Advanced Turbine Systems Program Conceptual Design and Product Development. Task 3.0, Selection of Natural Gas-fired Advanced Turbine System

Advanced Turbine Systems Program Conceptual Design and Product Development. Task 3.0, Selection of Natural Gas-fired Advanced Turbine System PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


Advanced Turbine Systems Program -- Conceptual Design and Product Development. Final Report

Advanced Turbine Systems Program -- Conceptual Design and Product Development. Final Report PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 99

Get Book Here

Book Description
This Final Technical Report presents the accomplishments on Phase 2 of the Advanced Turbine Systems (ATS). The ATS is an advanced, natural gas fired gas turbine system that will represent a major advance on currently available industrial gas turbines in the size range of 1--20 MW. This report covers a market-driven development. The Market Survey reported in Section 5 identified the customer's performance needs. This market survey used analyses performed by Solar turbine Incorporated backed up by the analyses done by two consultants, Research Decision Consultants (RDC) and Onsite Energy Corporation (Onsite). This back-up was important because it is the belief of all parties that growth of the ATS will depend both on continued participation in Solar's traditional oil and gas market but to a major extent on a new market. This new market is distributed electrical power generation. Difficult decisions have had to be made to meet the different demands of the two markets. Available resources, reasonable development schedules, avoidance of schedule or technology failures, probable acceptance by the marketplace, plus product cost, performance and environmental friendliness are a few of the complex factors influencing the selection of the Gas Fired Advanced Turbine System described in Section 3. Section 4 entitled ''Conversion to Coal'' was a task which addresses the possibility of a future interruption to an economic supply of natural gas. System definition and analysis is covered in Section 6. Two major objectives were met by this work. The first was identification of those critical technologies that can support overall attainment of the program goals. Separate technology or component programs were begun to identify and parameterize these technologies and are described in Section 7. The second objective was to prepare parametric analyses to assess performance sensitivity to operating variables and to select design approaches to meet the overall program goals.

Advanced Turbine Systems Program Conceptual Design and Product Development. Quarterly Report, August 1993--November 1994

Advanced Turbine Systems Program Conceptual Design and Product Development. Quarterly Report, August 1993--November 1994 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 4

Get Book Here

Book Description
This report discusses a series of heat balance programs were developed and reviewed in a Westinghouse Engineering Department meeting. The cycle formats were reviewed and candidate conditions and components selected for additional investigations, for the selection of the Natural Gas-fired Advanced Turbines Systems (GFATS).

Advanced Turbine Systems Program Conceptual Design and Product Development Task 5 - Market Study of the Gas Fired ATS. Topical Report

Advanced Turbine Systems Program Conceptual Design and Product Development Task 5 - Market Study of the Gas Fired ATS. Topical Report PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


Advanced Turbine Systems Program Conceptual Design and Product Development

Advanced Turbine Systems Program Conceptual Design and Product Development PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 38

Get Book Here

Book Description
This Topical Report presents the results of Task 4 of the Westinghouse ATS Program. The purpose of Task 4 is to determine the technical development needs for conversion of the gas-fired ATS (GFATS). Two closely related, advanced, coal-based power plant technologies have been selected for consideration as the CFATS -- air-blown, coal gasification with hot gas cleaning incorporated into an Integrated Gasification Combined Cycle (IGCC), and the Second-Generation Pressurized Fluidized Bed Combustion (PFBC) combined cycle. These are described and their estimated performance and emissions in the CFATS are reported. A development program for the CFATS is described that focuses on major commercialization issues. These issues are in the areas of combustion, flow distribution, structural analysis, and materials selection.

Advanced Turbine Systems Program -- Conceptual Design and Product Development. Quarterly Report, August 1--October 31, 1995

Advanced Turbine Systems Program -- Conceptual Design and Product Development. Quarterly Report, August 1--October 31, 1995 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description
The objective of Phase 2 of the Advanced Turbine Systems (ATS) Program is to provide the conceptual design and product development plan for an ultra high efficiency, environmentally superior and cost competitive industrial gas turbine system to be commercialized by the year 2000. A secondary objective is to begin early development of technologies critical to the success of ATS. This quarterly report, addresses only Task 4, conversion of a gas turbine to a coal-fired gas turbine, which was completed during the quarter and the nine subtasks included in Task 8, design and test of critical components. These nine subtasks address six ATS technologies as follows: catalytic combustion; recuperator; autothermal fuel reformer; high temperature turbine disc; advanced control system (MMI); and ceramic materials.

Advanced Turbine Systems Program Conceptual Design and Product Development. Annual Report, August 1993--July 1994

Advanced Turbine Systems Program Conceptual Design and Product Development. Annual Report, August 1993--July 1994 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 35

Get Book Here

Book Description
The stated objective of the project was to analyze and evaluate different cycles for the natural gas-fired Advanced Turbine Systems (GFATS) in order to select one that would achieve all of the ATS Program goals. Detailed cycle performance, cost of electricity, and RAM analysis were carried out to provide information on the final selection of the GFATS cycle. To achieve the very challenging goals, innovative approaches and technological advances are required, especially in combustion, aerodynamic design, cooling design, mechanical design, leakage control, materials, and coating technologies.

Advanced Turbine Systems Program

Advanced Turbine Systems Program PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 19

Get Book Here

Book Description
Objective is to provide the conceptual design and product development plant for an ultra high efficiency, environmentally superior, and cost competitive industrial gas turbine system to be commercialized by the year 2000 (secondary objective is to begin early development of technologies critical to the success of ATS). This report addresses the remaining 7 of the 9 subtasks in Task 8, Design and Test of Critical Components: catalytic combustion, recuperator, high- temperature turbine disc, advanced control system, and ceramic materials.

Advanced Turbine Systems Program Conceptual Design and Product Development. Annual Report, August 1994--July 1995

Advanced Turbine Systems Program Conceptual Design and Product Development. Annual Report, August 1994--July 1995 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 63

Get Book Here

Book Description
This report summarizes the tasks completed under this project during the period from August 1, 1994 through July 31, 1994. The objective of the study is to provide the conceptual design and product development plan for an ultra high efficiency, environmentally superior and cost-competitive industrial gas turbine system to be commercialized by the year 2000. The tasks completed include a market study for the advanced turbine system; definition of an optimized recuperated gas turbine as the prime mover meeting the requirements of the market study and whose characteristics were, in turn, used for forecasting the total advanced turbine system (ATS) future demand; development of a program plan for bringing the ATS to a state of readiness for field test; and demonstration of the primary surface recuperator ability to provide the high thermal effectiveness and low pressure loss required to support the proposed ATS cycle.

Advanced Turbine Systems Program Conceptual Design and Product Development. Quarterly Report, August--October, 1994

Advanced Turbine Systems Program Conceptual Design and Product Development. Quarterly Report, August--October, 1994 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 26

Get Book Here

Book Description
The objective of Phase 2 of the Advanced Turbine Systems (ATS) Program is to provide the conceptual design and product development plan for an ultra-high efficiency, environmentally superior and cost competitive industrial gas turbine system to be commercialized by the year 2000. A secondary objective is to begin early development of technologies critical to the success of ATS. During this report period, the following tasks were completed: Market study; System definition and analysis; and Integrated program plans. Progress on Task 8, Design and Test of Critical Components, is also discussed. This particular task includes expanded materials and component research covering recuperators, combustion, autothermal fuel reformation, ceramics application and advanced gas turbine system controls.