Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
B Plant Complex Treatment, Storage, and Disposal Units Inspection Plan
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
100-N Area Treatment, Storage, and Disposal Units Inspection Plan
Author: Jack William Donnelly
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages :
Book Description
Radioactive Waste Management
Author:
Publisher:
ISBN:
Category : Radioactive waste disposal
Languages : en
Pages : 726
Book Description
Publisher:
ISBN:
Category : Radioactive waste disposal
Languages : en
Pages : 726
Book Description
Energy Research Abstracts
Author:
Publisher:
ISBN:
Category : Power resources
Languages : en
Pages : 782
Book Description
Publisher:
ISBN:
Category : Power resources
Languages : en
Pages : 782
Book Description
Government Reports Announcements & Index
Author:
Publisher:
ISBN:
Category : Science
Languages : en
Pages : 562
Book Description
Publisher:
ISBN:
Category : Science
Languages : en
Pages : 562
Book Description
1324-N/NA Liquid Waste Treatment and Disposal Facility
Author: J. P. Zoric
Publisher:
ISBN:
Category :
Languages : en
Pages : 6
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 6
Book Description
INIS Atomindex
Author:
Publisher:
ISBN:
Category : Nuclear energy
Languages : en
Pages : 682
Book Description
Publisher:
ISBN:
Category : Nuclear energy
Languages : en
Pages : 682
Book Description
Programmatic National Spent Nuclear Fuel Management Program and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Program (ID,CA,WA,NV)
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 680
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 680
Book Description
B Plant Complex Preclosure Work Plan
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 125
Book Description
This preclosure work plan describes the condition of the dangerous waste treatment storage, and/or disposal (TSD) unit after completion of the B Plant Complex decommissioning Transition Phase preclosure activities. This description includes waste characteristics, waste types, locations, and associated hazards. The goal to be met by the Transition Phase preclosure activities is to place the TSD unit into a safe and environmentally secure condition for the long-term Surveillance and Maintenance (S & M) Phase of the facility decommissioning process. This preclosure work plan has been prepared in accordance with Section 8.0 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1996). The preclosure work plan is one of three critical Transition Phase documents, the other two being: B Plant End Points Document (WHC-SD-WM-TPP-054) and B Plant S & M plan. These documents are prepared by the U.S. Department of Energy, Richland Operations Office (DOE-RL) and its contractors with the involvement of Washington State Department of Ecology (Ecology). The tanks and vessels addressed by this preclosure work plan are limited to those tanks end vessels included on the B Plant Complex Part A, Form 3, Permit Application (DOE/RL-88-21). The criteria for determining which tanks or vessels are in the Part A, Form 3, are discussed in the following. The closure plan for the TSD unit will not be prepared until the Disposition Phase of the facility decommissioning process is initiated, which follows the long-term S & M Phase. Final closure will occur during the Disposition Phase of the facility decommissioning process. The Waste Encapsulation Storage Facility (WESF) is excluded from the scope of this preclosure work plan.
Publisher:
ISBN:
Category :
Languages : en
Pages : 125
Book Description
This preclosure work plan describes the condition of the dangerous waste treatment storage, and/or disposal (TSD) unit after completion of the B Plant Complex decommissioning Transition Phase preclosure activities. This description includes waste characteristics, waste types, locations, and associated hazards. The goal to be met by the Transition Phase preclosure activities is to place the TSD unit into a safe and environmentally secure condition for the long-term Surveillance and Maintenance (S & M) Phase of the facility decommissioning process. This preclosure work plan has been prepared in accordance with Section 8.0 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1996). The preclosure work plan is one of three critical Transition Phase documents, the other two being: B Plant End Points Document (WHC-SD-WM-TPP-054) and B Plant S & M plan. These documents are prepared by the U.S. Department of Energy, Richland Operations Office (DOE-RL) and its contractors with the involvement of Washington State Department of Ecology (Ecology). The tanks and vessels addressed by this preclosure work plan are limited to those tanks end vessels included on the B Plant Complex Part A, Form 3, Permit Application (DOE/RL-88-21). The criteria for determining which tanks or vessels are in the Part A, Form 3, are discussed in the following. The closure plan for the TSD unit will not be prepared until the Disposition Phase of the facility decommissioning process is initiated, which follows the long-term S & M Phase. Final closure will occur during the Disposition Phase of the facility decommissioning process. The Waste Encapsulation Storage Facility (WESF) is excluded from the scope of this preclosure work plan.
B Plant Complex Hazardous, Mixed and Low Level Waste Certification Plan
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 0
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 0
Book Description