Expediting Cleanup at the Weldon Spring Site Under CERCLA and NEPA.

Expediting Cleanup at the Weldon Spring Site Under CERCLA and NEPA. PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
The Weldon Spring Site Remedial Action project is being conducted under the Surplus Facilities Management Program of the US Department of Energy (DOE). The DOE has developed an environmental compliance strategy for this project to meet the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the National Environmental Policy Act (NEPA). A key element of this strategy was the development of an integrated CERCLA/NEPA process to minimize, to the extent possible, the need to prepare duplicate documentation. Additionally, the project is implementing various expedited response actions to mitigate actual or potential uncontrolled releases if radioactively or chemically hazardous substances to the environment and to minimize potential health and safety risks to on-site personnel and local human and biotic populations. These actions are being conducted concurrently with the preparation of major environmental compliance documentation. The initiation of site cleanup via these response actions has fostered a very positive relationship with the US Environmental Protection Agency Region VII, the state of Missouri, and the affected public. 2 refs., 3 figs.

Expediting Cleanup at the Weldon Spring Site Under CERCLA and NEPA.

Expediting Cleanup at the Weldon Spring Site Under CERCLA and NEPA. PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
The Weldon Spring Site Remedial Action project is being conducted under the Surplus Facilities Management Program of the US Department of Energy (DOE). The DOE has developed an environmental compliance strategy for this project to meet the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the National Environmental Policy Act (NEPA). A key element of this strategy was the development of an integrated CERCLA/NEPA process to minimize, to the extent possible, the need to prepare duplicate documentation. Additionally, the project is implementing various expedited response actions to mitigate actual or potential uncontrolled releases if radioactively or chemically hazardous substances to the environment and to minimize potential health and safety risks to on-site personnel and local human and biotic populations. These actions are being conducted concurrently with the preparation of major environmental compliance documentation. The initiation of site cleanup via these response actions has fostered a very positive relationship with the US Environmental Protection Agency Region VII, the state of Missouri, and the affected public. 2 refs., 3 figs.

Taking Interim Actions

Taking Interim Actions PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 7

Get Book Here

Book Description
The cleanup of contaminated sites can be expedited by using interim response actions in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, and the National Oil and Hazardous Substances Pollution Contingency Plan (NCP). In fact, a major portion of some Superfund sites can be cleaned up using interim actions. For CERCLA sites being remediated by the US Department of Energy (DOE), such actions must also comply with the National Environmental Policy Act (NEPA) because the DOE has established a policy for integrating CERCLA and NEPA requirements. A strategy for the integrated documentation with implementation of interim actions has been applied successfully at the Weldon Spring site, and major cleanup projects are currently underway. This paper discusses some of the issues associated with integrating CERCLA and NEPA for interim actions and summarizes those actions that have been identified for the Weldon Spring site.

Environmental Remediation '91

Environmental Remediation '91 PDF Author: United States. Department of Energy. Environmental Restoration Conference
Publisher:
ISBN:
Category : Environmental protection
Languages : en
Pages : 980

Get Book Here

Book Description


Work Plan for the Remedial Investigation

Work Plan for the Remedial Investigation PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 148

Get Book Here

Book Description
The US Department of Energy (DOE) is conducting cleanup activities at the Weldon Spring site, which is located in St. Charles County, Missouri, about 48 km (30 mi) west of St. Louis. The Weldon Spring site consists of two noncontiguous areas -- the chemical plant area, which includes four raffinate pits, and the quarry. Cleanup activities at the Weldon Spring site are conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, incorporating the values of the National Environmental Policy Act (NEPA). The contents of the documents prepared for the project are not intended to represent a statement regarding the legal applicability of NEPA to remedial actions conducted under CERCLA. In accordance with the integrated CERCLA/NEPA approach, a remedial investigation/feasibility study-environmental assessment (RI/FS-EA) is being conducted to evaluate conditions and potential responses for the quarry residuals operable unit (QROU). This operable unit consists of the following areas and/or media: the residual material remaining at the Weldon Spring quarry after removal of the pond water and bulk waste; underlying groundwater; and other media located in the surrounding vicinity of the quarry, including adjacent soil, surface water, and sediment in Femme Osage Slough. This work plan identifies the activities within the RI/FS-EA process that are being proposed to address contamination remaining at the quarry area.

Energy Research Abstracts

Energy Research Abstracts PDF Author:
Publisher:
ISBN:
Category : Power resources
Languages : en
Pages : 782

Get Book Here

Book Description


Radioactive Waste Management

Radioactive Waste Management PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 466

Get Book Here

Book Description


Weldon Spring Site, Remedial Action

Weldon Spring Site, Remedial Action PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 612

Get Book Here

Book Description


ERDA Energy Research Abstracts

ERDA Energy Research Abstracts PDF Author:
Publisher:
ISBN:
Category : Power resources
Languages : en
Pages : 848

Get Book Here

Book Description


Government Reports Annual Index

Government Reports Annual Index PDF Author:
Publisher:
ISBN:
Category : Government reports announcements & index
Languages : en
Pages : 1372

Get Book Here

Book Description


Government Reports Announcements & Index

Government Reports Announcements & Index PDF Author:
Publisher:
ISBN:
Category : Science
Languages : en
Pages : 658

Get Book Here

Book Description