Naval Petroleum Reserve No. 3 Site Environmental Report

Naval Petroleum Reserve No. 3 Site Environmental Report PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 21

Get Book Here

Book Description
The CY1999 Site Environmental Report and Compliance Summary discusses environmental compliance activities for NPR-3 (Teapot Dome). All hazardous wastes that were stored in the hazardous waste accumulation at NPR-3 were removed in CY1999. NPR-3 maintains its status as a conditionally exempt small quantity generator. Hydrogen sulfide (H2S) flares have not operated at NPR-3 since 1996; monitoring of H2S indicates readings well below limits. All underground storage tanks were removed in 1998. Wastewater samples were in compliance with applicable standards.

Naval Petroleum Reserve No. 3 Site Environmental Report

Naval Petroleum Reserve No. 3 Site Environmental Report PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 21

Get Book Here

Book Description
The CY1999 Site Environmental Report and Compliance Summary discusses environmental compliance activities for NPR-3 (Teapot Dome). All hazardous wastes that were stored in the hazardous waste accumulation at NPR-3 were removed in CY1999. NPR-3 maintains its status as a conditionally exempt small quantity generator. Hydrogen sulfide (H2S) flares have not operated at NPR-3 since 1996; monitoring of H2S indicates readings well below limits. All underground storage tanks were removed in 1998. Wastewater samples were in compliance with applicable standards.

Final Environmental Impact Statement

Final Environmental Impact Statement PDF Author:
Publisher:
ISBN:
Category : Petroleum
Languages : en
Pages : 230

Get Book Here

Book Description


Elk Hills Naval Petroleum Reserve No.1

Elk Hills Naval Petroleum Reserve No.1 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 1048

Get Book Here

Book Description


Final Sitewide Environmental Assessment for Continued Development of Naval Petroleum Reserve No. 3 (NPR-3), Natrona County, Wyoming

Final Sitewide Environmental Assessment for Continued Development of Naval Petroleum Reserve No. 3 (NPR-3), Natrona County, Wyoming PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 110

Get Book Here

Book Description
The Secretary of Energy is required by law to explore, prospect, conserve, develop, use, and operate the Naval Petroleum and Oil Shale Reserves. The Naval Petroleum Reserves Production Act of 1976 (Public Law 94-258), requires that the Naval Petroleum Reserves be produced at their maximum efficient rate (MER), consistent with sound engineering practices, for a period of six years. To fulfill this mission, DOE is proposing continued development activities which would include the drilling of approximately 250 oil production and injection (gas, water, and steam) wells, the construction of between 25 and 30 miles of associated gas, water, and steam pipelines, the installation of several production and support facilities, and the construction of between 15 and 20 miles of access roads. These drilling and construction estimates include any necessary activities related to the operation of the Rocky Mountain Oilfield Testing Center (RMOTC). The purpose of RMOTC will be to provide facilities and necessary support to government and private industry for testing and evaluating new oilfield and environmental technologies, and to transfer these results to the petroleum industry through seminars and publications. Continued development activities either have no potential to result in adverse environmental impacts or would only result in adverse impacts that could be readily mitigated. The small amounts of disturbed surface area will be reclaimed to its original natural state when production operations terminate. The preparation of an environmental impact statement is not required, and the DOE is issuing this Finding of No Significant Impact (FONSI). 73 refs.

