Author:
Publisher:
ISBN:
Category : Dredging
Languages : en
Pages : 184
Book Description
Unconfined Open-water Disposal Sites for Dredged Material, Phase I (Central Puget Sound), Puget Sound Dredged Disposal Analysis: Management plan report
Author:
Publisher:
ISBN:
Category : Dredging
Languages : en
Pages : 184
Book Description
Publisher:
ISBN:
Category : Dredging
Languages : en
Pages : 184
Book Description
Puget Sound Dredged Disposal Analysis (PSDDA). Management Plan Report (MPR), Unconfined, Open-Water Disposal of Dredged Material. Phase 1 (Central Puget Sound).
Author: CORPS OF ENGINEERS SEATTLE WA SEATTLE DISTRICT.
Publisher:
ISBN:
Category :
Languages : en
Pages : 162
Book Description
This final environmental impact statement evaluates alternatives considered in identifying preferred sites for disposal of dredged material in Central Puget Sound. Three public multiuser disposal sites (Commencement Bay, Elliott Bay, and Port Gardner) are identified for use based on a site selection process which considered several alternative sites. Alternative biological effects conditions for site management have been considered and a site condition identified for purpose of dredged material at the Phase I sites. Keywords: Dredged materials; Dredging; Open-water disposal; Puget Sound. (edc).
Publisher:
ISBN:
Category :
Languages : en
Pages : 162
Book Description
This final environmental impact statement evaluates alternatives considered in identifying preferred sites for disposal of dredged material in Central Puget Sound. Three public multiuser disposal sites (Commencement Bay, Elliott Bay, and Port Gardner) are identified for use based on a site selection process which considered several alternative sites. Alternative biological effects conditions for site management have been considered and a site condition identified for purpose of dredged material at the Phase I sites. Keywords: Dredged materials; Dredging; Open-water disposal; Puget Sound. (edc).
Unconfined Open-water Disposal Sites for Dredged Material, Phase I (Central Puget Sound), Puget Sound Dredged Disposal Analysis: Management plans technical appendix
Author:
Publisher:
ISBN:
Category : Dredging
Languages : en
Pages : 264
Book Description
Publisher:
ISBN:
Category : Dredging
Languages : en
Pages : 264
Book Description
Puget Sound Dredged Disposal, Management Plan for Unconfined Open-water Disposal (phase I, Central Puget Sound)
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 684
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 684
Book Description
Unconfined, Open-water Disposal Sites for Dredged Material, Phase II (North and South Puget Sound), Puget Sound Dredged Disposal Analysis: Draft management plan report
Author:
Publisher:
ISBN:
Category : Dredging
Languages : en
Pages : 246
Book Description
Publisher:
ISBN:
Category : Dredging
Languages : en
Pages : 246
Book Description
Disposal Site Selection Technical Appendix
Author: United States. Army. Corps of Engineers. Seattle District
Publisher:
ISBN:
Category : Dredging spoil
Languages : en
Pages :
Book Description
This document is a technical appendix to the Puget Sound Dredged Disposal Analysis (PSDDA) Management Plan Report and Final Environmental Impact Statement for the Phase I study area (central Puget Sound). The appendix was prepared by the Disposal Site Work Group (DSWG), assigned the responsibility for identifying potential unconfined, open-water dredged material disposal sites. Part I of the Disposal Site Selection Technical Appendix contains introductory and conceptual information for the remaining parts of the document. Part II contains the detailed presentation of the site selection process employed by DSWG. Keywords: Dredging; Dredged materials disposal; Puget sound; Open water disposal; Biological effects. (EDC).
Publisher:
ISBN:
Category : Dredging spoil
Languages : en
Pages :
Book Description
This document is a technical appendix to the Puget Sound Dredged Disposal Analysis (PSDDA) Management Plan Report and Final Environmental Impact Statement for the Phase I study area (central Puget Sound). The appendix was prepared by the Disposal Site Work Group (DSWG), assigned the responsibility for identifying potential unconfined, open-water dredged material disposal sites. Part I of the Disposal Site Selection Technical Appendix contains introductory and conceptual information for the remaining parts of the document. Part II contains the detailed presentation of the site selection process employed by DSWG. Keywords: Dredging; Dredged materials disposal; Puget sound; Open water disposal; Biological effects. (EDC).
Unconfined Open Water Disposal for Dredged Material, Phase II (north and South Puget Sound)
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 236
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 236
Book Description
Management Plans Technical Appendix
Author:
Publisher:
ISBN:
Category : Dredging spoil
Languages : en
Pages : 268
Book Description
Publisher:
ISBN:
Category : Dredging spoil
Languages : en
Pages : 268
Book Description
Unconfined Open-water Disposal Sites for Dredged Material, Phase I (Central Puget Sound), Puget Sound Dredged Disposal Analysis: Disposal site selection technical appendix
Author:
Publisher:
ISBN:
Category : Dredging
Languages : en
Pages : 382
Book Description
Publisher:
ISBN:
Category : Dredging
Languages : en
Pages : 382
Book Description
Unconfined Open-water Disposal Sites for Dredged Material, Phase I (Central Puget Sound), Puget Sound Dredged Disposal Analysis: Evaluation procedures technical appendix
Author:
Publisher:
ISBN:
Category : Dredging
Languages : en
Pages : 506
Book Description
Publisher:
ISBN:
Category : Dredging
Languages : en
Pages : 506
Book Description