Environmental Assessment and Finding of No Significant Impact

Environmental Assessment and Finding of No Significant Impact PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 74

Get Book Here

Book Description
The U.S. Department of Energy (DOE) prepared this environmental assessment (EA) to analyze the potential environmental impacts associated with the proposed interim measures for the Mixed Waste Management Facility (MW) groundwater at the Burial Ground Complex (BGC) at the Savannah River Site (SRS), located near Aiken, South Carolina. DOE proposes to install a small metal sheet pile dam to impound water around and over the BGC groundwater seepline. In addition, a drip irrigation system would be installed. Interim measures will also address the reduction of volatile organic compounds (VOCS) from ''hot-spot'' regions associated with the Southwest Plume Area (SWPA). This action is taken as an interim measure for the MWMF in cooperation with the South Carolina Department of Health and Environmental Control (SCDHEC) to reduce the amount of tritium seeping from the BGC southwest groundwater plume. The proposed action of this EA is being planned and would be implemented concurrent with a groundwater corrective action program under the Resource Conservation and Recovery Act (RCRA). On September 30, 1999, SCDHEC issued a modification to the SRS RCRA Part B permit that adds corrective action requirements for four plumes that are currently emanating from the BGC. One of those plumes is the southwest plume. The RCRA permit requires SRS to submit a corrective action plan (CAP) for the southwest plume by March 2000. The permit requires that the initial phase of the CAP prescribe a remedy that achieves a 70-percent reduction in the annual amount of tritium being released from the southwest plume area to Fourmile Branch, a nearby stream. Approval and actual implementation of the corrective measure in that CAP may take several years. As an interim measure, the actions described in this EA would manage the release of tritium from the southwest plume area until the final actions under the CAP can be implemented. This proposed action is expected to reduce the release of tritium from the southwest plume area to Fourmile Branch between 25 to 35 percent. If this proposed action is undertaken and its effectiveness is demonstrated, it may become a component of the final action in the CAP. This document was prepared in compliance with the National Environmental Policy Act (NEPA) of 1969, as amended; the requirements of the Council on Environmental Quality Regulations for Implementing NEPA (40 CFR 1500-1508); and the DOE Regulations for Implementing NEPA (10 CFR 1021). NEPA requires the assessment of environmental consequences of Federal actions that may affect the quality of the human environment. Based on the potential for impacts described herein, DOE will either publish a Finding of No Significant Impact (FONSI) or prepare an environmental impact statement (EM).

Environmental Assessment and Finding of No Significant Impact

Environmental Assessment and Finding of No Significant Impact PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 74

Get Book Here

Book Description
The U.S. Department of Energy (DOE) prepared this environmental assessment (EA) to analyze the potential environmental impacts associated with the proposed interim measures for the Mixed Waste Management Facility (MW) groundwater at the Burial Ground Complex (BGC) at the Savannah River Site (SRS), located near Aiken, South Carolina. DOE proposes to install a small metal sheet pile dam to impound water around and over the BGC groundwater seepline. In addition, a drip irrigation system would be installed. Interim measures will also address the reduction of volatile organic compounds (VOCS) from ''hot-spot'' regions associated with the Southwest Plume Area (SWPA). This action is taken as an interim measure for the MWMF in cooperation with the South Carolina Department of Health and Environmental Control (SCDHEC) to reduce the amount of tritium seeping from the BGC southwest groundwater plume. The proposed action of this EA is being planned and would be implemented concurrent with a groundwater corrective action program under the Resource Conservation and Recovery Act (RCRA). On September 30, 1999, SCDHEC issued a modification to the SRS RCRA Part B permit that adds corrective action requirements for four plumes that are currently emanating from the BGC. One of those plumes is the southwest plume. The RCRA permit requires SRS to submit a corrective action plan (CAP) for the southwest plume by March 2000. The permit requires that the initial phase of the CAP prescribe a remedy that achieves a 70-percent reduction in the annual amount of tritium being released from the southwest plume area to Fourmile Branch, a nearby stream. Approval and actual implementation of the corrective measure in that CAP may take several years. As an interim measure, the actions described in this EA would manage the release of tritium from the southwest plume area until the final actions under the CAP can be implemented. This proposed action is expected to reduce the release of tritium from the southwest plume area to Fourmile Branch between 25 to 35 percent. If this proposed action is undertaken and its effectiveness is demonstrated, it may become a component of the final action in the CAP. This document was prepared in compliance with the National Environmental Policy Act (NEPA) of 1969, as amended; the requirements of the Council on Environmental Quality Regulations for Implementing NEPA (40 CFR 1500-1508); and the DOE Regulations for Implementing NEPA (10 CFR 1021). NEPA requires the assessment of environmental consequences of Federal actions that may affect the quality of the human environment. Based on the potential for impacts described herein, DOE will either publish a Finding of No Significant Impact (FONSI) or prepare an environmental impact statement (EM).

