Construction and Operation of Titan IV/Centaur Launch Complex Vandenberg Air Force Base, California

Construction and Operation of Titan IV/Centaur Launch Complex Vandenberg Air Force Base, California PDF Author:
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages :

Get Book Here

Book Description

Construction and Operation of Titan IV/Centaur Launch Complex Vandenberg Air Force Base, California

Construction and Operation of Titan IV/Centaur Launch Complex Vandenberg Air Force Base, California PDF Author:
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages :

Get Book Here

Book Description


Environmental Impact Statement: Construction and Operation of Titan IV/Centaur Launch Complex, Vandenberg Air Force Base, California

Environmental Impact Statement: Construction and Operation of Titan IV/Centaur Launch Complex, Vandenberg Air Force Base, California PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 579

Get Book Here

Book Description
This Environmental Impact Statement (EIS) addresses the construction and operation of Titan IV/Centaur Launch Complex (TCLC) on South Vandenberg Air Force Base (VAFB), California, for launching the Titan IV/Centaur space vehicle. This action would support requirements for timely and reliable launch of critical DoD satellites from a location where highly inclined and polar orbits can be safely achieved; provide capability to launch payloads in the 10,000-pound class to high energy, inclined orbits; and (3) maintain assured access to space by providing backup launch capability for the Titan IV/NUS (no upper stage). Alternatives considered include the no action alternative and the development and operation of the facility at three undeveloped sites (Vina Terrace, Boathouse Flats, or Cypress Ridge) and one developed site, Satellite Launch Complex-6 (SLC-6), on south VAFB. Primary impacts to the physical environment of south VAFB would involve soil and vegetation loss during construction (for the undeveloped sites) and effects of sonic boom on Channel Islands wildlife during launch events. Primary impacts to the human environment of north Santa Barbara County relate to the potential for a maximum of 550 employment opportunities during project construction and 400 during operation. The primary regional effects of temporary and permanent population growth would be increases in economic activity and in demands on public services and facilities. Other impacts would include the visual impacts from implementation at one of the undeveloped sites and the potential closure of Jalama Beach County Park during launch events. Potential impacts to health and safety also would occur, related to the fuels utilized. This EIS concludes that environmental impacts from the TCLC would be substantially less at the SLC-6 site than at the undeveloped sites, and is the preferred alternative to meet DoD launch program requirements. (24 tables, 62 figures, 53 refs.).

Space Launch Complex 7 Construction and Operation, South Vandenburg Air Force Base (AFB)

Space Launch Complex 7 Construction and Operation, South Vandenburg Air Force Base (AFB) PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 620

Get Book Here

Book Description


Environmental Impact Analysis Process. Volume 3. Preliminary Final Environmental Impact Statement Construction and Operation of Space Launch Complex 7

Environmental Impact Analysis Process. Volume 3. Preliminary Final Environmental Impact Statement Construction and Operation of Space Launch Complex 7 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 394

Get Book Here

Book Description
The proposed action is the construction and operation of a Titan IV/ Centaur space launch complex in support of the Department of Defense (DOD) space program. The project is designed for a minimum of 25 years, with construction planned to begin in 1991, followed by operations in 1994 or 1995. Known as Space Launch Complex 7 (SLC-7), the project would be located on South Vandenberg Air Force Base (VAFB), California. The Titan IV/Centaur is an unmanned, expendable launch vehicle capable of launching critical DOD payloads in the 10,000-pound class to high energy orbits. The proposed facility at VAFB would support requirements for timely launches of these payloads from a location where highly inclined and polar orbits can be safely achieved. This action would maintain assured access to space by providing backup launch capability for the Titan IV/ Centaur and Titan IV/NUS vehicles. Diagrams of the two launch vehicles are shown in Figure S.2 (Titan IV Vehicle Configurations).

Titan IV Space Launch Vehicle Modifications and Launch Operations Program, Vandenberg Air Force Base, California

Titan IV Space Launch Vehicle Modifications and Launch Operations Program, Vandenberg Air Force Base, California PDF Author:
Publisher:
ISBN:
Category : California
Languages : en
Pages :

Get Book Here

Book Description


Construction and Operation of Space Launch Complex 7 Vandenberg Air Force Base, California: Appendices

Construction and Operation of Space Launch Complex 7 Vandenberg Air Force Base, California: Appendices PDF Author:
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages :

Get Book Here

Book Description


Construction and Operation of Space Launch Complex 7 Vandenberg Air Force Base, California

Construction and Operation of Space Launch Complex 7 Vandenberg Air Force Base, California PDF Author:
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages :

Get Book Here

Book Description


Military construction appropriations for 1989

Military construction appropriations for 1989 PDF Author: United States. Congress. House. Committee on Appropriations. Subcommittee on Military Construction Appropriations
Publisher:
ISBN:
Category :
Languages : en
Pages : 392

Get Book Here

Book Description


Military Construction Appropriations for 1989: Department of Defense

Military Construction Appropriations for 1989: Department of Defense PDF Author: United States. Congress. House. Committee on Appropriations. Subcommittee on Military Construction Appropriations
Publisher:
ISBN:
Category : United States
Languages : en
Pages : 398

Get Book Here

Book Description


Evolved Expendable Launch Vehicle Program

Evolved Expendable Launch Vehicle Program PDF Author:
Publisher:
ISBN:
Category : California
Languages : en
Pages : 468

Get Book Here

Book Description