Author: Klaus Neumann
Publisher: Springer Science & Business Media
ISBN: 3642615155
Category : Mathematics
Languages : en
Pages : 250
Book Description
Project planning, scheduling, and control are regularly used in business and the service sector of an economy to accomplish outcomes with limited resources under critical time constraints. To aid in solving these problems, network-based planning methods have been developed that now exist in a wide variety of forms, cf. Elmaghraby (1977) and Moder et al. (1983). The so-called "classical" project networks, which are used in the network techniques CPM and PERT and which represent acyclic weighted directed graphs, are able to describe only projects whose evolution in time is uniquely specified in advance. Here every event of the project is realized exactly once during a single project execution and it is not possible to return to activities previously carried out (that is, no feedback is permitted). Many practical projects, however, do not meet those conditions. Consider, for example, a production process where some parts produced by a machine may be poorly manufactured. If an inspection shows that a part does not conform to certain specifications, it must be repaired or replaced by a new item. This means that we have to return to a preceding stage of the production process. In other words, there is feedback. Note that the result of the inspection is that a certain percentage of the parts tested do not conform. That is, there is a positive probability (strictly less than 1) that any part is defective.
Stochastic Project Networks
Author: Klaus Neumann
Publisher: Springer Science & Business Media
ISBN: 3642615155
Category : Mathematics
Languages : en
Pages : 250
Book Description
Project planning, scheduling, and control are regularly used in business and the service sector of an economy to accomplish outcomes with limited resources under critical time constraints. To aid in solving these problems, network-based planning methods have been developed that now exist in a wide variety of forms, cf. Elmaghraby (1977) and Moder et al. (1983). The so-called "classical" project networks, which are used in the network techniques CPM and PERT and which represent acyclic weighted directed graphs, are able to describe only projects whose evolution in time is uniquely specified in advance. Here every event of the project is realized exactly once during a single project execution and it is not possible to return to activities previously carried out (that is, no feedback is permitted). Many practical projects, however, do not meet those conditions. Consider, for example, a production process where some parts produced by a machine may be poorly manufactured. If an inspection shows that a part does not conform to certain specifications, it must be repaired or replaced by a new item. This means that we have to return to a preceding stage of the production process. In other words, there is feedback. Note that the result of the inspection is that a certain percentage of the parts tested do not conform. That is, there is a positive probability (strictly less than 1) that any part is defective.
Publisher: Springer Science & Business Media
ISBN: 3642615155
Category : Mathematics
Languages : en
Pages : 250
Book Description
Project planning, scheduling, and control are regularly used in business and the service sector of an economy to accomplish outcomes with limited resources under critical time constraints. To aid in solving these problems, network-based planning methods have been developed that now exist in a wide variety of forms, cf. Elmaghraby (1977) and Moder et al. (1983). The so-called "classical" project networks, which are used in the network techniques CPM and PERT and which represent acyclic weighted directed graphs, are able to describe only projects whose evolution in time is uniquely specified in advance. Here every event of the project is realized exactly once during a single project execution and it is not possible to return to activities previously carried out (that is, no feedback is permitted). Many practical projects, however, do not meet those conditions. Consider, for example, a production process where some parts produced by a machine may be poorly manufactured. If an inspection shows that a part does not conform to certain specifications, it must be repaired or replaced by a new item. This means that we have to return to a preceding stage of the production process. In other words, there is feedback. Note that the result of the inspection is that a certain percentage of the parts tested do not conform. That is, there is a positive probability (strictly less than 1) that any part is defective.