Complex Cleanup

Complex Cleanup PDF Author:
Publisher:
ISBN:
Category : Government publications
Languages : en
Pages : 34

Get Book Here

Book Description


In-situ Air Sparging - Engineering and Design (EM 1110-1-4005).

In-situ Air Sparging - Engineering and Design (EM 1110-1-4005). PDF Author:
Publisher:
ISBN: 9781615836406
Category :
Languages : en
Pages :

Get Book Here

Book Description


Government Reports Annual Index

Government Reports Annual Index PDF Author:
Publisher:
ISBN:
Category : Government reports announcements & index
Languages : en
Pages : 1368

Get Book Here

Book Description


Bulletin of the Atomic Scientists

Bulletin of the Atomic Scientists PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 48

Get Book Here

Book Description


Ecrits sur l'art

Ecrits sur l'art PDF Author: Emile Verhaeren
Publisher:
ISBN:
Category :
Languages : en
Pages : 558

Get Book Here

Book Description


INIS Atomindeks

INIS Atomindeks PDF Author:
Publisher:
ISBN:
Category : Nuclear energy
Languages : en
Pages : 584

Get Book Here

Book Description


Самодержавіе народа

Самодержавіе народа PDF Author: Я Магазинер
Publisher:
ISBN:
Category : Labor
Languages : en
Pages : 142

Get Book Here

Book Description


Bulletin of the Atomic Scientists

Bulletin of the Atomic Scientists PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 56

Get Book Here

Book Description
The Bulletin of the Atomic Scientists is the premier public resource on scientific and technological developments that impact global security. Founded by Manhattan Project Scientists, the Bulletin's iconic "Doomsday Clock" stimulates solutions for a safer world.

Tank Waste Retrieval, Processing, and On-site Disposal at Three Department of Energy Sites

Tank Waste Retrieval, Processing, and On-site Disposal at Three Department of Energy Sites PDF Author: National Research Council
Publisher: National Academies Press
ISBN: 0309180147
Category : Science
Languages : en
Pages : 214

Get Book Here

Book Description
DOE Tank Waste: How clean is clean enough? The U.S. Congress asked the National Academies to evaluate the Department of Energy's (DOE's) plans for cleaning up defense-related radioactive wastes stored in underground tanks at three sites: the Hanford Site in Washington State, the Savannah River Site in South Carolina, and the Idaho National Laboratory. DOE plans to remove the waste from the tanks, separate out high-level radioactive waste to be shipped to an off-site geological repository, and dispose of the remaining lower-activity waste onsite. The report concludes that DOE's overall plan is workable, but some important challenges must be overcomeâ€"including the removal of residual waste from some tanks, especially at Hanford and Savannah River. The report recommends that DOE pursue a more risk-informed, consistent, participatory, and transparent for making decisions about how much waste to retrieve from tanks and how much to dispose of onsite. The report offers several other detailed recommendations to improve the technical soundness of DOE's tank cleanup plans.