Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 170
Book Description
The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).
Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 170
Book Description
The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).
Publisher:
ISBN:
Category :
Languages : en
Pages : 170
Book Description
The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).
Southern California Edison's Eldorado-Ivanpah Transmission Line Project
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 840
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 840
Book Description
Rycevile-Lexington Park 230 KV Transmission Line
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 172
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 172
Book Description
Schultz-Hanford Area Transmission Line Project
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 612
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 612
Book Description
Final Environmental Impact Statement, Cordova-Union-Browns Ferry 500-kV Transmission Line [and] Union, Mississippi 500-kV Substation and Transmission Line Connections
Author: Tennessee Valley Authority
Publisher:
ISBN:
Category : Electric lines
Languages : en
Pages : 266
Book Description
Assessment of environmental impact of the construction of substation near Tupelo, Miss. and 200-mile transmission line from Tenn. to Ala.
Publisher:
ISBN:
Category : Electric lines
Languages : en
Pages : 266
Book Description
Assessment of environmental impact of the construction of substation near Tupelo, Miss. and 200-mile transmission line from Tenn. to Ala.
Environmental Impact Statement on the Proposed 161-kV Transmission Line from Crystal Cave, Pierce County, to Apple River, Polk County
Author: Public Service Commission of Wisconsin. Bureau of Environmental and Energy Systems
Publisher:
ISBN:
Category : Electric power distribution
Languages : en
Pages : 168
Book Description
Publisher:
ISBN:
Category : Electric power distribution
Languages : en
Pages : 168
Book Description