Evaluation of a Thin-bonded Portland Cement Concrete Pavement Overlay

Evaluation of a Thin-bonded Portland Cement Concrete Pavement Overlay PDF Author: Thomas Elliott Freeman
Publisher:
ISBN:
Category : Pavements
Languages : en
Pages : 16

Get Book Here

Book Description
This report discusses the performance of the Virginia Department of Transportation's first modern rehabilitation project involving a thin-bonded portland cement concrete overlay of an existing jointed concrete pavement. The performance of the rigid overlay, which was constructed in a fast-track mode to minimize lane closure time, was evaluated by detailed condition surveys conducted annually throughout a 6-year analysis period to identify, document, and monitor the occurrence of distress. The roughness of the overlay was also measured annually with an accelerometer-based inertial road profiler to permit an examination of the effects of surface deterioration on ride quality. After 6 full years of service, which included only minimal maintenance, the pavement overlay remained in good overall condition. Although the ride quality of the overlay remained virtually unchanged throughout the period, a significant increase in the occurrence of low-to-moderate-severity joint spalls, corner breaks, and to a lesser extent transverse cracks was noted during the fifth and sixth years. The extrusion of compression seals and the subsequent infiltration of water into the pavement structure probably contributed to the observed localized failure of the overlay/substrate bond in the vicinity of joints. This condition, in turn, weakened the pavement's structural capacity at panel edges and thereby resulted in the formation of corner breaks and cracks parallel with and near transverse joints. The consideration of thin-bonded concrete overlays constructed in a fast-track mode is recommended as a viable rehabilitation alternative for jointed concrete pavements that are not severely distressed. However, careful attention to joint installation and, in particular, joint maintenance is recommended for similar future rehabilitation projects.

Evaluation of a Thin-bonded Portland Cement Concrete Pavement Overlay

Evaluation of a Thin-bonded Portland Cement Concrete Pavement Overlay PDF Author: Thomas Elliott Freeman
Publisher:
ISBN:
Category : Pavements
Languages : en
Pages : 16

Get Book Here

Book Description
This report discusses the performance of the Virginia Department of Transportation's first modern rehabilitation project involving a thin-bonded portland cement concrete overlay of an existing jointed concrete pavement. The performance of the rigid overlay, which was constructed in a fast-track mode to minimize lane closure time, was evaluated by detailed condition surveys conducted annually throughout a 6-year analysis period to identify, document, and monitor the occurrence of distress. The roughness of the overlay was also measured annually with an accelerometer-based inertial road profiler to permit an examination of the effects of surface deterioration on ride quality. After 6 full years of service, which included only minimal maintenance, the pavement overlay remained in good overall condition. Although the ride quality of the overlay remained virtually unchanged throughout the period, a significant increase in the occurrence of low-to-moderate-severity joint spalls, corner breaks, and to a lesser extent transverse cracks was noted during the fifth and sixth years. The extrusion of compression seals and the subsequent infiltration of water into the pavement structure probably contributed to the observed localized failure of the overlay/substrate bond in the vicinity of joints. This condition, in turn, weakened the pavement's structural capacity at panel edges and thereby resulted in the formation of corner breaks and cracks parallel with and near transverse joints. The consideration of thin-bonded concrete overlays constructed in a fast-track mode is recommended as a viable rehabilitation alternative for jointed concrete pavements that are not severely distressed. However, careful attention to joint installation and, in particular, joint maintenance is recommended for similar future rehabilitation projects.

Construction of a Thin-bonded Portland Cement Concrete Overlay Using Accelerated Paving Techniques

Construction of a Thin-bonded Portland Cement Concrete Overlay Using Accelerated Paving Techniques PDF Author: Kenneth H. McGhee
Publisher:
ISBN:
Category : Pavements, Concrete
Languages : en
Pages : 32

Get Book Here

Book Description
The report describes the Virginia Department of Transportations' first modern experience with the construction of thin-bonded Portland cement concrete overlays of existing concrete pavements and with the fast track mode of rigid paving. The study was conducted in cooperation with the Federal Highway Administration (FHWA) and used a paving mixture verified in an FHWA mobile laboratory. The study showed that the fast track mode will permit lane closure times as short as 48 hours. Of special interest was the finding that adequate strength of the bond between the old pavement and the overlay is not dependent on the use of a bonding grout.