Project Management with Dynamic Scheduling
Author: Mario Vanhoucke
Publisher: Springer Science & Business Media
ISBN: 3642404383
Category : Business & Economics
Languages : en
Pages : 321
Book Description
The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule’s risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project’s baseline schedule is rather limited and only acts as a point of reference in the project life cycle. Consequently, a project schedule should especially be considered as nothing more than a predictive model that can be used for resource efficiency calculations, time and cost risk analyses, project tracking and performance measurement, and so on. In this book, the three dimensions of dynamic scheduling are highlighted in detail and are based on and inspired by a combination of academic research studies at Ghent University (www.ugent.be), in-company trainings at Vlerick Business School (www.vlerick.com) and consultancy projects at OR-AS (www.or-as.be). First, the construction of a project baseline schedule is a central theme throughout the various chapters of the book, and is discussed from a complexity point of view with and without the presence of project resources. Second, the creation of an awareness of the weak parts in a baseline schedule is discussed at the end of the two baseline scheduling parts as schedule risk analysis techniques that can be applied on top of the baseline schedule. Third, the baseline schedule and its risk analyses can be used as guidelines during the project control step where actual deviations can be corrected within the margins of the project’s time and cost reserves. The second edition of this book has seen corrections, additions and amendments in detail throughout the book. Moreover Chapter 15 on "Dynamic Scheduling with ProTrack" has been completely rewritten and extended with a section on "ProTrack as a research tool".
Publisher: Springer Science & Business Media
ISBN: 3642404383
Category : Business & Economics
Languages : en
Pages : 321
Book Description
The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule’s risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project’s baseline schedule is rather limited and only acts as a point of reference in the project life cycle. Consequently, a project schedule should especially be considered as nothing more than a predictive model that can be used for resource efficiency calculations, time and cost risk analyses, project tracking and performance measurement, and so on. In this book, the three dimensions of dynamic scheduling are highlighted in detail and are based on and inspired by a combination of academic research studies at Ghent University (www.ugent.be), in-company trainings at Vlerick Business School (www.vlerick.com) and consultancy projects at OR-AS (www.or-as.be). First, the construction of a project baseline schedule is a central theme throughout the various chapters of the book, and is discussed from a complexity point of view with and without the presence of project resources. Second, the creation of an awareness of the weak parts in a baseline schedule is discussed at the end of the two baseline scheduling parts as schedule risk analysis techniques that can be applied on top of the baseline schedule. Third, the baseline schedule and its risk analyses can be used as guidelines during the project control step where actual deviations can be corrected within the margins of the project’s time and cost reserves. The second edition of this book has seen corrections, additions and amendments in detail throughout the book. Moreover Chapter 15 on "Dynamic Scheduling with ProTrack" has been completely rewritten and extended with a section on "ProTrack as a research tool".
Project Management, Planning and Control
Author: Albert Lester
Publisher: Butterworth-Heinemann
ISBN: 9780750669566
Category : Business & Economics
Languages : en
Pages : 460
Book Description
This fifth edition provides a comprehensive resource for project managers. It describes the latest project management systems that use critical path methods.
Publisher: Butterworth-Heinemann
ISBN: 9780750669566
Category : Business & Economics
Languages : en
Pages : 460
Book Description
This fifth edition provides a comprehensive resource for project managers. It describes the latest project management systems that use critical path methods.
Project Scheduling and Cost Control
Author: James Taylor
Publisher: J. Ross Publishing
ISBN: 9781932159110
Category : Business & Economics
Languages : en
Pages : 316
Book Description
More than 80 percent of all projects start with underestimated schedules and costs, and are doomed to exceed projections. This concise book demonstrates how to establish realistic estimates, how to control a projects schedule and costs, and how to develop the projects plan and processes for successful project completion.
Publisher: J. Ross Publishing
ISBN: 9781932159110
Category : Business & Economics
Languages : en
Pages : 316
Book Description
More than 80 percent of all projects start with underestimated schedules and costs, and are doomed to exceed projections. This concise book demonstrates how to establish realistic estimates, how to control a projects schedule and costs, and how to develop the projects plan and processes for successful project completion.
