Grand Gulf Nuclear Plant 10% Ownership Interest, Middle South Energy, Inc., Environmental Assessment (EA), Finding of No Significant Impact (FONSI).

Grand Gulf Nuclear Plant 10% Ownership Interest, Middle South Energy, Inc., Environmental Assessment (EA), Finding of No Significant Impact (FONSI). PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 70

Get Book

Book Description


Grand Gulf Nuclear Station Unit 1, Deficiency Financing Assistance, Environmental Assessment (EA)-Finding of No Significant Impact (FONSI).

Grand Gulf Nuclear Station Unit 1, Deficiency Financing Assistance, Environmental Assessment (EA)-Finding of No Significant Impact (FONSI). PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 10

Get Book

Book Description


Grand Gulf Nuclear Station Units 1-2, Operation

Grand Gulf Nuclear Station Units 1-2, Operation PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 214

Get Book

Book Description


Safety Evaluation Report Related to the Operation of Grand Gulf Nuclear Station, Units 1 and 2

Safety Evaluation Report Related to the Operation of Grand Gulf Nuclear Station, Units 1 and 2 PDF Author: U.S. Nuclear Regulatory Commission. Office of Nuclear Reactor Regulation
Publisher:
ISBN:
Category : Electric power-plants
Languages : en
Pages : 524

Get Book

Book Description


Environmental Assessment and Finding of No Significant Impact: Interim Measures for the Mixed Waste Management Facility Groundwater at the Burial Ground Complex at the Savannah River Site

Environmental Assessment and Finding of No Significant Impact: Interim Measures for the Mixed Waste Management Facility Groundwater at the Burial Ground Complex at the Savannah River Site PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book

Book Description
The U.S. Department of Energy (DOE) prepared this environmental assessment (EA) to analyze the potential environmental impacts associated with the proposed interim measures for the Mixed Waste Management Facility (MW) groundwater at the Burial Ground Complex (BGC) at the Savannah River Site (SRS), located near Aiken, South Carolina. DOE proposes to install a small metal sheet pile dam to impound water around and over the BGC groundwater seepline. In addition, a drip irrigation system would be installed. Interim measures will also address the reduction of volatile organic compounds (VOCS) from ''hot-spot'' regions associated with the Southwest Plume Area (SWPA). This action is taken as an interim measure for the MWMF in cooperation with the South Carolina Department of Health and Environmental Control (SCDHEC) to reduce the amount of tritium seeping from the BGC southwest groundwater plume. The proposed action of this EA is being planned and would be implemented concurrent with a groundwater corrective action program under the Resource Conservation and Recovery Act (RCRA). On September 30, 1999, SCDHEC issued a modification to the SRS RCRA Part B permit that adds corrective action requirements for four plumes that are currently emanating from the BGC. One of those plumes is the southwest plume. The RCRA permit requires SRS to submit a corrective action plan (CAP) for the southwest plume by March 2000. The permit requires that the initial phase of the CAP prescribe a remedy that achieves a 70-percent reduction in the annual amount of tritium being released from the southwest plume area to Fourmile Branch, a nearby stream. Approval and actual implementation of the corrective measure in that CAP may take several years. As an interim measure, the actions described in this EA would manage the release of tritium from the southwest plume area until the final actions under the CAP can be implemented. This proposed action is expected to reduce the release of tritium from the southwest plume area to Fourmile Branch between 25 to 35 percent. If this proposed action is undertaken and its effectiveness is demonstrated, it may become a component of the final action in the CAP. This document was prepared in compliance with the National Environmental Policy Act (NEPA) of 1969, as amended; the requirements of the Council on Environmental Quality Regulations for Implementing NEPA (40 CFR 1500-1508); and the DOE Regulations for Implementing NEPA (10 CFR 1021). NEPA requires the assessment of environmental consequences of Federal actions that may affect the quality of the human environment. Based on the potential for impacts described herein, DOE will either publish a Finding of No Significant Impact (FONSI) or prepare an environmental impact statement (EM).