Ultra-thin Portland Cement Concrete Overlay Extended Evaluation

Ultra-thin Portland Cement Concrete Overlay Extended Evaluation PDF Author: James K. Cable
Publisher:
ISBN:
Category : Pavements
Languages : en
Pages : 114

Get Book Here

Book Description
The Iowa ultra-thin project demonstrated the application of thin portland cement concrete overlays as a rehabilitation technique. It combined the variables of base preparation, overlay thickness, slab size, and fiber enhancement into a series of test sections over a 7.2-mile length. This report identifies the performance of the overlays in terms of deflection reduction, reduced cracking, and improved bonding between the portland cement concrete (PCC) and asphalt cement concrete (ACC) base layers. The original research project was designed to evaluate the variables over a 5-year period of time. A second project provided the opportunity to test overlay rehabilitation techniques and continue measurement of the original overlay performance for 5 additional years.

Rehabilitation and Evaluation of Distressed Portland Cement Concrete Pavement

Rehabilitation and Evaluation of Distressed Portland Cement Concrete Pavement PDF Author: Daniel Okpala
Publisher:
ISBN:
Category : Concrete
Languages : en
Pages : 50

Get Book Here

Book Description


Structural Overlay Strategies for Jointed Concrete Pavements

Structural Overlay Strategies for Jointed Concrete Pavements PDF Author:
Publisher:
ISBN:
Category : Pavements, Concrete
Languages : en
Pages : 192

Get Book Here

Book Description


Performance of Nongrouted Thin Bonded P.C.C. Overlays

Performance of Nongrouted Thin Bonded P.C.C. Overlays PDF Author: Mark K. Kaler
Publisher:
ISBN:
Category : Pavements
Languages : en
Pages : 20

Get Book Here

Book Description
The Iowa road system has approximately 13,000 miles of Portland Cement Concrete Pavements, many of which are reaching the stage where major rehabilitation is required. Age, greater than anticipated traffic, heavier loads and deterioration related to coarse aggregate in the original pavement are some of the reasons that these pavements have reached this level of distress. One method utilized to rehabilitate distressed or underdesigned PCC pavements is the thin bonded Portland Cement Concrete overlay. Since the introduction of thin bonded overlays on highway pavements in 1973, the concrete paving industry has made progress in reducing the construction costs of this rehabilitation technique. With the advent of the shotblast machine, surface preparation costs have decreased from over $4.00 per square yard to most recently $1.42 per square yard. Other construction costs, including placement, grouting and sawing, have also declined. With each project, knowledge and efficiency have improved.

Thin Bonded Portland Cement Concrete Overlay and Concrete Pavement Restoration at Hershey, Pennsylvania

Thin Bonded Portland Cement Concrete Overlay and Concrete Pavement Restoration at Hershey, Pennsylvania PDF Author: Matthew T. McCormack
Publisher:
ISBN:
Category : Pavements
Languages : en
Pages : 72

Get Book Here

Book Description


Status of Thin-bonded Concrete Overlays

Status of Thin-bonded Concrete Overlays PDF Author: Robert H. Gausman
Publisher:
ISBN:
Category : Pavements
Languages : en
Pages : 48

Get Book Here

Book Description
The Demonstration Projects Division of the Federal Highway Administration has been involved in the evaluation of a number of thin-bonded overlays since 1979. This report presents the status of those projects and includes a summary of some of the more important findings to date.

Ultrathin Portland Cement Concrete Overlay Extended Evaluation Construction Report

Ultrathin Portland Cement Concrete Overlay Extended Evaluation Construction Report PDF Author: James K. Cable
Publisher:
ISBN:
Category : Pavements
Languages : en
Pages : 31

Get Book Here

Book Description
The objective of this research was to investigate the interface bonding condition between an ultra-thin PCC overlay and an ACC base over time, considering the previously mentioned variables. This research lasted for five years, at which time it was extended an additional five years. The new phase of the project was initiated by removing cracked panels existing in the 2-inch thick PCC sections and replacing them with three inches of PCC. The project extension (TR 432) will provide an increased understanding of slab bonding conditions over a longer period, as well as knowledge regarding the behavior of the newly rehabilitated areas.

Evaluation of Unbonded Portland Cement Concrete Overlays

Evaluation of Unbonded Portland Cement Concrete Overlays PDF Author:
Publisher:
ISBN:
Category : Technology & Engineering
Languages : en
Pages : 92

Get Book Here

Book Description