Resource-Constrained Project Scheduling
Author: Christian Artigues
Publisher: John Wiley & Sons
ISBN: 1118623703
Category : Technology & Engineering
Languages : en
Pages : 235
Book Description
This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. In the first part, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. Constraint programming and integer linear programming formulations are given. Relaxations based on these formulations and also on related scheduling problems are presented. Exact methods and heuristics are surveyed. Computational experiments, aiming at providing an empirical insight on the difficulty of the problem, are provided. The second part of the book focuses on several other variants of the RCPSP and on their solution methods. Each variant takes account of real-life characteristics which are not considered in the standard version, such as possible interruptions of activities, production and consumption of resources, cost-based approaches and uncertainty considerations. The last part presents industrial case studies where the RCPSP plays a central part. Applications are presented in various domains such as assembly shop and rolling ingots production scheduling, project management in information technology companies and instruction scheduling for VLIW processor architectures.
Publisher: John Wiley & Sons
ISBN: 1118623703
Category : Technology & Engineering
Languages : en
Pages : 235
Book Description
This title presents a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims at scheduling at minimal duration a set of activities subject to precedence constraints and limited resource availabilities. In the first part, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. Constraint programming and integer linear programming formulations are given. Relaxations based on these formulations and also on related scheduling problems are presented. Exact methods and heuristics are surveyed. Computational experiments, aiming at providing an empirical insight on the difficulty of the problem, are provided. The second part of the book focuses on several other variants of the RCPSP and on their solution methods. Each variant takes account of real-life characteristics which are not considered in the standard version, such as possible interruptions of activities, production and consumption of resources, cost-based approaches and uncertainty considerations. The last part presents industrial case studies where the RCPSP plays a central part. Applications are presented in various domains such as assembly shop and rolling ingots production scheduling, project management in information technology companies and instruction scheduling for VLIW processor architectures.
Project Scheduling
Author: Erik Leuven Demeulemeester
Publisher: Springer Science & Business Media
ISBN: 1402070519
Category : Business & Economics
Languages : en
Pages : 701
Book Description
Project management can be broadly defined as the process of managing, allocating and timing resources to achieve given objectives in an efficient and expedient manner. The objectives of the book cover three areas: classification; procedures; and problems.
Publisher: Springer Science & Business Media
ISBN: 1402070519
Category : Business & Economics
Languages : en
Pages : 701
Book Description
Project management can be broadly defined as the process of managing, allocating and timing resources to achieve given objectives in an efficient and expedient manner. The objectives of the book cover three areas: classification; procedures; and problems.
Network Scheduling Techniques for Construction Project Management
Author: M. Hajdu
Publisher: Springer Science & Business Media
ISBN: 9780792343097
Category : Business & Economics
Languages : en
Pages : 360
Book Description
Industrial, financial, commercial or any kinds of project have at least one common feature: the better organized they are, the higher the profit or the lower the cost. Project management is the principle of planning different projects and keeping them on track within time, cost and resource constraints. The need for effective project management is ever-increasing. The complexity of the environment we live in requires more sophisticated methods than it did just a couple of decades ago. Project managers might face insurmountable obstacles in their work if they do not adapt themselves to the changing circumstances. On the other hand, better knowledge of project management can result in better plans, schedules and, last but not least, more contracts and more profit. This knowledge can help individuals and firms to stay alive in this competitive market and, in the global sense, utilize the finite resources of our planet in a more efficient way.
Publisher: Springer Science & Business Media
ISBN: 9780792343097
Category : Business & Economics
Languages : en
Pages : 360
Book Description
Industrial, financial, commercial or any kinds of project have at least one common feature: the better organized they are, the higher the profit or the lower the cost. Project management is the principle of planning different projects and keeping them on track within time, cost and resource constraints. The need for effective project management is ever-increasing. The complexity of the environment we live in requires more sophisticated methods than it did just a couple of decades ago. Project managers might face insurmountable obstacles in their work if they do not adapt themselves to the changing circumstances. On the other hand, better knowledge of project management can result in better plans, schedules and, last but not least, more contracts and more profit. This knowledge can help individuals and firms to stay alive in this competitive market and, in the global sense, utilize the finite resources of our planet in a more efficient way.
