Evaluation of Roadware 10-Minute Concrete Mender for PCC Bridge Deck Crack Sealing

Evaluation of Roadware 10-Minute Concrete Mender for PCC Bridge Deck Crack Sealing PDF Author: Khader Abu Al-eis
Publisher:
ISBN:
Category : Bridges
Languages : en
Pages : 38

Get Book Here

Book Description

Evaluation of Roadware 10-Minute Concrete Mender for PCC Bridge Deck Crack Sealing

Evaluation of Roadware 10-Minute Concrete Mender for PCC Bridge Deck Crack Sealing PDF Author: Khader Abu Al-eis
Publisher:
ISBN:
Category : Bridges
Languages : en
Pages : 38

Get Book Here

Book Description


Capital Preventive Maintenance

Capital Preventive Maintenance PDF Author:
Publisher:
ISBN:
Category : Highway departments
Languages : en
Pages : 66

Get Book Here

Book Description


Bridge Drainage Systems

Bridge Drainage Systems PDF Author: National Research Council (U.S.). Transportation Research Board
Publisher:
ISBN:
Category : Bridges
Languages : en
Pages : 56

Get Book Here

Book Description
Design principles and procedures and maintenance practices for bridge drainage systems are evaluated in this report, which also includes recommendations for improvements on current practice. Bridges should have adequate cross-slope and grade to allow the water to run quickly into drains. Where grades permit, some states carry all the water to catch basins at the ends. An inlet box may be used to collect the runoff. Some states have detailed procedures for determining drain spacing. Debris can be controlled by keeping it out of inlet boxes, accepting and storing it so it cannot go through the system, or transporting it through. Maintenance at regular intervals is the key to the success of a drainage system. Disposal of run off water can be a simple straight drop onto the land or water beneath the bridge or a pipe system to carry the water to the local sewer system. Current practices indicate that deck cross-slope and grade should be less than 2% and 0.5% respectively; that bridge drains may be holes through the deck, fabricated inlet boxes, or catch basins at the ends of the bridge; that inlet areas should be as large as possible; that pipes should have a minimum diameter of 6 in., a miminum radius of 18 in., and a minimum slope of 2%; that cleanout plugs and elbows should be easily accessible; that there should be improved communication between designers and maintenance personnel; and most importantly, that bridge drainage systems should be regularly and carefully inspected and serviced.