Ten West Link 500kV Transmission Line Project Draft Environmental Impact Statement and Draft Resource Management Plan Amendments

Ten West Link 500kV Transmission Line Project Draft Environmental Impact Statement and Draft Resource Management Plan Amendments PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


Ten West Link Transmission Line Project

Ten West Link Transmission Line Project PDF Author: United States. Bureau of Land Management
Publisher:
ISBN:
Category : Electric lines
Languages : en
Pages :

Get Book Here

Book Description
Evaluates the anticipated environmental effects of the construction, operation, maintenance, and decommissioning of the Ten West Link Transmission Line Project (Project) proposed by DCR Transmission, LLC. The proposed Project includes construction of a 500-kilovolt electric transmission line and associated infrastructure, from the Delaney Substation near Tonopah, Arizona, to the Colorado River Substation near Blythe, California...The Proposed Action is 114.3 miles long and generally follows the existing Devers to Palo Verde transmission line, including a 24.9-mile long crossing of the Kofa National Wildlife Refuge (NWR). The Agency Preferred Alternative is 125.0 miles long, utilizes BLM utility corridors, and does not cross the Kofa NWR.

Ten West Link Transmission Line Project Final Environmental Impact Statement and Proposed Resource Management Plan Amendments

Ten West Link Transmission Line Project Final Environmental Impact Statement and Proposed Resource Management Plan Amendments PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


Federal Register

Federal Register PDF Author:
Publisher:
ISBN:
Category : Delegated legislation
Languages : en
Pages : 368

Get Book Here

Book Description


Gateway West Transmission Line Project [draft Supplemental] Environmental Impact Statement

Gateway West Transmission Line Project [draft Supplemental] Environmental Impact Statement PDF Author:
Publisher:
ISBN:
Category : Electric power transmission
Languages : en
Pages :

Get Book Here

Book Description
On May 7, 2007, Idaho Power Company and PacifiCorp (doing business as Rocky Mountain Power), collectively known as the Proponents, applied to the Bureau of Land Management (BLM) for a right-of-way (ROW) grant to use the National System of Public Lands for portions of the Gateway West Transmission Line Project (Gateway West or Project). The original application was revised in October 2007, August 2008, May 2009, and January 2010 to reflect changes and refinements in their proposed Project and in response to feedback from the public regarding routing alternatives. The Plan of Development (POD) has been revised several times in response to Project changes and recommendations from the BLM, other reviewing agencies, and public comment. This supplemental environmental impact statement (SEIS) evaluates the revised proposed action for Segments 8 and 9 as stated in the application including environmental protection measures. It also examines the environmental impacts of four other route alignments and two route variations. The BLM has identified seven action alternatives, two of which have been selected as Co-Preferred Alternatives by the BLM. Granting of the ROW for the Revised Proposed Routes or other route alignments would require amendments to BLM Resource Management Plans and BLM Management Framework Plans. Proposed amendments have been identified. Significant impacts were identified from construction and operations of the transmission line on historical resources (historic trails), visual quality, and cumulative impacts on several resources based on past and present levels of disturbance. A framework for compensatory mitigation has been added. The comment period on the Draft SEIS will close 90 days from the date of publication of the U.S. Environmental Protection Agency’s Notice of Availability in the Federal Register.

Proposed Southline Transmission Line Project

Proposed Southline Transmission Line Project PDF Author: United States. Bureau of Land Management
Publisher:
ISBN:
Category : Environmental impact statements
Languages : en
Pages :

Get Book Here

Book Description


Mead-Phoenix 500kV DC Transmisssion Line Project (NV,AZ)

Mead-Phoenix 500kV DC Transmisssion Line Project (NV,AZ) PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 132

Get Book Here

Book Description


Final Supplemental Environmental Impact Statement and Proposed Land Use Plan Amendments for Segments 8 and 9 of the Gateway West 500-kV Transmission Line Project, Idaho

Final Supplemental Environmental Impact Statement and Proposed Land Use Plan Amendments for Segments 8 and 9 of the Gateway West 500-kV Transmission Line Project, Idaho PDF Author:
Publisher:
ISBN:
Category : Electric power transmission
Languages : en
Pages : 202

Get Book Here

Book Description
On May 7, 2007, Idaho Power Company and PacifiCorp (doing business as Rocky Mountain Power), collectively known as the Proponents, applied to the Bureau of Land Management (BLM) for a right-of-way (ROW) grant to use the National System of Public Lands for portions of the Gateway West Transmission Line Project (Gateway West or Project). The original application was revised in October 2007, August 2008, May 2009, January 2010, and August 2014 to reflect changes and refinements in their proposed Project and in response to feedback from the public regarding routing alternatives. The Plan of Development (POD) has been revised several times in response to Project changes and recommendations from the BLM, other reviewing agencies, and public comment. This supplemental environmental impact statement (SEIS) evaluates the revised proposed action for Segments 8 and 9 as stated in the application including environmental protection measures. It also examines the environmental impacts of four other route alignments and four variations. Significant impacts were identified from construction and operations of the transmission line on historical resources (historic trails), visual quality, and cumulative impacts on several resources based on past and present levels of disturbance. A framework for compensatory mitigation has been developed.

Final Management Framework Plan Amendment/environmental Impact Statement on the El Paso Electric 345 KV Springerville to Deming Transmission Line

Final Management Framework Plan Amendment/environmental Impact Statement on the El Paso Electric 345 KV Springerville to Deming Transmission Line PDF Author: United States. Bureau of Land Management
Publisher:
ISBN:
Category : Electric lines
Languages : en
Pages : 148

Get Book Here

Book Description


Grand Coulee-Bell 500-kV Transmission Line Project

Grand Coulee-Bell 500-kV Transmission Line Project PDF Author:
Publisher:
ISBN:
Category : Electric lines
Languages : en
Pages : 530

Get Book Here

Book Description