Upper Mississippi River, Nine-foot Channel Navigation Project, Rehabilitation Project, General Design Memorandum, Pools 11 and 15

Upper Mississippi River, Nine-foot Channel Navigation Project, Rehabilitation Project, General Design Memorandum, Pools 11 and 15 PDF Author: United States. Army. Corps of Engineers. Rock Island District
Publisher:
ISBN:
Category : Flood control
Languages : en
Pages :

Get Book Here

Book Description

Upper Mississippi River, Nine-foot Channel Navigation Project, Rehabilitation Project, General Design Memorandum, Pools 11 and 15

Upper Mississippi River, Nine-foot Channel Navigation Project, Rehabilitation Project, General Design Memorandum, Pools 11 and 15 PDF Author: United States. Army. Corps of Engineers. Rock Island District
Publisher:
ISBN:
Category : Flood control
Languages : en
Pages :

Get Book Here

Book Description


Revision of Master Plan for Resource Management

Revision of Master Plan for Resource Management PDF Author:
Publisher:
ISBN:
Category : Mississippi River
Languages : en
Pages : 76

Get Book Here

Book Description


The Upper Mississippi River Navigation Improvement Providing a 9 Ft. Channel Depth Between Minneapolis and the Missouri River

The Upper Mississippi River Navigation Improvement Providing a 9 Ft. Channel Depth Between Minneapolis and the Missouri River PDF Author: United States. Army. Corps of Engineers
Publisher:
ISBN:
Category : Mississippi River
Languages : en
Pages : 30

Get Book Here

Book Description


9-foot Navigation Channel Project, Channel Maintenance Management Plan, Upper Mississippi River, Head of Navigation to Guttenburg

9-foot Navigation Channel Project, Channel Maintenance Management Plan, Upper Mississippi River, Head of Navigation to Guttenburg PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 398

Get Book Here

Book Description


Implementation for GREAT I Study

Implementation for GREAT I Study PDF Author: United States. Army. Corps of Engineers. St. Paul District
Publisher:
ISBN:
Category : Dredging
Languages : en
Pages : 388

Get Book Here

Book Description


Upper Mississippi River 9-foot Navigation Channel, Operations and Maintenance, Pool 15

Upper Mississippi River 9-foot Navigation Channel, Operations and Maintenance, Pool 15 PDF Author: United States. Army. Corps of Engineers. Rock Island District
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages :

Get Book Here

Book Description


Operations and Maintenance, Upper Mississippi River 9-foot Navigation Channel, Pools 11 Through 22, Iowa and Missouri

Operations and Maintenance, Upper Mississippi River 9-foot Navigation Channel, Pools 11 Through 22, Iowa and Missouri PDF Author: United States. Army. Corps of Engineers. Rock Island District
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages :

Get Book Here

Book Description


Project Design Memorandum No. 5-3, Navigation Channel and Appurtances

Project Design Memorandum No. 5-3, Navigation Channel and Appurtances PDF Author:
Publisher:
ISBN:
Category : Channels (Hydraulic engineering)
Languages : en
Pages : 176

Get Book Here

Book Description


Great Implementation, 9-foot Channel Project, Upper Mississippi River

Great Implementation, 9-foot Channel Project, Upper Mississippi River PDF Author: United States. Army. Corps of Engineers. St. Paul District
Publisher:
ISBN:
Category : Channels (Hydraulic engineering)
Languages : en
Pages :

Get Book Here

Book Description


Design Analysis Report for Lower Pool 5 Channel Maintenance/Weaver Bottoms Rehabilitation Plan on the Upper Mississippi River

Design Analysis Report for Lower Pool 5 Channel Maintenance/Weaver Bottoms Rehabilitation Plan on the Upper Mississippi River PDF Author: CORPS OF ENGINEERS ST PAUL MN ST PAUL DISTRICT.
Publisher:
ISBN:
Category :
Languages : en
Pages : 207

Get Book Here

Book Description
The 9-foot navigation channel on the Upper Mississippi River was authorized by the Rivers and Harbors Act of July 3, 1930, and other legislation. The great River Environmental Action Team (GREAT) I study was organized in 1973 to identify and assess the problems associated with multipurpose use of the Mississippi River. One of the main products of the GREAT I study was a 40-year channel maintenance plan for the river. The project discussed in this supplement would implement the general channel maintenance plan for lower pool 5 on the Upper Mississippi River, including the rehabilitation of the 4,000-acre backwater lake, Weaver Bottoms. The primary objectives of the project are to develop a 40-year channel maintenance plan for lower pool 5, reduce maintenance dredging requirements in lower pool 5, and restore the habitat quality to the Weaver Bottoms area, by modifying side channels and constructing islands with maintenance-dredged material.