Stocking of Offsite Waters for Hungry Horse Dam Mitigation; Creston National Fish Hatchery, 2002-2003 Annual Report

Stocking of Offsite Waters for Hungry Horse Dam Mitigation; Creston National Fish Hatchery, 2002-2003 Annual Report PDF Author: US Fish and Wildlife Service Staff
Publisher:
ISBN:
Category :
Languages : en
Pages : 5

Get Book Here

Book Description
Mitigation Objective 1: Produce Native Westslope Cutthroat Trout at Creston NFH--Task: Acquire eggs and rear up to 100,000 Westslope Cutthroat trout annually for offsite mitigation stocking. Accomplishments: A total of 141,000 westslope cutthroat eggs (M012 strain) was acquired from the State of Montana Washoe Park State Fish Hatchery in May 2002 for this objective. We also received an additional 22,000 westslope cutthroat eggs, MO12 strain naturalized, from feral fish at Rogers Lake, Flathead County, Montana. The fish were reared using approved fish culture techniques as defined in the U.S. Fish and Wildlife Service, Fish Hatchery Management guidelines. Survival from the swim up fry stage to stocking was 95.6%. We achieved a 0.80 feed conversion this year on a new diet, Skretting ''Nutra Plus''. Post release survival and angler success is monitored annually by Montana Fish Wildlife and Parks (MFWP) and the Confederated Salish and Kootenai Tribe (CSKT). Stocking numbers and locations vary yearly based on results of biological monitoring and adaptive management. Mitigation Objective 2: Produce Rainbow Trout at Creston NFH--Task: Acquire and rear up to 100,000 Rainbow trout annually for offsite mitigation in closed basin waters. Accomplishments: A total of 54,000 rainbow trout eggs (Arlee strain) was acquired from the Ennis National Fish Hatchery in December 2002 for this objective. The fish were reared using approved fish culture techniques as defined in the U.S. Fish and Wildlife Service, Fish Hatchery Management guidelines. Survival from the swim up fry stage to stocking was 99.9%. We achieved a 0.79 feed conversion this year on a new diet, Skretting ''Nutra Plus''. Arlee rainbow trout are being used for this objective because the stocking locations are terminal basin reservoirs and habitat conditions and returns to the creel are unsuitable for native cutthroat. Post release survival and angler success is monitored annually by the Confederated Salish and Kootenai Tribe (CSKT). Stocking numbers and locations vary yearly based on results of biological monitoring and adaptive management.

Stocking of Offsite Waters for Hungry Horse Dam Mitigation; Creston National Fish Hatchery, 2002-2003 Annual Report

Stocking of Offsite Waters for Hungry Horse Dam Mitigation; Creston National Fish Hatchery, 2002-2003 Annual Report PDF Author: US Fish and Wildlife Service Staff
Publisher:
ISBN:
Category :
Languages : en
Pages : 5

Get Book Here

Book Description
Mitigation Objective 1: Produce Native Westslope Cutthroat Trout at Creston NFH--Task: Acquire eggs and rear up to 100,000 Westslope Cutthroat trout annually for offsite mitigation stocking. Accomplishments: A total of 141,000 westslope cutthroat eggs (M012 strain) was acquired from the State of Montana Washoe Park State Fish Hatchery in May 2002 for this objective. We also received an additional 22,000 westslope cutthroat eggs, MO12 strain naturalized, from feral fish at Rogers Lake, Flathead County, Montana. The fish were reared using approved fish culture techniques as defined in the U.S. Fish and Wildlife Service, Fish Hatchery Management guidelines. Survival from the swim up fry stage to stocking was 95.6%. We achieved a 0.80 feed conversion this year on a new diet, Skretting ''Nutra Plus''. Post release survival and angler success is monitored annually by Montana Fish Wildlife and Parks (MFWP) and the Confederated Salish and Kootenai Tribe (CSKT). Stocking numbers and locations vary yearly based on results of biological monitoring and adaptive management. Mitigation Objective 2: Produce Rainbow Trout at Creston NFH--Task: Acquire and rear up to 100,000 Rainbow trout annually for offsite mitigation in closed basin waters. Accomplishments: A total of 54,000 rainbow trout eggs (Arlee strain) was acquired from the Ennis National Fish Hatchery in December 2002 for this objective. The fish were reared using approved fish culture techniques as defined in the U.S. Fish and Wildlife Service, Fish Hatchery Management guidelines. Survival from the swim up fry stage to stocking was 99.9%. We achieved a 0.79 feed conversion this year on a new diet, Skretting ''Nutra Plus''. Arlee rainbow trout are being used for this objective because the stocking locations are terminal basin reservoirs and habitat conditions and returns to the creel are unsuitable for native cutthroat. Post release survival and angler success is monitored annually by the Confederated Salish and Kootenai Tribe (CSKT). Stocking numbers and locations vary yearly based on results of biological monitoring and adaptive management.

