Strategy for Meeting the Secretary of Energy and Hanford Site FY 2001 Pollution Prevention Goals

Strategy for Meeting the Secretary of Energy and Hanford Site FY 2001 Pollution Prevention Goals PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 13

Get Book Here

Book Description
The purpose of this strategy is to identify the Fiscal Year (FY) 2001 Hanford Site waste reduction, sanitary recycling and affirmative procurement goals and identify the action required to ensure that the Secretary of Energy's FY 2005 pollution prevention and the FY 2001 Hanford Site goals are met. The strategy and plan to ensure that the Secretary of Energy's routine waste reduction, recycling, cleanup/stabilization waste and affirmative procurement goals are met consists of four phases. The first phase is to ensure that the infrastructure is in place to support planning and organization. This phase involves ensuring that roles and responsibilities are identified; requirement documents are current; goals and successes are communicated; and accurate and current waste information is available. Roles and responsibilities are identified and the RL requirement documents (i.e., the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan and Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation) will specify the Secretary of Energy's goals. Goals will be communicated formally and informally via the Hanford Reach, training sessions, meetings and correspondence. Sharing of pollution prevention successes and goal progress are encouraged at the Pollution Prevention/Waste Minimization (PZ/WMin) quarterly meetings. Existing site waste generation databases will be utilized to provide current waste generation data. The second phase of the strategy and plan is to establish and allocate goals by prime contractor (i.e. Fluor Hanford, Inc. (FH), Pacific Northwest National Laboratory (PNNL), Bechtel Hanford Inc. (BHI), and CH2MHill Hanford Group (CHG)). This requires determining current status toward meeting the Secretary of Energy's goals; establishing the Hanford Site FY goals, and allocating waste reduction goals by prime contractor. The third phase of the strategy and plan is goal implementation. This phase involves the identification and implementation of corrective actions for problem areas identified either during the development of the Hanford Site goals or during monthly monitoring of the goals. Areas of concern identified during the development of the goals were the Mixed Low Level Waste (MLLW), Hazardous, and cleanup waste goal. The fourth phase of the strategy and plan is measuring results. This phase consists of: Measuring Results; Development of performance measures; and Reporting progress quarterly. The performance measures have been developed for the tracking of the waste reduction, sanitary recycling, affirmative procurement, and toxic chemical release goals. The first quarter performance measures tracking the recommended goals will be issued by January 3 I, 2001.

Strategy for Meeting the Secretary of Energy and Hanford Site FY 2001 Pollution Prevention Goals

Strategy for Meeting the Secretary of Energy and Hanford Site FY 2001 Pollution Prevention Goals PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 13

Get Book Here

Book Description
The purpose of this strategy is to identify the Fiscal Year (FY) 2001 Hanford Site waste reduction, sanitary recycling and affirmative procurement goals and identify the action required to ensure that the Secretary of Energy's FY 2005 pollution prevention and the FY 2001 Hanford Site goals are met. The strategy and plan to ensure that the Secretary of Energy's routine waste reduction, recycling, cleanup/stabilization waste and affirmative procurement goals are met consists of four phases. The first phase is to ensure that the infrastructure is in place to support planning and organization. This phase involves ensuring that roles and responsibilities are identified; requirement documents are current; goals and successes are communicated; and accurate and current waste information is available. Roles and responsibilities are identified and the RL requirement documents (i.e., the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan and Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation) will specify the Secretary of Energy's goals. Goals will be communicated formally and informally via the Hanford Reach, training sessions, meetings and correspondence. Sharing of pollution prevention successes and goal progress are encouraged at the Pollution Prevention/Waste Minimization (PZ/WMin) quarterly meetings. Existing site waste generation databases will be utilized to provide current waste generation data. The second phase of the strategy and plan is to establish and allocate goals by prime contractor (i.e. Fluor Hanford, Inc. (FH), Pacific Northwest National Laboratory (PNNL), Bechtel Hanford Inc. (BHI), and CH2MHill Hanford Group (CHG)). This requires determining current status toward meeting the Secretary of Energy's goals; establishing the Hanford Site FY goals, and allocating waste reduction goals by prime contractor. The third phase of the strategy and plan is goal implementation. This phase involves the identification and implementation of corrective actions for problem areas identified either during the development of the Hanford Site goals or during monthly monitoring of the goals. Areas of concern identified during the development of the goals were the Mixed Low Level Waste (MLLW), Hazardous, and cleanup waste goal. The fourth phase of the strategy and plan is measuring results. This phase consists of: Measuring Results; Development of performance measures; and Reporting progress quarterly. The performance measures have been developed for the tracking of the waste reduction, sanitary recycling, affirmative procurement, and toxic chemical release goals. The first quarter performance measures tracking the recommended goals will be issued by January 3 I, 2001.

