Final Environmental Impact Report, Environmental Impact Statement for the San Clemente Dan Seismic Safety Project

Final Environmental Impact Report, Environmental Impact Statement for the San Clemente Dan Seismic Safety Project PDF Author:
Publisher:
ISBN:
Category : Dam retirement
Languages : en
Pages :

Get Book Here

Book Description
"Project Purpose, Need & Objectives: The need for the San Clemente Dam Seismic Safety Project is to increase dam safety to meet current design standards. The purposes and objectives for the project are to protect public safety by meeting current standards for withstanding a Maximum Credible Earthquake and Probable Maximum Flood at San Clemente Dam, provide fish passage at the dam, maintain a point of diversion to support existing water supply facilities, water rights and services, and minimize financial impacts to California-American Water ratepayers. Abstract: This Final EIR/EIS analyzes the Proponent's Proposed Project (dam strengthening) and the following alternatives: Alternative 1 (dam notching with partial sediment removal), Alternative 2 (dam removal with total sediment removal), Alternative 3 (Carmel River reroute and dam removal with in-place sediment stabilization), and Alternative 4 (No Project). Chapter 2 contains summaries of each alternative, and Chapter 3 contains detailed descriptions. With the exception of No Project, all of the alternatives evaluated in this EIR/EIS meet the purpose, need and objectives"--Information cover sheet.

Final Environmental Impact Report, Environmental Impact Statement for the San Clemente Dan Seismic Safety Project

Final Environmental Impact Report, Environmental Impact Statement for the San Clemente Dan Seismic Safety Project PDF Author:
Publisher:
ISBN:
Category : Dam retirement
Languages : en
Pages :

Get Book Here

Book Description
"Project Purpose, Need & Objectives: The need for the San Clemente Dam Seismic Safety Project is to increase dam safety to meet current design standards. The purposes and objectives for the project are to protect public safety by meeting current standards for withstanding a Maximum Credible Earthquake and Probable Maximum Flood at San Clemente Dam, provide fish passage at the dam, maintain a point of diversion to support existing water supply facilities, water rights and services, and minimize financial impacts to California-American Water ratepayers. Abstract: This Final EIR/EIS analyzes the Proponent's Proposed Project (dam strengthening) and the following alternatives: Alternative 1 (dam notching with partial sediment removal), Alternative 2 (dam removal with total sediment removal), Alternative 3 (Carmel River reroute and dam removal with in-place sediment stabilization), and Alternative 4 (No Project). Chapter 2 contains summaries of each alternative, and Chapter 3 contains detailed descriptions. With the exception of No Project, all of the alternatives evaluated in this EIR/EIS meet the purpose, need and objectives"--Information cover sheet.

San Clemente Dam Seismic Safety Project

San Clemente Dam Seismic Safety Project PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 564

Get Book Here

Book Description


San Clemente Project, Monterey County

San Clemente Project, Monterey County PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 352

Get Book Here

Book Description


San Clemente General Plan Final Environmental Impact Report

San Clemente General Plan Final Environmental Impact Report PDF Author: Envicom Corporation
Publisher:
ISBN:
Category : City planning
Languages : en
Pages :

Get Book Here

Book Description


Environmental Impact Report and Environmental Impact Statement for Second International Border Station and Interim Access Road, San Diego, California

Environmental Impact Report and Environmental Impact Statement for Second International Border Station and Interim Access Road, San Diego, California PDF Author:
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages : 256

Get Book Here

Book Description


Stage 2 Environmental Impact Report

Stage 2 Environmental Impact Report PDF Author:
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages : 744

Get Book Here

Book Description


Draft Environmental Impact Statement

Draft Environmental Impact Statement PDF Author:
Publisher:
ISBN:
Category : Carmel River (Calif.)
Languages : en
Pages : 0

Get Book Here

Book Description


Final Environmental Impact Statement, Final Environmental Impact Report

Final Environmental Impact Statement, Final Environmental Impact Report PDF Author:
Publisher:
ISBN:
Category : Natural gas pipelines
Languages : en
Pages : 876

Get Book Here

Book Description


Environmental Impact Statement for the New San Clemente Project, Monterey County, California - Regulatory Permit Application Number 16516S09. Appendices

Environmental Impact Statement for the New San Clemente Project, Monterey County, California - Regulatory Permit Application Number 16516S09. Appendices PDF Author: CORPS OF ENGINEERS SAN FRANCISCO CA SAN FRANCISCO DISTRICT.
Publisher:
ISBN:
Category :
Languages : en
Pages : 212

Get Book Here

Book Description
This report consists of six Appendices. Topics include: Description of Carmel Valley simulation model; List of technical support documents; Avian survey and bird list; reptile and amphibian list; mammal list; plant list; riparian zone mitigation plan; State and federal air quality standards; Population and employment projections; Archaeological report.

Environmental Impact Statement for the New San Clemente Project, Monterey County, California - Regulatory Permit Application Number 16516S09

Environmental Impact Statement for the New San Clemente Project, Monterey County, California - Regulatory Permit Application Number 16516S09 PDF Author: CORPS OF ENGINEERS SAN FRANCISCO CA SAN FRANCISCO DISTRICT.
Publisher:
ISBN:
Category :
Languages : en
Pages : 323

Get Book Here

Book Description
Joint State/Federal environmental impact document is concerned with a regulatory permit application by the Monterey Peninsula Water Management District under Section 404 of the Clean Water Act. The proposed project involves construction of a dam across the Carmel River for the purpose of water supply (M & I), drought protection, and restoration of the environmental quality of the river.