Draft Environmental Impact Statement

Draft Environmental Impact Statement PDF Author: United States. Department of the Navy
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages : 120

Get Book Here

Book Description


Final Sitewide Environmental Assessment for Preparation for Transfer of Ownership of Naval Petroleum Reserve No. 3 (NPR-3), Natrona County, Wyoming

Final Sitewide Environmental Assessment for Preparation for Transfer of Ownership of Naval Petroleum Reserve No. 3 (NPR-3), Natrona County, Wyoming PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 195

Get Book Here

Book Description
The Secretary of Energy is authorized to produce the Naval Petroleum Reserves No. 3 (NPR-3) at its maximum efficient rate (MER) consistent with sound engineering practices, for a period extending to April 5, 2000 subject to extension. Production at NPR-3 peaked in 1981 and has declined since until it has become a mature stripper field, with the average well yielding less than 2 barrels per day. The Department of Energy (DOE) has decided to discontinue Federal operation of NPR-3 at the end of its life as an economically viable oilfield currently estimated to be 2003. Although changes in oil and gas markets or shifts in national policy could alter the economic limit of NPR-3, it productive life will be determined largely by a small and declining reserve base. DOE is proposing certain activities over the next six years in anticipation of the possible transfer of NPR-3 out of Federal operation. These activities would include the accelerated plugging and abandoning of uneconomic wells, complete reclamation and restoration of abandoned sites including dismantling surface facilities, batteries, roads, test satellites, electrical distribution systems and associated power poles, when they are no longer needed for production, and the continued development of the Rocky Mountain Oilfield Testing Center (RMOTC). DOE has prepared this environmental assessment that analyzes the proposed plugging and abandonment of wells, field restoration and development of RMOTC. Based on the analysis in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). The preparation of an environmental impact statement is not required, and DOE is issuing this Finding of No Significant Impact (FONSI).

Environmental Survey Preliminary Report, Naval Petroleum and Oil Shale Reserves in Colorado, Utah, and Wyoming, Casper, Wyoming

Environmental Survey Preliminary Report, Naval Petroleum and Oil Shale Reserves in Colorado, Utah, and Wyoming, Casper, Wyoming PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 289

Get Book Here

Book Description
This report presents the preliminary environmental findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Naval Petroleum and Oil Shale Reserves in Colorado, Utah, and Wyoming (NPOSR-CUW) conducted June 6 through 17, 1988. NPOSR consists of the Naval Petroleum Reserve No. 3 (NPR-3) in Wyoming, the Naval Oil Shale Reserves No. 1 and 3 (NOSR-1 and NOSR-3) in Colorado and the Naval Oil Shale Reserve No. 2 (NOSR-2) in Utah. NOSR-2 was not included in the Survey because it had not been actively exploited at the time of the on-site Survey. The Survey is being conducted by an interdisciplinary team of environmental specialists, lead and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team specialists are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with NPOSR. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at NPOSR and interviews with site personnel. The Survey team has developed a Sampling and Analysis Plan to assist in further assessing specific environmental problems identified at NOSR-3 during the on-site Survey. There were no findings associated with either NPR-3 or NOSR-1 that required Survey-related sampling and Analysis. The Sampling and Analysis Plan will be executed by Idaho National Engineering Laboratory. When completed, the results will be incorporated into the Environmental Survey Summary report. The Summary Report will reflect the final determinations of the NPOSR-CUW Survey and the other DOE site-specific Surveys. 110 refs., 38 figs., 24 tabs.

Draft Environmental Impact Statement

Draft Environmental Impact Statement PDF Author: United States. Office of Naval Petroleum and Oil Shale Reserves
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages : 617

Get Book Here

Book Description


Continuing Exploration and Evaluation of Naval Petroleum Reserve No. 4

Continuing Exploration and Evaluation of Naval Petroleum Reserve No. 4 PDF Author: United States. Office of Naval Petroleum and Oil Shale Reserves
Publisher:
ISBN:
Category : Gas well drilling
Languages : en
Pages : 617

Get Book Here

Book Description


Final Environmental Impact Statement, Continuing Exploration and Evaluation of Naval Petroleum Reserve

Final Environmental Impact Statement, Continuing Exploration and Evaluation of Naval Petroleum Reserve PDF Author: United States. Office of Naval Petroleum and Oil Shale Reserves
Publisher:
ISBN:
Category : Gas well drilling
Languages : en
Pages : 829

Get Book Here

Book Description