Status Report of Environmental Evaluations Trinity River Project Texas. Appendix B. Biological Inventory with Effect Evaluation

Status Report of Environmental Evaluations Trinity River Project Texas. Appendix B. Biological Inventory with Effect Evaluation PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 537

Get Book Here

Book Description
Three volume status report of environmental evaluation of Trinity River Project. This includes: (1) supply, navigation, fish and wildlife programs, hydroelectric power and the Multiple-purpose Channel; (2) National Economic Development Plan that is similar to the Authorized Project Plan, but has many features that delete adverse effects to natural resources to reduce cost; (3) Environmental Quality Plan that is nonstructural multiple-purpose plan of no action in regard to navigation and hydroelectric power for the Corps of Engineers. It proposes land use regulations for the entire Trinity River flood plain and proposes water conservation in lieu of added development for increasing the water supply; (4) NO Action Plan; (5) Authorized Project Plan Without Navigation that includes flood control, reservoir regulation channel, strengthen existing agricultural levees, and enlarge Tennessee Colony Lake. This plan reduces some of the adverse effects on natural resources; (6) Authorized Project Plan Without Navigation, Provisions for Future Navigation. This is the same as the previous plan except providing for navigation in the initial stages of design and construction; and (7) Authorized Project Plan, Navigation Terminated Downstream from Dallas. Similar to Authorized Project Plan except for the flood control channel. Tax and bond issues were rejected by voters. Congress directed Corps of Engineers to cease further planning for fiscal year 1974 and 1975.

Status Report of Environmental Evaluations Trinity River Project Texas. Appendix B. Biological Inventory with Effect Evaluation

Status Report of Environmental Evaluations Trinity River Project Texas. Appendix B. Biological Inventory with Effect Evaluation PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 537

Get Book Here

Book Description
Three volume status report of environmental evaluation of Trinity River Project. This includes: (1) supply, navigation, fish and wildlife programs, hydroelectric power and the Multiple-purpose Channel; (2) National Economic Development Plan that is similar to the Authorized Project Plan, but has many features that delete adverse effects to natural resources to reduce cost; (3) Environmental Quality Plan that is nonstructural multiple-purpose plan of no action in regard to navigation and hydroelectric power for the Corps of Engineers. It proposes land use regulations for the entire Trinity River flood plain and proposes water conservation in lieu of added development for increasing the water supply; (4) NO Action Plan; (5) Authorized Project Plan Without Navigation that includes flood control, reservoir regulation channel, strengthen existing agricultural levees, and enlarge Tennessee Colony Lake. This plan reduces some of the adverse effects on natural resources; (6) Authorized Project Plan Without Navigation, Provisions for Future Navigation. This is the same as the previous plan except providing for navigation in the initial stages of design and construction; and (7) Authorized Project Plan, Navigation Terminated Downstream from Dallas. Similar to Authorized Project Plan except for the flood control channel. Tax and bond issues were rejected by voters. Congress directed Corps of Engineers to cease further planning for fiscal year 1974 and 1975.

Appendix B: Biological inventory with effect evaluation

Appendix B: Biological inventory with effect evaluation PDF Author: Trinity River Project, Tex
Publisher:
ISBN:
Category : Trinity River (Tex.)
Languages : en
Pages :

Get Book Here

Book Description


Status Report of Environmental Evaluations, Trinity River Project, Texas. Appendix A. Plates and Photographs

Status Report of Environmental Evaluations, Trinity River Project, Texas. Appendix A. Plates and Photographs PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 148

