Air Force privatizationinplace analysis of aircraft and missile guidance system depot repair costs : report to congressional requesters

Air Force privatizationinplace analysis of aircraft and missile guidance system depot repair costs : report to congressional requesters PDF Author:
Publisher: DIANE Publishing
ISBN: 1428975225
Category :
Languages : en
Pages : 32

Get Book Here

Book Description

Air Force privatizationinplace analysis of aircraft and missile guidance system depot repair costs : report to congressional requesters

Air Force privatizationinplace analysis of aircraft and missile guidance system depot repair costs : report to congressional requesters PDF Author:
Publisher: DIANE Publishing
ISBN: 1428975225
Category :
Languages : en
Pages : 32

Get Book Here

Book Description


Air Force Privatization-in-place

Air Force Privatization-in-place PDF Author: United States. General Accounting Office
Publisher:
ISBN:
Category : Airplanes, Military
Languages : en
Pages : 32

Get Book Here

Book Description


Air Force Privatization-in-place

Air Force Privatization-in-place PDF Author: United States. General Accounting Office
Publisher:
ISBN:
Category : Airplanes, Military
Languages : en
Pages : 28

Get Book Here

Book Description


Air Force Privatization-in-place

Air Force Privatization-in-place PDF Author: United States. General Accounting Office. National Security and International Affairs Division
Publisher:
ISBN:
Category :
Languages : en
Pages : 30

Get Book Here

Book Description
AGMC was closed as a result of a 1993 decision of the Base Realignment and Closure (BRAC) Commission. In recommending the closure of the Newark Air Force Base/AGMC, the Commission noted that the workload could be privatized or moved to other depot maintenance activities. The BRAC recommendation states the Aerospace Guidance and Metrology center (AGMC) depot will be closed; some workload will move to other depot maintenance activities including the private sector. After the BRAC recommendation to close AGMC was finalized, (1) the Air Force moved a small portion of AGMC's Air Force workload to other Air Force depots, (2) the Navy moved most of its AGMC workload to other sites, and (3) the Army moved all of its AGMC workload to other sites. The Air Force decided to privatize in place the remaining AGMC workloads. At the time it made this decision, the Air Force relied on an analysis that estimated privatizing would save about $5 million in 1997. However, the preaward analysis was not documented and Air Force officials do not know the basis for the costs included. Consequently, the Air Force was not able to reconcile its current interim study to its precontract award analysis.

Air Force Privitization-in-Place: Analysis of Aircraft and Missile Guidance System Depot Repair Costs

Air Force Privitization-in-Place: Analysis of Aircraft and Missile Guidance System Depot Repair Costs PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 30

Get Book Here

Book Description
AGMC was closed as a result of a 1993 decision of the Base Realignment and Closure (BRAC) Commission. In recommending the closure of the Newark Air Force Base/AGMC, the Commission noted that the workload could be privatized or moved to other depot maintenance activities. The BRAC recommendation states The Aerospace Guidance and Metrology center (AGMC) depot will be closed; some workload will move to other depot maintenance activities including the private sector. After the BRAC recommendation to close AGMC was finalized, (1) the Air Force moved a small portion of AGMC's Air Force workload to other Air Force depots, (2) the Navy moved most of its AGMC workload to other sites, and (3) the Army moved all of its AGMC workload to other sites. The Air Force decided to privatize in place the remaining AGMC workloads. At the time it made this decision, the Air Force relied on an analysis that estimated privatizing would save about $5 million in 1997. However, the preaward analysis was not documented and Air Force officials do not know the basis for the costs included. Consequently, the Air Force was not able to reconcile its current interim study to its precontract award analysis.

Air Force Depot Maintenance

Air Force Depot Maintenance PDF Author: United States. General Accounting Office
Publisher:
ISBN:
Category : Military supplies
Languages : en
Pages : 48

Get Book Here

Book Description


Air Force Depot Maintenance

Air Force Depot Maintenance PDF Author: U S Government Accountability Office (G
Publisher: BiblioGov
ISBN: 9781289231477
Category :
Languages : en
Pages : 36

Get Book Here

Book Description
The U.S. Government Accountability Office (GAO) is an independent agency that works for Congress. The GAO watches over Congress, and investigates how the federal government spends taxpayers dollars. The Comptroller General of the United States is the leader of the GAO, and is appointed to a 15-year term by the U.S. President. The GAO wants to support Congress, while at the same time doing right by the citizens of the United States. They audit, investigate, perform analyses, issue legal decisions and report anything that the government is doing. This is one of their reports.

Weapons Production

Weapons Production PDF Author: United States. General Accounting Office
Publisher:
ISBN:
Category : Airplanes, Military
Languages : en
Pages : 16

Get Book Here

Book Description


Air Force Report

Air Force Report PDF Author: United States. Department of the Air Force
Publisher:
ISBN:
Category :
Languages : en
Pages : 170

Get Book Here

Book Description


Contingency Operations

Contingency Operations PDF Author: United States. General Accounting Office
Publisher:
ISBN:
Category : Security, International
Languages : en
Pages : 40

Get Book Here

Book Description