Author: United States. Army. Corps of Engineers
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Grays Harbor, Washington Navigation Improvement Project General Investigation Feasibility Study
Author: United States. Army. Corps of Engineers
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Grays Harbor, Washington Navigation Improvement Project General Investigation Feasibility Study
Author: United States. Army. Corps of Engineers
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Evaluation of the United States Army Corps of Engineers Interim Feasibility Report on Channel Improvements for Navigation in Grays Harbor, Washington
Author: Erik Stromberg
Publisher:
ISBN:
Category : Grays Harbor Estuary (Wash.)
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Grays Harbor Estuary (Wash.)
Languages : en
Pages :
Book Description
Grays Harbor Navigation Improvement Project, Chehalis and Hoquiam Rivers
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 546
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 546
Book Description
Grays Harbor and Chehalis River Navigation Project
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 218
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 218
Book Description
Grays Harbor, Washington, Navigation Improvement Project, Chehalis and Hoquiam Rivers
Author: United States. Army. Corps of Engineers. Seattle District
Publisher:
ISBN:
Category : Dredging
Languages : en
Pages : 336
Book Description
Publisher:
ISBN:
Category : Dredging
Languages : en
Pages : 336
Book Description
Public Works for Water and Power Development and Atomic Energy Commission Appropriation Bill, 1975
Author: United States. Congress. House. Committee on Appropriations. Subcommittee on Public Works
Publisher:
ISBN:
Category : Public works
Languages : en
Pages : 670
Book Description
Publisher:
ISBN:
Category : Public works
Languages : en
Pages : 670
Book Description
Interim Feasibility Report and Draft Environmental Impact Statement, Grays Harbor, Chehalis and Hoquiam Rivers, Washington, Channel Improvements for Navigation
Author: CORPS OF ENGINEERS SEATTLE WA SEATTLE DISTRICT.
Publisher:
ISBN:
Category :
Languages : en
Pages : 520
Book Description
The study determined the need for and feasibility of improving the safety and efficiency of deep-draft water in Grays Harbor, Washington. Features of the tentatively recommended plan include the following: (1) 24.3 miles of channel improvement form the outer bar through the harbor entrance and estuary past the city of Aberdeen and up the Chehalis River to the town of Cosmopolis (Authorized chanel depth would range from 46 feet at the outer bar and entrance to 38 feet through the estuary to Port of Grays Harbor terminals at Aberdeen and 36 feet above port terminals to Cosmopolis); (2) Replacement of the Union Pacific Railrod (UPRR) bridge at Aberdeen; (3) Construction of three turning basins (Hoquiam, Cow Point-Aberdeen, Elliott Slough above UPRR Bridge); (4) Mitigation of 4 acres of lost shallow water fish feeding habitat; (5) Mitigation through dredge modification to avoid increased juvenile and adult crab mortalities from dredging; (6) Improved aids to navigation; (7) Open-water disposal of dredged material at the harbor entrance (Point Chehalis and South Jetty sites) and in the ocean (about 3 1/2 miles from the harbor entrance).
Publisher:
ISBN:
Category :
Languages : en
Pages : 520
Book Description
The study determined the need for and feasibility of improving the safety and efficiency of deep-draft water in Grays Harbor, Washington. Features of the tentatively recommended plan include the following: (1) 24.3 miles of channel improvement form the outer bar through the harbor entrance and estuary past the city of Aberdeen and up the Chehalis River to the town of Cosmopolis (Authorized chanel depth would range from 46 feet at the outer bar and entrance to 38 feet through the estuary to Port of Grays Harbor terminals at Aberdeen and 36 feet above port terminals to Cosmopolis); (2) Replacement of the Union Pacific Railrod (UPRR) bridge at Aberdeen; (3) Construction of three turning basins (Hoquiam, Cow Point-Aberdeen, Elliott Slough above UPRR Bridge); (4) Mitigation of 4 acres of lost shallow water fish feeding habitat; (5) Mitigation through dredge modification to avoid increased juvenile and adult crab mortalities from dredging; (6) Improved aids to navigation; (7) Open-water disposal of dredged material at the harbor entrance (Point Chehalis and South Jetty sites) and in the ocean (about 3 1/2 miles from the harbor entrance).
Public Works for Water and Power Development and Atomic Energy Commission Appropriation Bill, 1975: Testimony of Members of Congress and other individuals and organizations
Author: United States. Congress. House. Committee on Appropriations. Subcommittee on Public Works
Publisher:
ISBN:
Category : Public works
Languages : en
Pages : 1648
Book Description
Publisher:
ISBN:
Category : Public works
Languages : en
Pages : 1648
Book Description
Grays Harbor Navigation Improvement Project, Chehalis and Hoquiam Rivers
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 876
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 876
Book Description