Inactive Uranium Mill Tailings, Maybell Site, Engineering Assessment Summary

Inactive Uranium Mill Tailings, Maybell Site, Engineering Assessment Summary PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 76

Get Book Here

Book Description


Engineering Assessment of Inactive Uranium Mill Tailings, Maybell Site, Maybell, Colorado. Summary of the Phase II

Engineering Assessment of Inactive Uranium Mill Tailings, Maybell Site, Maybell, Colorado. Summary of the Phase II PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
Ford, Bacon and Davis Utah Inc. has performed an engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Maybell, Colorado. The Phase II-Title I services include the preparation of topographic maps, the performance of core drillings sufficient to determine areas and volumes of tailings and radiometric measurements to determine radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology and the evaluation and costing of alternative corrective actions. Radon gas release from the 2.6 million tons of tailings at the Maybell site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation are also factors. The three alternative actions presented range from fencing and maintenance (Option I), to placing the tailings in an open-pit mine and adding 2 ft of stabilization cover material (Option III). Cost estimates for the three options range from $250,000 to $4,520,000. Reprocessing the tailings for uranium does not appear to be economically attractive at present.

Inactive Uranium Mill Tailings, Maybell Site, Engineering Assessment Summary

Inactive Uranium Mill Tailings, Maybell Site, Engineering Assessment Summary PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 84

Get Book Here

Book Description


Inactive uranium mill tailings, Canonsburg site, engineering assessment summary, EA

Inactive uranium mill tailings, Canonsburg site, engineering assessment summary, EA PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 0

Get Book Here

Book Description


Inactive Uranium Mill Tailings, Phillips-United Nuclear Site, Ambrosia Lake: Engineering Assessment Summary B1; Corrigenda to Engineering Assessment Summary

Inactive Uranium Mill Tailings, Phillips-United Nuclear Site, Ambrosia Lake: Engineering Assessment Summary B1; Corrigenda to Engineering Assessment Summary PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 12

Get Book Here

Book Description


Inactive Uranium Mill Tailings, Naturita, Engineering Assessment Summary

Inactive Uranium Mill Tailings, Naturita, Engineering Assessment Summary PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 72

Get Book Here

Book Description


Inactive Uranium Mill Tailings, New and Old Rifle Sites, Engineering Assessment Summary

Inactive Uranium Mill Tailings, New and Old Rifle Sites, Engineering Assessment Summary PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 78

Get Book Here

Book Description


Engineering Assessment of Inactive Uranium Mill Tailings

Engineering Assessment of Inactive Uranium Mill Tailings PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
Ford, Bacon and Davis Utah Inc. has reevaluated the Maybell site in order to revise the October 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Maybell, Colorado. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 2.6 million dry tons of tailings at the Maybell site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The two alternative actions presented in this engineering assessment range from millsite decontamination with the addition of 3 m of stabilization cover material (Option I), to disposal of the tailings in a nearby open pit mine and decontamination of the tailings site (Option II). Cost estimates for the two options are about $11,700,000 for stabilization in-place and about $22,700,000 for disposal within a distance of 2 mi. Three principal alternatives for the reprocessing of the Maybell tailings were examined: (a) heap leaching; (b) treatment at an existing mill; and (c) reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovered would be about $125 and $165/lb of U/sub 3/O/sub 8/ by heap leach and conventional plant processes, respectively. The spot market price for uranium was $25/lb early in 1981. Therefore, reprocessing the tailings for uranium recovery is not economically attractive at present.

Energy Research Abstracts

Energy Research Abstracts PDF Author:
Publisher:
ISBN:
Category : Power resources
Languages : en
Pages : 782

Get Book Here

Book Description


Nuclear Facility Decommissioning and Site Remedial Actions

Nuclear Facility Decommissioning and Site Remedial Actions PDF Author:
Publisher:
ISBN:
Category : Nuclear facilities
Languages : en
Pages : 656

Get Book Here

Book Description