Coastal Basin, Salem-Montville, Connecticut, Barnes Reservoir Dam Phase 1 Inspection Report, National Dam Inspection Program

Coastal Basin, Salem-Montville, Connecticut, Barnes Reservoir Dam Phase 1 Inspection Report, National Dam Inspection Program PDF Author: United States. Army. Corps of Engineers. New England Division
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 208

Get Book Here

Book Description


National Program for Inspection of Non-Federal Dams. Barnes Reservoir Dam (CT 00236), Coastal Basin, Salem-Montville, Connecticut. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Barnes Reservoir Dam (CT 00236), Coastal Basin, Salem-Montville, Connecticut. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 93

Get Book Here

Book Description
The dam at Barnes Reservoir is an earth embankment approximately 1,200 feet long, 28 feet high with an average crest width of 15 feet. An uncontrolled stone masonry spillway is constructed integrally with the embankment and its discharges flow through a curved converging chute to the stream below the dam. The outlet works and control tower are located near the left abutment of the dam and discharges from the tower's wet well flow through a 24-inch diameter conduit beneath the dam. As a result of the visual inspection and the review of limited available data regarding this facility, the dam is considered to be in FAIR condition. To assure the long-term performance of this structure, several items of concern require attention: The apparent seepage beneath the spillway slab, a localized depression area in the crest of the dike, the extensive overgrowth of the embankments, spillway and downstream channel, and the inoperability of the upper intake gate to the control tower. The maximum outflow capacity of the spillway under a stillwater condition is equal to 1,200 CFS which represents more than 100 percent of the test flood. However, this discharge will produce a water surface level in the reservoir that has a freeboard allowance of only 1.2 feet below the top of the dam.

Government Reports Annual Index

Government Reports Annual Index PDF Author:
Publisher:
ISBN:
Category : Government reports announcements & index
Languages : en
Pages : 1316

Get Book Here

Book Description


Government Reports Announcements & Index

Government Reports Announcements & Index PDF Author:
Publisher:
ISBN:
Category : Science
Languages : en
Pages : 1028

Get Book Here

Book Description


Thames River Basin, Griswold, Connecticut, Stone Hill Reservoir Dam, Phase I Inspection Report, National Dam Inspection Program

Thames River Basin, Griswold, Connecticut, Stone Hill Reservoir Dam, Phase I Inspection Report, National Dam Inspection Program PDF Author: United States. Army. Corps of Engineers. New England Division
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 170

Get Book Here

Book Description


Thames River Basin, Colchester, Connecticut, Deep River Reservoir Dam Phase I Inspection Report, National Dam Inspection Program

Thames River Basin, Colchester, Connecticut, Deep River Reservoir Dam Phase I Inspection Report, National Dam Inspection Program PDF Author: United States. Army. Corps of Engineers. New England Division
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 196

Get Book Here

Book Description


Reuben Hart Reservoir Dam, Naugatuck River Basin, Torrington, Connecticut, Phase I Inspection Report, National Dam Inspection Program

Reuben Hart Reservoir Dam, Naugatuck River Basin, Torrington, Connecticut, Phase I Inspection Report, National Dam Inspection Program PDF Author: United States. Army. Corps of Engineers. New England Division
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 190

Get Book Here

Book Description


Portland Reservoir Dam, Connecticut River Basin, Portland, Connecticut Phase I Inspection Report, National Dam Inspection Program

Portland Reservoir Dam, Connecticut River Basin, Portland, Connecticut Phase I Inspection Report, National Dam Inspection Program PDF Author: United States. Army. Corps of Engineers. New England Division
Publisher:
ISBN:
Category : Dams
Languages : en
Pages : 234

Get Book Here

Book Description


National Program for Inspection of Non-Federal Dams. Stony Brook Reservoir Dam (CT 00243), Thames River Basin, Montville, Connecticut. Phase I Inspection Report

National Program for Inspection of Non-Federal Dams. Stony Brook Reservoir Dam (CT 00243), Thames River Basin, Montville, Connecticut. Phase I Inspection Report PDF Author: CORPS OF ENGINEERS WALTHAM MA NEW ENGLAND DIV.
Publisher:
ISBN:
Category :
Languages : en
Pages : 184

Get Book Here

Book Description
Stony Brook Reservoir Dam consists of two earthfill embankments with concrete core walls, separated by a 650 ft. long natural promontory. A concrete spillway, 35 ft. wide, is located in the Side Dam. The spillway discharges into a stone masonry channel about 220 ft. long. A gate house located upstream from the Main Dam houses controls for the inlet to a 24 in. dia. water supply line and a 24 in. dia. low level outlet. The dam and appurtenant works are judged to be in generally fair condition. Brush was growing on the downstream slopes of both dams and in the spillway discharge channel. The gate house is in need of repair and the condition of the outlet gate could not be verified. Seeps were found downstream of both dams and cavities were found in the slopes of both embankments. The routed test flood outflow of 5,200 cfs overtops the crest of the Main Dam by 1.3 ft. and the Side Dam by 0.6 ft. The spillway can pass 1,250 cfs or about 24 percent of the routed test flood outflow without overtopping the Main Dam.

Globe Hollow Reservoir Dam, Manchester, Connecticut

Globe Hollow Reservoir Dam, Manchester, Connecticut PDF Author:
Publisher:
ISBN:
Category : Connecticut River Watershed (Conn.)
Languages : en
Pages : 236

Get Book Here

Book Description