Arbeitslose in Hagen

Arbeitslose in Hagen PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 14

Get Book Here

Book Description


Hanford Site Pollution Prevention Plan Progress Report, 1993

Hanford Site Pollution Prevention Plan Progress Report, 1993 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 132

Get Book Here

Book Description
This report tracks progress against the goals stated in the Hanford Site 5-year Pollution Prevention Plan. The executive summary of the plan was submitted to the Washington State Department of Ecology (Ecology) in September 1992. The plan, executive summary, and the progress reports are elements of a pollution prevention planning program that is required by Washington Administrative Code (WAC) 173-307 for all hazardous substance users and/or all hazardous waste generators regulated by Ecology. These regulations implement Chapter 70.95C, Revised Code of Washington, an act relating to hazardous waste reduction. The act encourages voluntary efforts to redesign industrial processes to help reduce or eliminate hazardous substances and hazardous waste byproducts, and to maximize the inprocess reuse or reclamation of valuable spent material. Although the Hanford Site is exempt, it is voluntarily complying with this state regulatory-mandated program. This is the first year the Hanford Site is submitting a progress report. It covers calendar year 1993 plus the last quarter of 1992. What is reported, in accordance with WAC 173-307, are reductions in hazardous substance use and hazardous waste generated. A system of Process Waste Assessments (PWA) was chosen to meet the requirements of the program. The PWAs were organized by a physical facility or company organization. Each waste-generating facility/organization performed PWAs to identify, screen, and analyze their own reduction options. Each completed PWA identified any number of reduction opportunities, that are listed individually in the plan and summarized by category in the executive summary. These opportunities were to be implemented or evaluated further over the duration of the 5-year plan. The basis of this progress report is to track action taken on these PWA reduction opportunities in relationship to achieving the goals stated in the Pollution Prevention Plan.

Zeitschriftenverzeichnis

Zeitschriftenverzeichnis PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 576

Get Book Here

Book Description


Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan. Revision 1

Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan. Revision 1 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 63

Get Book Here

Book Description
The Hanford Site WMin/P2 program is an organized, comprehensive, and continual effort to systematically reduce the quantity and toxicity of hazardous, radioactive, mixed, and sanitary wastes; conserve resources; and prevent or minimize pollutant releases to all environmental media from all Site activities. The Hanford Site WMin/P2 program plan reflects national and DOE waste minimization and pollution prevention goals and policies, and represents an ongoing effort to make WMin/P2 part of the Site operating philosophy. In accordance with these policies, a hierarchical approach to environmental management has been adopted and is applied to all types of polluting and waste generating activities. Pollution prevention and waste minimization through source reduction are first priority in the Hanford WMin/P2 program, followed by environmentally safe recycling. Treatment to reduce the quantity, toxicity, and/or mobility will be considered only when prevention or recycling are not possible or practical. Environmentally safe disposal is the last option.

Energy and Water Development Appropriations for 2001: Department of Energy fiscal year 2001 budget justifications

Energy and Water Development Appropriations for 2001: Department of Energy fiscal year 2001 budget justifications PDF Author: United States. Congress. House. Committee on Appropriations. Subcommittee on Energy and Water Development
Publisher:
ISBN:
Category : Energy development
Languages : en
Pages : 3160

Get Book Here

Book Description


Hanford Site Pollution Prevention Plan Progress Report, 1994. Revision 1

Hanford Site Pollution Prevention Plan Progress Report, 1994. Revision 1 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 150

Get Book Here

Book Description
This report tracks progress made during 1994 against the goals stated in DOE/RL-92-62, Executive Summary, Hanford Site Pollution Prevention Plan. The Executive Summary of the plan was submitted to the Washington State Department of Ecology (Ecology) in September 1992. The plan, Executive Summary, and the progress reports are elements of a pollution prevention planning program that is required by WAC 173-307, ''Plans, '' for all hazardous substance users and/or all hazardous waste generators regulated by Ecology. These regulations implement RCW 70.95C, ''Waste Reduction, '' an act relating to hazardous waste reduction. The act encourages voluntary efforts to redesign industrial processes to help reduce or eliminate hazardous substances and hazardous waste byproducts, and to maximize the in-process reuse or reclamation of valuable spent material. The Hanford Site is voluntarily complying with this state regulatory-mandated program. All treatment, storage, or disposal (TSD) facilities are exempt from participating; the Hanford Site is classified as a TSD.

B Plant Complex Pollution Prevention Plan. Revision 1

B Plant Complex Pollution Prevention Plan. Revision 1 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 53

Get Book Here

Book Description
The US Department of Energy (DOE) has directed Westinghouse Hanford Company (WHC) to develop an effective strategy to minimize the generation of hazardous, radioactive, and mixed wastes at Hanford in compliance with state and federal regulations. WHC has formalized a pollution prevention program composed of management policies, management requirements and procedures. This plan addresses pollution prevention for B Plant Complex. A pollution prevention team is in place and has been assigned responsibility for implementing the plan. This plan includes actions and goals for reducing volume and toxicity of waste generated, as well as a basis for evaluation of progress. Descriptions of waste streams, current specific goals, general pollution prevention methods, and specific accomplishments are in the appendices of this plan.

Energy and Water Development Appropriations for 2001

Energy and Water Development Appropriations for 2001 PDF Author: United States. Congress. House. Committee on Appropriations. Subcommittee on Energy and Water Development
Publisher:
ISBN:
Category : Energy development
Languages : en
Pages : 3154

Get Book Here

Book Description


Strategy and Methodology for Radioactive Waste Characterization

Strategy and Methodology for Radioactive Waste Characterization PDF Author: International Atomic Energy Agency
Publisher: IAEA
ISBN:
Category : Business & Economics
Languages : en
Pages : 188

Get Book Here

Book Description
Over the past decade significant progress has been achieved in the development of waste characterization and control procedures and equipment as a direct response to ever-increasing requirements for quality and reliability of information on waste characteristics. Failure in control procedures at any step can have important, adverse consequences and may result in producing waste packages which are not compliant with the waste acceptance criteria for disposal, thereby adversely impacting the repository. The information and guidance included in this publication corresponds to recent achievements and reflects the optimum approaches, thereby reducing the potential for error and enhancing the quality of the end product. -- Publisher's description.