Get Book Here

Book Description
Three volume status report of environmental evaluation of Trinity River Project. This includes: (1) Authorized Project Plan that provides for flood control, recreation, water supply, navigation fish and wildlife program, hydroelectric power and the Multiple-purpose Channel; (2) National Economic Development Plan that is similar to the Authorized Project Plan, but has many features that delete adverse effects to natural resources to reduce cost; (3) Environmental Quality Plan that is a nonstructural multiple-purpose plan of no action in regard to navigation and hydroelectric power for the Corps of Engineers. It proposes land use regulations for the entire Trinity River flood plain and proposes water conservation in lieu of added development for increasing the water supply; (4) No Action Plan; (5) Authorized Project Plan Without Navigation that includes flood control, reservoir regulation channel, strengthen existing agricultural levees, and enlarge Tennessee Colony Lake. This plan reduces some of the adverse effects on natural resources; (6) Authorized Project Plan Without Navigation, Provisions for Future Navigation. This is the same as the previous plan except providing for navigation in the initial stages of design and construction; and (7) Authorized Project Plan, Navigation Terminated Downstream from Dallas. Similar to Authorized Project Plan except for the flood control channel. Tax and bond issues were rejected by voters. Congress directed Corps of Engineers to cease further planning for fiscal year 1974 and 1975.

Trinity River Project, Texas

Trinity River Project, Texas PDF Author: United States. Army. Corps of Engineers. Fort Worth District
Publisher:
ISBN:
Category : Biological monitoring
Languages : en
Pages : 434

Get Book Here

Book Description


Technical Abstract Bulletin

Technical Abstract Bulletin PDF Author:
Publisher:
ISBN:
Category : Science
Languages : en
Pages : 232

Get Book Here

Book Description


Status Report of Environmental Evaluations Trinity River Project, Texas. Main Text

Status Report of Environmental Evaluations Trinity River Project, Texas. Main Text PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 404

Get Book Here

Book Description
This report includes: (1) Authorized Project Plan that provides for flood control, recreation, water supply, navigation, fish and wildlife programs, hydroelectric power and the Multiple-purpose Channel; (2) National Economic Development Plan that is similar to the Authorized Project Plan, but has many features that delete adverse effects to natural resources to reduce cost; (3) Environmental Quality Plan that is a nonstructural multiple-purpose plan of no action in regard to navigation and hydroelectric power for the Corps of Engineers. It proposes land use regulations for the entire Trinity River flood plain and proposes water conservation in lieu of added development for increasing the water supply; (4) No Action Plan; (5) Authorized Project Plan Without Navigation that includes flood control, reservoir regulation channel, strengthen existing agricultural levees, and enlarge Tennessee Colony Lake. This plan reduces some of the adverse effects on natural resources; (6) Authorized Project Plan Without Navigation, Provisions for Future Navigation. This is the same as the previous plan except providing for navigation in the initial stages of design and construction; and (7) Authorized Project Plan, Navigation Terminated Downstream from Dallas. Similar to Authorized Project Plan except for the flood control channel. Tax and bond issues were rejected by voters. Congress directed Corps of Engineers to cease further planning for fiscal year 1974 and 1975.

Status Report of Environmental Evaluations

Status Report of Environmental Evaluations PDF Author: Trinity River Project, Tex
Publisher:
ISBN:
Category : Trinity River (Tex.)
Languages : en
Pages :

Get Book Here

Book Description


Trinity River Project, Project Memorandum No.4, GDM

Trinity River Project, Project Memorandum No.4, GDM PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 318

Get Book Here

Book Description


Trinity River Watershed Project Completion

Trinity River Watershed Project Completion PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 212

Get Book Here

Book Description


Environmental Study Plan for the Trinity River Basin, Texas

Environmental Study Plan for the Trinity River Basin, Texas PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 198

Get Book Here

Book Description
The study plan in this report outlines the framework for a comprehensive environmental study of environmental conditions within the Trinity River Basin, in order to evaluate the environmental impact of the Trinity River Project. The planned research will concentrate on the investigation of natural processes and components present in the environment, the overlay of human activities on the natural system, and the effect of planned changes on both natural and human conditions existing within the basin. The proposed study is divided into four stages. Stage One involves an inventory of resources existing within the Trinity River Basin. Stage Two involves an intensive investigation and evaluation of the more significant areas to be affected by the project. Stage Three involves preparation of a mathematical model to synthesize information obtained during phases one and two. Stage Four involves preparation of the required environmental impact statement. In summary, the study plan has as its basic goal the investigation of natural processes and components present in the environment and consideration of feasible future changes.