Environmental Assessment -- Test Area North Pool Stabilization Project Update

Environmental Assessment -- Test Area North Pool Stabilization Project Update PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 36

Get Book

Book Description
The purpose of this Environmental Assessment (EA) is to update the ''Test Area North Pool Stabilization Project'' EA (DOE/EA-1050) and finding of no significant impact (FONSI) issued May 6, 1996. This update analyzes the environmental and health impacts of a drying process for the Three Mile Island (TMI) nuclear reactor core debris canisters now stored underwater in a facility on the Idaho National Engineering and Environmental Laboratory (INEEL). A drying process was analyzed in the predecision versions of the EA released in 1995 but that particular process was determined to be ineffective and dropped from the EA/FONSI issued May 6, 1996. A new drying process was subsequently developed and is analyzed in Section 2.1.2 of this document. As did the 1996 EA, this update analyzes the environmental and health impacts of removing various radioactive materials from underwater storage, dewatering these materials, constructing a new interim dry storage facility, and transporting and placing the materials into the new facility. Also, as did the 1996 EA, this EA analyzes the removal, treatment and disposal of water from the pool, and placement of the facility into a safe, standby condition. The entire action would take place within the boundaries of the INEEL. The materials are currently stored underwater in the Test Area North (TAN) building 607 pool, the new interim dry storage facility would be constructed at the Idaho Chemical Processing Plant (ICPP) which is about 25 miles south of TAN.

Environmental Assessment of the Brine Pipeline Replacement for the Strategic Petroleum Reserve Bryan Mound Facility in Brazoria County, Texas

Environmental Assessment of the Brine Pipeline Replacement for the Strategic Petroleum Reserve Bryan Mound Facility in Brazoria County, Texas PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 78

Get Book

Book Description
The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0804, for the proposed replacement of a deteriorated brine disposal pipeline from the Strategic Petroleum Reserve (SPR) Bryan Mound storage facility in Brazoria County, Texas, into the Gulf of Mexico. In addition, the ocean discharge outfall would be moved shoreward by locating the brine diffuser at the end of the pipeline 3.5 miles offshore at a minimum depth of 30 feet. The action would occur in a floodplain and wetlands; therefore, a floodplain/wetlands assessment has been prepared in conjunction with this EA. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969 (42 USC. 4321, et seg.). Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and the Department is issuing this Finding of No Significant Impact (FONSI). This FONSI also includes a Floodplain Statement of Findings in accordance with 10 CFR Part 1022.

Sitewide Environmental Assessment EA-1236 for Preparation for Transfer of Ownership of Naval Petroleum Reserve No. 3 (NPR-3), Natrona County, Wyoming

Sitewide Environmental Assessment EA-1236 for Preparation for Transfer of Ownership of Naval Petroleum Reserve No. 3 (NPR-3), Natrona County, Wyoming PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 196

Get Book

Book Description
The Proposed Action includes the following principal elements: (1) The accelerated plugging and abandoning of uneconomic wells over the next six years. Uneconomic wells are operating wells which can no longer cover their direct and indirect costs. DOE estimates that there are 900 wells to be plugged and abandoned over the next six years, leaving approximately 200 wells for transfer by 2003. (2) Complete reclamation and restoration of abandoned sites. Restoration would include dismantling surface facilities, batteries, roads, test satellites, electrical distribution systems and associated power poles, when they are no longer needed for production. Soil contaminated by hydrocarbons would be biologically treated. Roads, facilities, batteries, and well sites would be ripped up, recontoured, disked and seeded with native vegetation. (3) The continued development of the Rocky Mountain Oilfield Testing Center (RMOTC) through the establishment of a consortium of university, state and private institutions. RMOTC would continue to provide facilities and support to government and private industry for testing and evaluating new oilfield and environmental technologies. Based on the findings of the EA, DOE has determined that the proposal does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of NEPA. Therefore, an environmental impact statement is not required.

Environmental Assessment for Device Assembly Facility Operations, Nevada Test Site, Nye County, Nevada. Final Report

Environmental Assessment for Device Assembly Facility Operations, Nevada Test Site, Nye County, Nevada. Final Report PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 39

Get Book

Book Description
The U.S. Department of Energy, Nevada Operations Office (DOE/NV), has prepared an environmental assessment (EA), (DOE/EA-0971), to evaluate the impacts of consolidating all nuclear explosive operations at the newly constructed Device Assembly Facility (DAF) in Area 6 of the Nevada Test Site. These operations generally include assembly, disassembly or modification, staging, transportation, testing, maintenance, repair, retrofit, and surveillance. Such operations have previously been conducted at the Nevada Test Site in older facilities located in Area 27. The DAF will provide enhanced capabilities in a state-of-the-art facility for the safe, secure, and efficient handling of high explosives in combination with special nuclear materials (plutonium and highly enriched uranium). Based on the information and analyses in the EA, DOE has determined that the proposed action would not constitute a major federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.). Therefore, an environmental impact statement is not required, and DOE is issuing this finding of no significant impact.

Grand Gulf Nuclear Station, Units 1-2, Construction

Grand Gulf Nuclear Station, Units 1-2, Construction PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book

Book Description