White Oak Creek Embayment Time-critical CERCLA Removal Action Sediment-retention Structure

White Oak Creek Embayment Time-critical CERCLA Removal Action Sediment-retention Structure PDF Author: CDM Federal Programs Corporation
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description

White Oak Creek Embayment Time-critical CERCLA Removal Action Sediment-retention Structure

White Oak Creek Embayment Time-critical CERCLA Removal Action Sediment-retention Structure PDF Author: CDM Federal Programs Corporation
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


White Oak Creek Embayment Time-critical CERCLA Removal Action Sediment-retention Structure. Environmental Restoration Program

White Oak Creek Embayment Time-critical CERCLA Removal Action Sediment-retention Structure. Environmental Restoration Program PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 19

Get Book Here

Book Description
Over a 20-month period between September 1990 and April 1992, the Department of Energy (DOE), acting through Martin Marietta Energy Systems, Inc., managing contractor for the DOE Oak Ridge Field Office (DOE-OR), conducted a DOE-lead and DOE-funded time-critical removal action at the White Oak Creek Embayment (WOCE), pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The time-critical removal action specifically consisted of the design and construction of a sediment-retention structure across the mouth of WOCE to prevent off-site migration of sediments contaminated by cesium (137Cs) into the Clinch River. Construction of a sediment-retention structure was completed in mid-April 1992. The purpose of this report is to meet the substantive requirements of 40 CFR 300.165 describing à̀ complete report on the removal operation and the actions taken. ̀̀This section of the NCP specifically addresses on-scene coordinator reports for the Environmental Protection Agency (EPA) Superfund-lead actions and includes several elements that are not applicable to this DOE-lead action. Only those sections that are pertinent and applicable are addressed in this final report.

White Oak Creek Embayment Sediment Retention Structure Design and Construction

White Oak Creek Embayment Sediment Retention Structure Design and Construction PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 5

Get Book Here

Book Description
White Oak Creek is the major surface water drainage throughout the Department of Energy (DOE) Oak Ridge National Laboratory (ORNL). Samples taken from the lower portion of the creek revealed high levels of Cesium 137 and lower level of Cobalt 60 in near surface sediment. Other contaminants present in the sediment included: lead, mercury, chromium, and PCBs. In October 1990, DOE, US Environmental Protection Agency (EPA), and Tennessee Department of Environment and Conservation (TDEC) agreed to initiate a time critical removal action in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) to prevent the transport of the contaminated sediments into the Clinch River system. This paper discusses the environmental, regulatory, design, and construction issues that were encountered in conducting the remediation work.

Water Quality Monitoring Report for the White Oak Creek Embayment. Environmental Restoration Program

Water Quality Monitoring Report for the White Oak Creek Embayment. Environmental Restoration Program PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 178

Get Book Here

Book Description
Water quality monitoring activities that focused on the detection of resuspended sediments in the Clinch River were conducted in conjunction with the White Oak Creek Embayment (WOCE) time-critical Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) removal action to construct a sediment-retention structure at the mouth of White Oak Creek (WOC). Samples were collected by use of a 24-h composite sampler and through real-time water grab sampling of sediment plumes generated by the construction activities. Sampling stations were established both at the WOC mouth, immediately adjacent to the construction site, and at K-1513, the Oak Ridge K-25 Site drinking water intake approximately 9.6 km downstream in the Clinch River. Results are described.

White Oak Creek Embayment Sediment Retention Structure Design and

White Oak Creek Embayment Sediment Retention Structure Design and PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


Department of Defense Authorization for Appropriations for Fiscal Years 1992 and 1993: Strategic forces and nuclear deterrence

Department of Defense Authorization for Appropriations for Fiscal Years 1992 and 1993: Strategic forces and nuclear deterrence PDF Author: United States. Congress. Senate. Committee on Armed Services
Publisher:
ISBN:
Category : Government publications
Languages : en
Pages : 956

Get Book Here

Book Description


Energy Research Abstracts

Energy Research Abstracts PDF Author:
Publisher:
ISBN:
Category : Power resources
Languages : en
Pages : 420

Get Book Here

Book Description


Federal Register

Federal Register PDF Author:
Publisher:
ISBN:
Category : Administrative law
Languages : en
Pages : 1272

Get Book Here

Book Description


Government Reports Announcements & Index

Government Reports Announcements & Index PDF Author:
Publisher:
ISBN:
Category : Science
Languages : en
Pages : 1360

Get Book Here

Book Description


Proceedings of the International Topical Meeting on Nuclear and Hazardous Waste Management--Spectrum '94

Proceedings of the International Topical Meeting on Nuclear and Hazardous Waste Management--Spectrum '94 PDF Author:
Publisher:
ISBN:
Category : Hazardous wastes
Languages : en
Pages : 868

Get Book Here

Book Description