Des Moines River, Recreational River and Greenbelt GDM

Des Moines River, Recreational River and Greenbelt GDM PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 352

Get Book Here

Book Description

Des Moines River, Recreational River and Greenbelt GDM

Des Moines River, Recreational River and Greenbelt GDM PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 352

Get Book Here

Book Description


Data Relating to H.R. 6

Data Relating to H.R. 6 PDF Author:
Publisher:
ISBN:
Category : Des Moines River
Languages : en
Pages : 6

Get Book Here

Book Description


Des Moines River, Recreational River and Greenbelt GDM

Des Moines River, Recreational River and Greenbelt GDM PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 330

Get Book Here

Book Description


Annual Program Management Report (1990), Des Moines Recreational River and Greenbelt, Des Moines River, Iowa

Annual Program Management Report (1990), Des Moines Recreational River and Greenbelt, Des Moines River, Iowa PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 113

Get Book Here

Book Description
The General Design Memorandum (GDM) and Programmatic Environmental Impact Statement for the Des Moines Recreational River and Greenbelt were approved on August 1, 1988. The GDM includes a recommendation to increase the Federal Construction cost estimate, prepare Feature Design Memoranda (FDM) for nine projects, and submit annual reports which will include an update of the master plan. The 1989 Annual Program Management Report was the first yearly report prepared for the project. The Advisory Committee recommended and the Corps of Engineers approved the addition of 15 projects to the master plan, the preparation of Feature Design Memoranda for 11 projects, and the deletion of 2 projects which have proceeded to construction by local interests. The 1989 Annual Program Management Report was approved on October 2, 1989. For the 1990 Annual Program Management Report, the Advisory Committee has recommended the addition of 5 projects to the master plan, the preparation of Feature Design Memoranda for 3 potentially cost-shared projects and the deletion of 1 project which will be constructed by the local sensor.

Boundaries of the Des Moines Recreational River and Greenbelt, Iowa Project

Boundaries of the Des Moines Recreational River and Greenbelt, Iowa Project PDF Author:
Publisher:
ISBN:
Category : Des Moines River
Languages : en
Pages : 8

Get Book Here

Book Description


Annual Program Management Report, 1991, Des Moines Recreational River and Greenbelt, Des Moines River, Iowa

Annual Program Management Report, 1991, Des Moines Recreational River and Greenbelt, Des Moines River, Iowa PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 82

Get Book Here

Book Description
The General Design Memorandum (GDM) and Programmatic Environmental Impact Statement for the Des Moines Recreational River and Greenbelt were approved on August 1, 1988. The GDM included a recommendation to increase the Federal construction cost estimate, prepare Feature Design Memoranda for nine projects, and submit annual reports which will include an update of the master plan. For the 1991 Annual Program Management Report, the Advisory Committee has made the following recommendations: (a) The addition of five potentially cost-shared projects to the master plan; (b) The preparation of a feature design memorandum for one potentially cost-shared project; and (c) The combination of two potentially cost-shared projects. The project has five authorized purposes: (1) The construction, operation, and maintenance of recreational facilities; (2) The construction, operation, and maintenance of streambank stabilization structures; and (3) The operation and maintenance of all structures constructed before the date of authorization of this project. (4) Such tree plantings, trails, vegetation, and wildlife protection and development and other activities as will enhance the natural environment for recreational purposes; and (5) The prohibition or limitation of the killing, wounding, or capturing of any wild bird or animal.

Plan for Engineering and Design, Des Moines Recreational River and Greenbelt, Des Moines River, Iowa

Plan for Engineering and Design, Des Moines Recreational River and Greenbelt, Des Moines River, Iowa PDF Author:
Publisher:
ISBN:
Category : Des Moines Recreational River and Greenbelt (Iowa)
Languages : en
Pages : 19

Get Book Here

Book Description


General Design Memorandum, Des Moines Recreational River and Greenbelt, Des Moines River, Iowa with Programmatic Environmental Impact Statement

General Design Memorandum, Des Moines Recreational River and Greenbelt, Des Moines River, Iowa with Programmatic Environmental Impact Statement PDF Author:
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages :

Get Book Here

Book Description


Data Relating to H.R. 6

Data Relating to H.R. 6 PDF Author:
Publisher:
ISBN:
Category : Des Moines River
Languages : en
Pages : 0

Get Book Here

Book Description


Draft General Design Memorandum, Des Moines Recreational River and Greenbelt, Des Moines River, Iowa

Draft General Design Memorandum, Des Moines Recreational River and Greenbelt, Des Moines River, Iowa PDF Author:
Publisher:
ISBN:
Category : Des Moines Recreational River and Greenbelt (Iowa)
Languages : en
Pages :

Get Book Here

Book Description