Author: IT Corporation
Publisher:
ISBN:
Category : Hazardous waste site remediation
Languages : en
Pages :
Book Description
Final Addendum 2 Remedial Investigation Report
Author: IT Corporation
Publisher:
ISBN:
Category : Hazardous waste site remediation
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Hazardous waste site remediation
Languages : en
Pages :
Book Description
Addendum II to the Final Remedial Investigation Report
Author: Philip Services Corporation
Publisher:
ISBN:
Category : Georgetown (Seattle, Wash.)
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Georgetown (Seattle, Wash.)
Languages : en
Pages :
Book Description
Revised Final Remedial Investigation Addendum Report for Operable Units 4, 8, and 9. Volume II, (Appendices A Through H), Part 2
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 0
Book Description
Report contains Appendices A through H, Volume 2, (Part 2). Addendum reports for Operable units 4, 8 and 9.
Publisher:
ISBN:
Category :
Languages : en
Pages : 0
Book Description
Report contains Appendices A through H, Volume 2, (Part 2). Addendum reports for Operable units 4, 8 and 9.
Revised Final Remedial Investigation Addendum Report for Operable Units 4, 8, and 9. Volume III, (Appendices I Through J), Part 2
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 536
Book Description
Report contains Appendices I through J, Volume 3, (Part 2). Addendum reports for Operable units 4, 8 and 9.
Publisher:
ISBN:
Category :
Languages : en
Pages : 536
Book Description
Report contains Appendices I through J, Volume 3, (Part 2). Addendum reports for Operable units 4, 8 and 9.
Addendum to the Remedial Investigation Report for Operable Unit 2 Site WP07, SS21
Author: Donald Aide
Publisher:
ISBN:
Category : Hazardous waste sites
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Hazardous waste sites
Languages : en
Pages :
Book Description
Remedial Investigation Addendum Report Data Item A009. Volume 2: Appendices A-G.
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 210
Book Description
The U.S. Army Environmental Center (USAEC) directed ABB Environmental Services, Inc. (ABB-ES), under Contract No. DAAA15-91-D-0008, to collect environmental samples at Fort Devens, Massachusetts to fill data gaps identified during initiation of the Feasibility Study (FS) for Group 1A sites. The Group 1A sites include the Shepley's Hill Landfill and Cold Spring Brook Landfill at Fort Devens. This Remedial Investigation (RI) Addendum report summarizes the supplemental field investigations, presents the data obtained, and updates the baseline risk assessment prepared for the RI report. Field investigation programs were conducted between September 1992 and July 1993 and included collecting and analyzing of sediment core samples from Plow Shop and Cold Spring Brook ponds, collecting and analyzing fish tissue samples from these two ponds, and conducting a macroinvertebrate study of the two ponds. In addition, several new monitoring wells were installed and groundwater samples were collected for analysis from 27 monitoring wells at Shepley's Hill Landfill and from 10 monitoring wells at Cold Spring Brook Landfill. Soil, sediment, and groundwater samples were also collected from several other areas, including Nonacoicus Brook Wetland and Grove Pond adjacent to Shepley's Hill Landfill, and the Magazine Area adjacent to Cold Spring Brook Landfill.
Publisher:
ISBN:
Category :
Languages : en
Pages : 210
Book Description
The U.S. Army Environmental Center (USAEC) directed ABB Environmental Services, Inc. (ABB-ES), under Contract No. DAAA15-91-D-0008, to collect environmental samples at Fort Devens, Massachusetts to fill data gaps identified during initiation of the Feasibility Study (FS) for Group 1A sites. The Group 1A sites include the Shepley's Hill Landfill and Cold Spring Brook Landfill at Fort Devens. This Remedial Investigation (RI) Addendum report summarizes the supplemental field investigations, presents the data obtained, and updates the baseline risk assessment prepared for the RI report. Field investigation programs were conducted between September 1992 and July 1993 and included collecting and analyzing of sediment core samples from Plow Shop and Cold Spring Brook ponds, collecting and analyzing fish tissue samples from these two ponds, and conducting a macroinvertebrate study of the two ponds. In addition, several new monitoring wells were installed and groundwater samples were collected for analysis from 27 monitoring wells at Shepley's Hill Landfill and from 10 monitoring wells at Cold Spring Brook Landfill. Soil, sediment, and groundwater samples were also collected from several other areas, including Nonacoicus Brook Wetland and Grove Pond adjacent to Shepley's Hill Landfill, and the Magazine Area adjacent to Cold Spring Brook Landfill.
Revised Final Remedial Investigation Addendum Report for Operable Units 4, 8, and 9. Volume II, (Appendices A Through H).
Author: Rust environment and infrastructure incgrand junction co
Publisher:
ISBN:
Category :
Languages : en
Pages : 911
Book Description
Report contains Appendices A through H. Addendum reports for Operable units 4, 8 and 9.
Publisher:
ISBN:
Category :
Languages : en
Pages : 911
Book Description
Report contains Appendices A through H. Addendum reports for Operable units 4, 8 and 9.
Addendum IV to the Final Comprehensive Remedial Investigation Report
Author: Philip Services Corporation
Publisher:
ISBN:
Category : Georgetown (Seattle, Wash.)
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Georgetown (Seattle, Wash.)
Languages : en
Pages :
Book Description
Addendum to the Remedial Investigation Report on Bear Creek Valley Operable Unit 2 (Rust Spoil Area, Spoil Area 1, and SY-200 Yard) at the Oak Ridge Y-12 Plant Oak Ridge, Tennessee. Volume 1: Main Text
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Revised Final Remedial Investigation. Addendum Report for Operable Units 4, 8, and 9. Volume I.
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 0
Book Description
This revised final report presents the results of previous investigations as well as the results of the Phase I and Phase II RI sampling and analysis for 11 SWMUs within three operable units at Tooele Army Depot (TEAD). TEAD is a National Priorities List (NPL) site under CERCLA. This requires that a Remedial lnvestigation/Feasibility Study (Rl/FS) must be performed. The Phase I and Phase II RI was designed to (1) fill data gaps identified from previous investigations, (2) determine the nature and extent of contamination, and (3) estimate risks to human health. The estimates of risk to the environment were assessed in a separate document, the TE4D Site-wide Ecological Risk Assessment Report. This report presents the results of the RI studies in four volumes. Volume I is the RI Addendum Report and Volumes 11,111, and IV are appendices of supporting information.
Publisher:
ISBN:
Category :
Languages : en
Pages : 0
Book Description
This revised final report presents the results of previous investigations as well as the results of the Phase I and Phase II RI sampling and analysis for 11 SWMUs within three operable units at Tooele Army Depot (TEAD). TEAD is a National Priorities List (NPL) site under CERCLA. This requires that a Remedial lnvestigation/Feasibility Study (Rl/FS) must be performed. The Phase I and Phase II RI was designed to (1) fill data gaps identified from previous investigations, (2) determine the nature and extent of contamination, and (3) estimate risks to human health. The estimates of risk to the environment were assessed in a separate document, the TE4D Site-wide Ecological Risk Assessment Report. This report presents the results of the RI studies in four volumes. Volume I is the RI Addendum Report and Volumes 11,111, and IV are appendices of supporting information.