The dam at Barnes Reservoir is an earth embankment approximately 1,200 feet long, 28 feet high with an average crest width of 15 feet. An uncontrolled stone masonry spillway is constructed integrally with the embankment and its discharges flow through a curved converging chute to the stream below the dam. The outlet works and control tower are located near the left abutment of the dam and discharges from the tower's wet well flow through a 24-inch diameter conduit beneath the dam. As a result of the visual inspection and the review of limited available data regarding this facility, the dam is considered to be in FAIR condition. To assure the long-term performance of this structure, several items of concern require attention: The apparent seepage beneath the spillway slab, a localized depression area in the crest of the dike, the extensive overgrowth of the embankments, spillway and downstream channel, and the inoperability of the upper intake gate to the control tower. The maximum outflow capacity of the spillway under a stillwater condition is equal to 1,200 CFS which represents more than 100 percent of the test flood. However, this discharge will produce a water surface level in the reservoir that has a freeboard allowance of only 1.2 feet below the top of the dam.

National Program for Inspection of Non-Federal Dams. Barnes Reservoir Dam (CT 00236), Coastal Basin, Salem-Montville, Connecticut. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Barnes Reservoir Dam (CT 00236), Coastal Basin, Salem-Montville, Connecticut. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 93

Get Book Here

Book Description
The dam at Barnes Reservoir is an earth embankment approximately 1,200 feet long, 28 feet high with an average crest width of 15 feet. An uncontrolled stone masonry spillway is constructed integrally with the embankment and its discharges flow through a curved converging chute to the stream below the dam. The outlet works and control tower are located near the left abutment of the dam and discharges from the tower's wet well flow through a 24-inch diameter conduit beneath the dam. As a result of the visual inspection and the review of limited available data regarding this facility, the dam is considered to be in FAIR condition. To assure the long-term performance of this structure, several items of concern require attention: The apparent seepage beneath the spillway slab, a localized depression area in the crest of the dike, the extensive overgrowth of the embankments, spillway and downstream channel, and the inoperability of the upper intake gate to the control tower. The maximum outflow capacity of the spillway under a stillwater condition is equal to 1,200 CFS which represents more than 100 percent of the test flood. However, this discharge will produce a water surface level in the reservoir that has a freeboard allowance of only 1.2 feet below the top of the dam.

Coastal Basin, Salem-Montville, Connecticut, Barnes Reservoir Dam Phase 1 Inspection Report, National Dam Inspection Program

Coastal Basin, Salem-Montville, Connecticut, Barnes Reservoir Dam Phase 1 Inspection Report, National Dam Inspection Program PDF Author: United States. Army. Corps of Engineers. New England Division
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 208

Get Book Here

Book Description


National Program for Inspection of Non-Federal Dams. Killingworth Reservoir Dam (CT 00401), Connecticut Coastal River Basin, Killingworth, Connecticut. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Killingworth Reservoir Dam (CT 00401), Connecticut Coastal River Basin, Killingworth, Connecticut. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 95

Get Book Here

Book Description
The 560 foot long dam is an earth embankment with a masonry and concrete corewall. The top of the dam is 10 feet wide and, at elevation 299, is roughly 29 feet above the streambed of an unnamed tributary to the Menunketesuck River. Upstream and downstream slopes are at two horizontal to one vertical and three horizontal to one vertical inclinations, respectively. A stone filter and underdrain runs along the downstream toe of the dam on both sides of the spillway. The 40 foot wide spillway may be described as a broadcrested concrete weir of trapezoidal cross-section. The concrete spillway wingwalls were extended vertically and horizontally by means of gabions when the downstream slope was flattened in 1973. The channel bottom below the concrete spillway apron is lined with gabions, as are the channel sides. There is also a 16 inch diameter low level outlet pipe and a 6 inch diameter low level outlet pipe through the dam from the concrete intake structure to the downstream channel. There is also a 16 inch diameter low level outlet pipe which runs directly from the reservoir through the intake structure and dam to the downstream channel. Based upon the visual inspection at the site and its past performance, the dam appears to be in good condition. No evidence of instability was observed in the dam or it appurtences. There are some areas of seepage requiring monitoring. Based upon our hydraulics computations, the spillway capacity is 920 cubic feet per second (cfs), which is equivalent to 36 percent of the routed Test Flood outflow.

Government Reports Announcements & Index

Government Reports Announcements & Index PDF Author:
Publisher:
ISBN:
Category : Science
Languages : en
Pages : 1028

Get Book Here

Book Description


Government reports annual index

Government reports annual index PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 1140

Get Book Here

Book Description


National Program for Inspection of Non-Federal Dams. New Britain Reservoir Dam (CT 00661), Connecticut Coastal Basin, Wolcott, Connecticut, New Britain Reservoir Dike (CT 00680), Connecticut Coastal Basin, Southington, Connecticut. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. New Britain Reservoir Dam (CT 00661), Connecticut Coastal Basin, Wolcott, Connecticut, New Britain Reservoir Dike (CT 00680), Connecticut Coastal Basin, Southington, Connecticut. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 91

Get Book Here

Book Description
The project, built in 1904, consists of an earthfill dam, a spillway and an earthfill dike. The total length of the project is 760 feet. Both earthfill structures have a concrete corewall which is founded on bedrock. The spillway, located 60 feet from the left side of the dam is a 30 foot long rubble masonry weir with a 12 to 16 inch thick concrete cover and concrete training walls. The outlet facilities are a 30 inch diameter low-level outlet and a gatehouse located on the downstream toe of the dam. The gate valve is operable. The dam is judged to be in fair condition and the dike to be in poor condition. No evidence of instability of the dam embankment or appurtenant structures was observed. There are areas requiring attention, maintenance and monitoring, such as seepage problems which may occur or may be occuring with the new water surface now to the top of the recently installed stop-planks, which is very close to or higher than the corewall. No evidence of instability of the dike embankment was observed. However, brush and trees on the crest and downstream slope could cause seepage through the embankment. The spillway capacity with the stop-planks removed is 1120 cfs or 23% of the routed test flood outflow.

