Appended Field Sampling Plan for Task Order 1 for the RCRA Facility Investigation/Corrective Measures Study (RFl/CMS) and Base Closure Environmental Study for the Lexington-Blue Grass Army Depot

Appended Field Sampling Plan for Task Order 1 for the RCRA Facility Investigation/Corrective Measures Study (RFl/CMS) and Base Closure Environmental Study for the Lexington-Blue Grass Army Depot PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 41

Get Book Here

Book Description
Metcalf & Eddy, Inc. (M & E) under contract with the United States Army Toxic and Hazardous Materials Agency (USATHAMA), contract number DAAA15-90-D-0016 Task Order Number 4, has appended the Field Sampling Plan for the RFI/CMS for base closure at the Lexington-Blue Grass Army Depot, Kentucky. This appendix describes comments, addenda, corrections, and clarifications to Task Order 1, Field Sampling Plan, Lexington-Blue Grass Army Depot, Kentucky (USATHAMA, 1991), henceforth called the 'original document' USEPA review comments of July 31, 1991, on the original document were incorporated into this appendix unless the comment suggested work outside the contracted scope of work for Task Order 4. Work outside the contracted scope will be conducted at a later date, as deemed necessary by the COR.

Appended Field Sampling Plan for Task Order 1 for the RCRA Facility Investigation/Corrective Measures Study (RFl/CMS) and Base Closure Environmental Study for the Lexington-Blue Grass Army Depot

Appended Field Sampling Plan for Task Order 1 for the RCRA Facility Investigation/Corrective Measures Study (RFl/CMS) and Base Closure Environmental Study for the Lexington-Blue Grass Army Depot PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 41

Get Book Here

Book Description
Metcalf & Eddy, Inc. (M & E) under contract with the United States Army Toxic and Hazardous Materials Agency (USATHAMA), contract number DAAA15-90-D-0016 Task Order Number 4, has appended the Field Sampling Plan for the RFI/CMS for base closure at the Lexington-Blue Grass Army Depot, Kentucky. This appendix describes comments, addenda, corrections, and clarifications to Task Order 1, Field Sampling Plan, Lexington-Blue Grass Army Depot, Kentucky (USATHAMA, 1991), henceforth called the 'original document' USEPA review comments of July 31, 1991, on the original document were incorporated into this appendix unless the comment suggested work outside the contracted scope of work for Task Order 4. Work outside the contracted scope will be conducted at a later date, as deemed necessary by the COR.

Appended Technical Plan, Appended Field Sampling Plan, Appended Health and Safety Plan, Appended Quality Assurance Project Plan for the RCRA Facility Investigation/Corrective Measures Study (RFI/CMS) and Base Closure Environmental Study for the Lexington-Blue Grass Army Depot

Appended Technical Plan, Appended Field Sampling Plan, Appended Health and Safety Plan, Appended Quality Assurance Project Plan for the RCRA Facility Investigation/Corrective Measures Study (RFI/CMS) and Base Closure Environmental Study for the Lexington-Blue Grass Army Depot PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 56

Get Book Here

Book Description
Metcalf & Eddy, Inc. (M & E) under contract with- the United States Army Toxic and Hazardous Materials Agency (USATHAMA), contract number DAAAl5-9O-D-0016 Task Order Number 4, has appended the Technical Plan for the RFL/CMS for base closure at the Lexington-Blue Grass Army Depot, Kentucky. The appendix describes comments, addenda, corrections and clarifications to, Task Order 1, Technical Plan, Lexington-Blue Grass Army Depot, Kentucky (USATHAMA, 1991) henceforth called the 'original document' USEPA review comments of July 31, 1991, on the original document, have been incorporated into this appendix unless the comment suggested work outside the contracted scope of work for Task Order 4. Work outside the contracted scope will be conducted at a later date, as deemed necessary by the COR.

Appended Health and Safety Plan for Task Order 1 for the RCRA Facility Investigation/Corrective Measures Study (RFI/CMS) and Base Closure Environmental Study for the Lexington-Blue Grass Army Depot

Appended Health and Safety Plan for Task Order 1 for the RCRA Facility Investigation/Corrective Measures Study (RFI/CMS) and Base Closure Environmental Study for the Lexington-Blue Grass Army Depot PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 9

Get Book Here

Book Description
Metcalf & Eddy, Inc. (M & E), under contract to the United States Army Toxic and Hazardous Materials Agency (USATHAMA), contract number DAAA15-90-D-0016, Task Order number 4, has appended the plans prepared for the RFI/CMS base closure at Lexington-Blue Grass Army Depot, Kentucky. This document is one of these appendices -- the appendix to the Health and Safety Plan. The appended document Task Order 1, Health and Safety Plan Lexington-Blue Grass Army Depot, Kentucky (USATHAMA, 1991) is henceforth called the 'original document'. USEPA review comments of July 31, 1991, on the original document were incorporated into this appended document unless the comment requested work outside the Task Order #4 scope of work. Work outside the scope will be conducted at a later date, as deemed necessary by the COR.

Field Sampling Methods for Remedial Investigations

Field Sampling Methods for Remedial Investigations PDF Author: Mark Edward Byrnes
Publisher: CRC Press
ISBN: 1420059157
Category : Science
Languages : en
Pages : 348

Get Book Here

Book Description
Originally published in 1994, the first edition of Field Sampling Methods for Remedial Investigations soon became a premier resource in the field. ThePrinceton Groundwater course designated it as one of the top books on the market that address strategies for groundwater well installation, well completion, and groundwater sampling. This long-awai

Phase 1 RCRA Facility Investigation/corrective Measures Study Work Plan for Single-shell Tank Waste Management Areas

Phase 1 RCRA Facility Investigation/corrective Measures Study Work Plan for Single-shell Tank Waste Management Areas PDF Author: United States. Department of Energy. Richland Operations Office
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


Remedial Investigation Work Plan for Bear Creek Valley Operable Unit 2 (Rust Spoil Area, SY-200 Yard, Spoil Area 1) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

Remedial Investigation Work Plan for Bear Creek Valley Operable Unit 2 (Rust Spoil Area, SY-200 Yard, Spoil Area 1) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 393

Get Book Here

Book Description
The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste facilities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RFA)/RCRA Facility Investigation (RFI)/Corrective Measures Study (CMS)/Corrective Measures implementation process. Under CERCLA the actions follow the PA/SI/Remedial Investigation (RI)/Feasibility Study (FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCLA into an RI work plan for the characterization of Bear Creek Valley (BCV) Operable Unit (OU) 2.

RCRA Facility Investigation/corrective Measures Study Work Plan for the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington

RCRA Facility Investigation/corrective Measures Study Work Plan for the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


RCRA Facility Investigation/corrective Measures Study Work Plan for the 100-DR-1 Operable Unit, Hanford Site, Richland, Washington

RCRA Facility Investigation/corrective Measures Study Work Plan for the 100-DR-1 Operable Unit, Hanford Site, Richland, Washington PDF Author: United States. Department of Energy
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


Voprosy partiĭnogo stroitelʹstva

Voprosy partiĭnogo stroitelʹstva PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 253

Get Book Here

Book Description


Final Sampling and Analysis Plan

Final Sampling and Analysis Plan PDF Author: Malcolm Pirnie
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description