Stocking of Offsite Waters for Hungry Horse Dam Mitigation

Stocking of Offsite Waters for Hungry Horse Dam Mitigation PDF Author: Creston National Fish Hatchery
Publisher:
ISBN:
Category : Fish stocking
Languages : en
Pages : 2

Get Book Here

Book Description


Stocking of Offsite Waters for Hungry Horse Dam Mitigation; Creston National Fish Hatchery, 2001-2002 Annual Report

Stocking of Offsite Waters for Hungry Horse Dam Mitigation; Creston National Fish Hatchery, 2001-2002 Annual Report PDF Author: Mark Maskill
Publisher:
ISBN:
Category :
Languages : en
Pages : 5

Get Book Here

Book Description
Mitigation Objective 1: Produce Native Westslope Cutthroat Trout at Creston NFH--Task: Acquire eggs and rear up to 100,000 Westslope Cutthroat trout annually for offsite mitigation stocking. Accomplishments: A total of 150,000 westslope cutthroat eggs (M012 strain) were acquired from the State of Montana Washoe Park State Fish Hatchery in July 2001 for this objective. Another 120,000 westslope cutthroat eggs were taken from feral fish at Rogers Lake in May of 2001 by the Creston Hatchery crew. The fish were reared using approved fish culture techniques as defined in the U.S. Department of the Interior Fish Hatchery Management guidelines. Post release survival and angler success is monitored annually by Montana Fish Wildlife and Parks (MFWP) and the Confederated Salish and Kootenai Tribe (CSKT). Stocking numbers and locations may vary yearly based on results of biological monitoring. Mitigation Objective 2: Produce Rainbow Trout at Creston NFH--Task: Acquire and rear up to 100,000 Rainbow trout annually for offsite mitigation in closed basin waters. Accomplishments: A total of 50,500 rainbow trout eggs (Arlee strain) were acquired from the State of Montana Arlee State Fish Hatchery in December 2001 for this objective. The fish were reared using approved fish culture techniques as defined in the U.S. Department of the Interior Fish Hatchery Management guidelines. Arlee rainbow trout are being used for this objective because the stocking locations are terminal basin reservoirs and habitat conditions and returns to creel are unsuitable for native cutthroat. Post release survival and angler success is monitored annually by the Confederated Salish and Kootenai Tribe (CSKT). Stocking numbers and locations may vary yearly based on results of biological monitoring.

Stocking of Offsite Waters for Hungry Horse Dam Mitigation Creston National Fish Hatchery, FY 2006 Annual Report

Stocking of Offsite Waters for Hungry Horse Dam Mitigation Creston National Fish Hatchery, FY 2006 Annual Report PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 4

Get Book Here

Book Description
A total of 350,000, M012 strain, westslope cutthroat trout (WCT) eggs were received from Montana Fish Wildlife & Parks (MFWP), Washoe Park State Fish Hatchery in June of 2005 to accomplish this fishery management objective. These eggs were incubated, hatched and reared entirely inside the hatchery nursery building using a protected well water supply. Fish grew according to schedule and survival was excellent. The hatchery achieved a 0.78 feed fed to pounds gained conversion ratio for this group of WCT. Not all of the progenies from this fish lot were used for Hungry Horse Dam Fishery Mitigation Implementation. Some were used for other regional fishery management projects. Westslope cutthroat trout were reared using approved fish culture techniques as recommended in the USFWS Fish Hatchery Management Handbook and also utilizing a regimen adapted for hatchery specific site conditions. The fish health for these WCT was very good. Survival from first feeding fry stage to stocking was 79%. The hatchery had an annual fish health inspection performed by the USFWS Bozeman Fish Health Center in mid March of 2006. This inspection found all fish lots at Creston to be disease free. The Montana State Fish Health Board has placed the hatchery under a limited quarantine since May of 2005 due to an epizootic of Furunculosis. This classification has allowed the Creston NFH to stock disease free fish in locations approved by regional fish managers. The hatchery has been working with the State Fish Pathologist to remove the limited quarantine classification from the facility. Although fish health for all station fish lots remains disease free, MFWP has asserted it will not remove the limited quarantine until the new influent water treatment system, including the ultraviolet disinfection unit, is running full time, year round. The USFWS is working to secure the additional funding necessary to operate the treatment building year round. Distribution of the WCT took place from March through June. The stocking locations on the Flathead Reservation and State managed waters were identified by Confederated Salish and Kootenai Tribe (CSKT) and MFWP fishery biologists. Post release survival and angler success is monitored routinely by CSKT and MFWP fishery technicians. Stocking numbers and locations vary annually based on the results of biological monitoring, creel evaluations and adaptive management decisions. A total of 99,126 WCT were stocked during nine distribution trips in management approved waters (see Table 1). The average size of WCT at stocking was 3.91-inches. A total of 101,600, Arlee strain, rainbow trout (RBT) eggs were received from the Ennis National Fish Hatchery, Ennis, Montana, in December of 2005 and 35,000 Kamloops strain eggs were received from Murray Springs SFH, Eureka, Montana, in March of 2006 to accomplish this fishery management objective. The RBT were reared using approved fish culture techniques as recommended in the USFWS Fish Hatchery Management Handbook. There was no fish health related problems associated with this lot of fish. Survival from swim up fry stage to stocking was 93% for the Arlee's and 79% for the Kamloops. The hatchery achieved a 0.68 feed fed to pounds gained conversion ratio for the Arlee and 0.97 for the Kamloops RBT. The excellent feed conversion ratio can be attributed to refined feeding techniques and the use of an extruded high performance fry feed made with premium fish meal and marine fish oil. The Arlee strain of rainbow trout is requested for this fishery mitigation objective because the chosen stocking locations are terminal basin reservoirs or lakes, habitat conditions prevent natural spawning runs and returns to the creel are more favorable then for native westslope cutthroat trout. MFWP also requested a fall plant of Kamloops strain RBT and they will be evaluated for performance and future fall stockings in Echo Lake. Post release survival and angler success is monitored routinely by the Confederated Salish and Kootenai Tribe (CSKT) and Montana Fish Wildlife & Parks (MFWP) fishery technicians. Stocking numbers and locations vary annually based on the results of biological monitoring, creel evaluations and habitat conditions. The RBT were stocked in six distribution trips from June through September. The number of fish stocked and the receiving waters are identified below (see Table 2).