National Program for Inspection of Non-Federal Dams. Spectacle Swamp Dam (CT 00476), Connecticut Coastal Basin, Wilton, Connecticut. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Spectacle Swamp Dam (CT 00476), Connecticut Coastal Basin, Wilton, Connecticut. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 104

Get Book Here

Book Description
The 250-foot-long, 21-foot-high homogeneous earthfill embankment is 12 feet wide at the top and has 3:1 upstream and downstream slopes. Riprap has been provided on the upstream slope to an elevation 2 feet above the wildlife pool surface. The principal spillway is composed of a reinforced concrete drop inlet structure and a 30-inch-diameter conduit through the dam. The crest of the drop inlet riser is at elevation 577.0 NGVD and has a total crest length of 15 feet. There is an ungated low-level outlet on the upstream wall of the riser. This 1 ft. - 10 in. by 1 ft. - 4 in. outlet has an open intake which may be closed, using stoplogs, thus diverting the flow over the weirs on the sides of the intake. The rock cut emergency spillway on the right abutment is 15 feet wide and approximately 245 feet long with a crest elevation of 578.0. The visual inspection of the dam indicated that the structure is in good condition. No indications of seepage through the dam were noted nor was seepage observed at the abutments or along the concrete spillway outlet pipe. There was no discharge from the 6-inch-diameter toe drain outlets during the inspection. The test flood outflow is approximately 1,240 cfs; and the combined capacity of the spillways, with the water surface at the top of the dam, is 1,600 cfs or 129 percent of the routed test flood outflow.

National Program for Inspection of Non-Federal Dams. Stony Brook Reservoir Dam (CT 00243), Thames River Basin, Montville, Connecticut. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Stony Brook Reservoir Dam (CT 00243), Thames River Basin, Montville, Connecticut. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 184

Get Book Here

Book Description
Stony Brook Reservoir Dam consists of two earthfill embankments with concrete core walls, separated by a 650 ft. long natural promontory. A concrete spillway, 35 ft. wide, is located in the Side Dam. The spillway discharges into a stone masonry channel about 220 ft. long. A gate house located upstream from the Main Dam houses controls for the inlet to a 24 in. dia. water supply line and a 24 in. dia. low level outlet. The dam and appurtenant works are judged to be in generally fair condition. Brush was growing on the downstream slopes of both dams and in the spillway discharge channel. The gate house is in need of repair and the condition of the outlet gate could not be verified. Seeps were found downstream of both dams and cavities were found in the slopes of both embankments. The routed test flood outflow of 5,200 cfs overtops the crest of the Main Dam by 1.3 ft. and the Side Dam by 0.6 ft. The spillway can pass 1,250 cfs or about 24 percent of the routed test flood outflow without overtopping the Main Dam.

National Program for Inspection of Non-Federal Dams. Grupes Reservoir Dam (CT 00057), Connecticut Coastal Basin, New Canaan, Connecticut. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Grupes Reservoir Dam (CT 00057), Connecticut Coastal Basin, New Canaan, Connecticut. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 124

Get Book Here

Book Description
The dam, built in 1871, is a 225 foot long stone and mortar masonry gravity dam used for water supply. There are two spillways; a main spillway section at the left end of the dam and an auxiliary spillway approximately 40 feet upstream from the right end of the dam. The two outlets are 24 inch and 16 inch cast iron pipes. The 24 inch pipe is located at the left end of the dam and serves as a low-level outlet or a supply line. The 16 inch pipe is located at the right end of the dam and is used as an emergency supply line. Based upon the visual inspection at the site and past performance, the dam is judged to be in fair condition. The masonry of the dam and training walls appears to be in fair condition. There are areas requiring maintenance and monitoring such as cracks in the mortar joints of the masonry in the dam and spillway walls and seepage at the right end and central portion of the dam. The spillway capacity with the reservoir level to the top of the dam is 2900 cfs, which is equivalent to 18% of the PMF outflow. The spillway capacity does not include flow over the low area in the service road.

National Program for Inspection of Non-Federal Dams. Samuel P. Senior Reservoir Dam (CT 00108), and Popps Mountain Dike (CT 00022), Connecticut Western Coastal Area, Weston, Connecticut. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Samuel P. Senior Reservoir Dam (CT 00108), and Popps Mountain Dike (CT 00022), Connecticut Western Coastal Area, Weston, Connecticut. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 78

Get Book Here

Book Description
Samuel P. Senior Dam is a linear concrete gravity structure, 990 feet long, with a 300-foot spillway located at the west end of the dam. The spillway is concaved looking downstream and consists of several steps on the downstream side. Approximately 2,000 feet northeast of the dam, a concrete gravity dike 670 feet long is provided. Based on the visual inspection of the site, review of available information and past performance of the dam, the dam is judged to be in good condition. There are surface patches of spalled concrete; however, no structural cracks were observed, nor was any visible evidence of abnormal settlements, heaving, deflections or lateral movements noted. The downstream berm is generally in good condition with no sloughing or wet spots noted. Based on the visual inspection of the site, review of available information and past performance of the dike, the dike is also judged to be in good condition. There are surface patches of spalled concrete; however, no structural cracks were observed, nor was any visible evidence of abnormal settlements, heaving, deflections or lateral movements noted. The maximum spillway capacity at top of dam is 35 percent of the peak discharge rate of the test flood. Therefore, the test flood cannot be passed by the spillway without overtopping the dam. The overflow will be 2.7 feet above the top of the dam.