understanding how renewable energy might fit into an airport’s vision. A decision-making matrix is included that contains criteria used to evaluate a renewable energy project with a system for weighting each factor based on an airport’s particular objectives. The report presents a business case in the context of an airport’s typical master planning and capital improvement planning processes including engagement of key stakeholders. The report provides a model business case that evaluates a solar photovoltaic facility, a fossil fuel generator, and a fuel cell as options for providing on-site electricity generation to improve an airport’s energy stability and resiliency. It also includes examples of renewable energy business cases from both aviation and non-aviation organizations to highlight lessons learned. A sample request for proposals and a sample power purchase agreement are provided for project implementation. A CD-ROM (CRP-CD-177) provides supplemental information.

Airport Electrification

Airport Electrification PDF Author: General Electric Company (London)
Publisher:
ISBN:
Category :
Languages : en
Pages : 48

Get Book Here

Book Description


Northeast Corridor Improvement Project, Electrification, New Haven to Boston [CT,MA]

Northeast Corridor Improvement Project, Electrification, New Haven to Boston [CT,MA] PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 826

Get Book Here

Book Description


Guidebook for Incorporating Sustainability Into Traditional Airport Projects

Guidebook for Incorporating Sustainability Into Traditional Airport Projects PDF Author: Landrum & Brown
Publisher: Transportation Research Board
ISBN: 0309258618
Category : Architecture
Languages : en
Pages : 102

Get Book Here

Book Description
At head of title: Airport Cooperative Research Program.

Optimization and Electrification of Airport Shuttle Bus Fleets

Optimization and Electrification of Airport Shuttle Bus Fleets PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 0

Get Book Here

Book Description
Interim results from the Athena project show that Dallas-Fort Worth International Airport could achieve up to 50% energy savings with targeted shuttle bus electrification.

Energy Conservation for Airport Buildings

Energy Conservation for Airport Buildings PDF Author: United States. Federal Aviation Administration
Publisher:
ISBN:
Category : Airport buildings
Languages : en
Pages : 48

Get Book Here

Book Description


Guidebook for Energy Facilities Compatibility with Airports and Airspace

Guidebook for Energy Facilities Compatibility with Airports and Airspace PDF Author: Stephen B. Barrett
Publisher:
ISBN:
Category : Aeronautics
Languages : en
Pages : 100

Get Book Here

Book Description
"The objective of this research is to produce a guidebook, supported by empirical evidence, that provides best practices for aviation safety associated with planning, developing and constructing energy production and transmission technologies at and around airports. " - Objective, Project information.

Optimizing the Use of Electric Preconditioned Air (PCA) and Ground Power Systems at Airports

Optimizing the Use of Electric Preconditioned Air (PCA) and Ground Power Systems at Airports PDF Author: Katherine B. Preston
Publisher:
ISBN: 9780309480772
Category : Airports
Languages : en
Pages : 136

Get Book Here

Book Description
As demand for air travel grows, airport-related emissions are increasing and airports are challenged to reduce associated environmental impacts. In response, expanded regulatory programs and global climate protection initiatives are being developed that require the aviation industry--including U.S. airports--to implement new, clean technologies and to modify operational practices to reduce emissions. One effective option for reducing the emissions associated with aircraft auxiliary power units (APUs) and diesel-powered gate equipment is to convert to electric PCA and electric ground power systems, collectively referred to as "gate electrification systems." The TRB Airport Cooperative Research Program's ACRP Research Report 207: Optimizing the Use of Electric Preconditioned Air (PCA) and Ground Power Systems for Airports provides guidance in identifying and understanding factors that contribute to the use or non-use of gate electrification systems (electric preconditioned air or PCA and electric ground power systems) and ways that airports and airlines can optimize the use of the systems. This research includes case studies at a variety of types and sizes of airports in different climates; an evaluation of how weather and climate impact utilization; the use and impact of other available ground power and PCA units; consideration of aircraft hardstand operations; and airport and airline practices for optimal equipment utilization. The work includes additional resources: the ACRP 02-76 Ground Power and PCA Example Utilization Tracking Methodology and the Self-Assessment Checklist.