Integrated Project Management Sourcebook
Author: Mario Vanhoucke
Publisher: Springer
ISBN: 3319273736
Category : Business & Economics
Languages : en
Pages : 292
Book Description
This handbook is a unique, comprehensive resource for professional project managers and students in project management courses that focuses on the integration between baseline scheduling, schedule risk analysis and project control, also known as Dynamic Scheduling or Integrated Project Management and Control. It contains a set of more than 70 articles. Each individual article focuses on one particular topic and features links to other articles in this book, where appropriate. Almost all articles are accompanied with a set of questions, the answers to which are provided at the end of the book. This book is accompanied by and is based on the Project Management Knowledge Center (www.pmknowledgecenter.com), an online learning platform for Integrated Project Management.
Publisher: Springer
ISBN: 3319273736
Category : Business & Economics
Languages : en
Pages : 292
Book Description
This handbook is a unique, comprehensive resource for professional project managers and students in project management courses that focuses on the integration between baseline scheduling, schedule risk analysis and project control, also known as Dynamic Scheduling or Integrated Project Management and Control. It contains a set of more than 70 articles. Each individual article focuses on one particular topic and features links to other articles in this book, where appropriate. Almost all articles are accompanied with a set of questions, the answers to which are provided at the end of the book. This book is accompanied by and is based on the Project Management Knowledge Center (www.pmknowledgecenter.com), an online learning platform for Integrated Project Management.
Advances in Project Scheduling
Author: R. Slowinski
Publisher: Elsevier
ISBN: 1483290727
Category : Business & Economics
Languages : en
Pages : 540
Book Description
This multi-author volume, containing contributions from international experts in the field, presents recent developments in project scheduling for both theory and practice. It is organized in three parts: I. Basic deterministic models; II. Special deterministic models; III. Stochastic models. A variety of approaches is presented dealing with multiple-category resource constraints, different mathematical models of activities, and various project performance measures in single and multiobjective formulation. Exact and heuristic algorithms are presented for both deterministic and stochastic project description.The volume will be of special interest to scientists, students, decision makers, executive managers, consultants and practitioners involved in systems management or operations research, in particular in business, engineering, and finance, but also in other areas of pure and applied sciences.
Publisher: Elsevier
ISBN: 1483290727
Category : Business & Economics
Languages : en
Pages : 540
Book Description
This multi-author volume, containing contributions from international experts in the field, presents recent developments in project scheduling for both theory and practice. It is organized in three parts: I. Basic deterministic models; II. Special deterministic models; III. Stochastic models. A variety of approaches is presented dealing with multiple-category resource constraints, different mathematical models of activities, and various project performance measures in single and multiobjective formulation. Exact and heuristic algorithms are presented for both deterministic and stochastic project description.The volume will be of special interest to scientists, students, decision makers, executive managers, consultants and practitioners involved in systems management or operations research, in particular in business, engineering, and finance, but also in other areas of pure and applied sciences.
APM Body of Knowledge
Author:
Publisher:
ISBN: 9781903494400
Category : Project management
Languages : en
Pages : 258
Book Description
The APM Body of Knowledge 6th edition provides the foundation for the successful delivery of projects, programmes and portfolios across all sectors and industries. Written by the profession for the profession it offers the key to successful project management and is an essential part of the APM Five Dimensions of Professionalism. It is a scope statement for the profession and a sourcebook for all aspiring, new and experienced project professionals offering common definitions, references and a comprehensive glossary of terms.
Publisher:
ISBN: 9781903494400
Category : Project management
Languages : en
Pages : 258
Book Description
The APM Body of Knowledge 6th edition provides the foundation for the successful delivery of projects, programmes and portfolios across all sectors and industries. Written by the profession for the profession it offers the key to successful project management and is an essential part of the APM Five Dimensions of Professionalism. It is a scope statement for the profession and a sourcebook for all aspiring, new and experienced project professionals offering common definitions, references and a comprehensive glossary of terms.