Hungry Horse Dam Fisheries Mitigation

Hungry Horse Dam Fisheries Mitigation PDF Author:
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 36

Get Book Here

Book Description


Hungry Horse Mitigation, Creston National Fish Hatchery

Hungry Horse Mitigation, Creston National Fish Hatchery PDF Author:
Publisher:
ISBN:
Category : Fish hatcheries
Languages : en
Pages : 26

Get Book Here

Book Description


Hungry Horse Mitigation ; Flathead Lake, 2003-2004 Annual Report

Hungry Horse Mitigation ; Flathead Lake, 2003-2004 Annual Report PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 12

Get Book Here

Book Description
The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by the Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Objective 1 in the workplan is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of Objectives 2-8.

Brieven van Jacob Wijbrand Muller (1858-1945) aan Cornelis van Vollenhoven (1874-1933)

Brieven van Jacob Wijbrand Muller (1858-1945) aan Cornelis van Vollenhoven (1874-1933) PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


Hungry Horse Mitigation ; Flathead Lake, 2001-2002 Annual Report

Hungry Horse Mitigation ; Flathead Lake, 2001-2002 Annual Report PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 20

Get Book Here

Book Description
The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by the Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the interconnected Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of potential mitigation strategies. Only Objective 1 in the workplan is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of Objectives 2-6.

Hungry Horse Dam Fisheries Mitigation: Kokanee Stocking and Monitoring in Flathead Lake. Progress Report, January 1, 1996--December 31, 1996

Hungry Horse Dam Fisheries Mitigation: Kokanee Stocking and Monitoring in Flathead Lake. Progress Report, January 1, 1996--December 31, 1996 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
Kokanee salmon Oncorhynchus nerka were introduced into Flathead Lake in 1916. The kokanee population declined in the 1960s and 1970s, and kokanee disappeared from Flathead Lake in the late 1980s. Their disappearance has been attributed to the long-term effects of the construction and operation of Hungry Horse and Kerr dams, excessive harvest by anglers, and changes in the lake food web induced by the introduction of opossum shrimp Mysis relicta. Attempts to reestablish kokanee in the Flathead Lake ecosystem between 1988 and 1991 were unsuccessful. In 1991, Montana Fish, Wildlife and Parks (MFWP) and the Confederated Salish and Kootenai Tribes (CSKT) wrote a mitigation plan to restore kokanee to Flathead Lake. In 1993, MFWP, CSKT, and the U.S. Fish and Wildlife Service wrote a mitigation implementation plan that initiated a 5-year test program to use hatchery-reared fish to reintroduce kokanee to the lake. Stocking hatchery-reared kokanee into Flathead Lake began in 1993; the 5-year [open-quotes]kokanee test[close-quotes] started in 1994 and is scheduled to continue through 1998. The annual stocking objective is 1 million yearling kokanee (6-8 in long). Criteria used to evaluate the success of the 5-year test are (1) 30% survival of kokanee 1 year after stocking, (2) yearling-to-adult survival of 10%, and (3) annual harvest of 50,000 kokanee ([ge] 11 in) and fishing effort [ge] 100,000 angler hours.