Trinity River Project, Texas ; Status Report of Environmental Evaluations

Trinity River Project, Texas ; Status Report of Environmental Evaluations PDF Author:
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages : 184

Get Book Here

Book Description

Trinity River Project, Texas ; Status Report of Environmental Evaluations

Trinity River Project, Texas ; Status Report of Environmental Evaluations PDF Author:
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages : 184

Get Book Here

Book Description


Status Report of Environmental Evaluations Trinity River Project, Texas. Main Text

Status Report of Environmental Evaluations Trinity River Project, Texas. Main Text PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 404

Get Book Here

Book Description
This report includes: (1) Authorized Project Plan that provides for flood control, recreation, water supply, navigation, fish and wildlife programs, hydroelectric power and the Multiple-purpose Channel; (2) National Economic Development Plan that is similar to the Authorized Project Plan, but has many features that delete adverse effects to natural resources to reduce cost; (3) Environmental Quality Plan that is a nonstructural multiple-purpose plan of no action in regard to navigation and hydroelectric power for the Corps of Engineers. It proposes land use regulations for the entire Trinity River flood plain and proposes water conservation in lieu of added development for increasing the water supply; (4) No Action Plan; (5) Authorized Project Plan Without Navigation that includes flood control, reservoir regulation channel, strengthen existing agricultural levees, and enlarge Tennessee Colony Lake. This plan reduces some of the adverse effects on natural resources; (6) Authorized Project Plan Without Navigation, Provisions for Future Navigation. This is the same as the previous plan except providing for navigation in the initial stages of design and construction; and (7) Authorized Project Plan, Navigation Terminated Downstream from Dallas. Similar to Authorized Project Plan except for the flood control channel. Tax and bond issues were rejected by voters. Congress directed Corps of Engineers to cease further planning for fiscal year 1974 and 1975.

Status Report of Environmental Evaluations, Trinity River Project, Texas. Appendix A. Plates and Photographs

Status Report of Environmental Evaluations, Trinity River Project, Texas. Appendix A. Plates and Photographs PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 148

Get Book Here

Book Description
Three volume status report of environmental evaluation of Trinity River Project. This includes: (1) Authorized Project Plan that provides for flood control, recreation, water supply, navigation fish and wildlife program, hydroelectric power and the Multiple-purpose Channel; (2) National Economic Development Plan that is similar to the Authorized Project Plan, but has many features that delete adverse effects to natural resources to reduce cost; (3) Environmental Quality Plan that is a nonstructural multiple-purpose plan of no action in regard to navigation and hydroelectric power for the Corps of Engineers. It proposes land use regulations for the entire Trinity River flood plain and proposes water conservation in lieu of added development for increasing the water supply; (4) No Action Plan; (5) Authorized Project Plan Without Navigation that includes flood control, reservoir regulation channel, strengthen existing agricultural levees, and enlarge Tennessee Colony Lake. This plan reduces some of the adverse effects on natural resources; (6) Authorized Project Plan Without Navigation, Provisions for Future Navigation. This is the same as the previous plan except providing for navigation in the initial stages of design and construction; and (7) Authorized Project Plan, Navigation Terminated Downstream from Dallas. Similar to Authorized Project Plan except for the flood control channel. Tax and bond issues were rejected by voters. Congress directed Corps of Engineers to cease further planning for fiscal year 1974 and 1975.

Status Report of Environmental Evaluations Trinity River Project Texas. Appendix B. Biological Inventory with Effect Evaluation

Status Report of Environmental Evaluations Trinity River Project Texas. Appendix B. Biological Inventory with Effect Evaluation PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 537

Get Book Here

Book Description
Three volume status report of environmental evaluation of Trinity River Project. This includes: (1) supply, navigation, fish and wildlife programs, hydroelectric power and the Multiple-purpose Channel; (2) National Economic Development Plan that is similar to the Authorized Project Plan, but has many features that delete adverse effects to natural resources to reduce cost; (3) Environmental Quality Plan that is nonstructural multiple-purpose plan of no action in regard to navigation and hydroelectric power for the Corps of Engineers. It proposes land use regulations for the entire Trinity River flood plain and proposes water conservation in lieu of added development for increasing the water supply; (4) NO Action Plan; (5) Authorized Project Plan Without Navigation that includes flood control, reservoir regulation channel, strengthen existing agricultural levees, and enlarge Tennessee Colony Lake. This plan reduces some of the adverse effects on natural resources; (6) Authorized Project Plan Without Navigation, Provisions for Future Navigation. This is the same as the previous plan except providing for navigation in the initial stages of design and construction; and (7) Authorized Project Plan, Navigation Terminated Downstream from Dallas. Similar to Authorized Project Plan except for the flood control channel. Tax and bond issues were rejected by voters. Congress directed Corps of Engineers to cease further planning for fiscal year 1974 and 1975.

Status Report of Environmental Evaluations

Status Report of Environmental Evaluations PDF Author: Trinity River Project, Tex
Publisher:
ISBN:
Category : Trinity River (Tex.)
Languages : en
Pages :

Get Book Here

Book Description


Wallisville Lake Post Authorization Change Report

Wallisville Lake Post Authorization Change Report PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 858

Get Book Here

Book Description


Main text

Main text PDF Author: Trinity River Project, Tex
Publisher:
ISBN:
Category : Trinity River (Tex.)
Languages : en
Pages :

Get Book Here

Book Description


Technical Abstract Bulletin

Technical Abstract Bulletin PDF Author:
Publisher:
ISBN:
Category : Science
Languages : en
Pages : 232

Get Book Here

Book Description


An Annotated Bibliography of the Fish and Wildlife Resources of Galveston Bay, Texas: Annotated bibliography, author index, and taxonomic index

An Annotated Bibliography of the Fish and Wildlife Resources of Galveston Bay, Texas: Annotated bibliography, author index, and taxonomic index PDF Author: Steven P. Christman
Publisher:
ISBN:
Category : Galveston Bay (Tex.)
Languages : en
Pages : 660

Get Book Here

Book Description


Public Works for Water and Power Development and Energy Research Appropriation Bill, 1977

Public Works for Water and Power Development and Energy Research Appropriation Bill, 1977 PDF Author: United States. Congress. House. Committee on Appropriations. Subcommittee on Public Works
Publisher:
ISBN:
Category : Power resources
Languages : en
Pages : 1512

Get Book Here

Book Description