Author: United States. Army. Corps of Engineers. Buffalo District
Publisher:
ISBN:
Category : Flood control
Languages : en
Pages : 146
Book Description
Section 205 Initial Appraisal Report on Flooding in the Bay Shore Road Area of Oregon, Ohio
Author: United States. Army. Corps of Engineers. Buffalo District
Publisher:
ISBN:
Category : Flood control
Languages : en
Pages : 146
Book Description
Publisher:
ISBN:
Category : Flood control
Languages : en
Pages : 146
Book Description
Section 205 Initial Appraisal Report on Flood Control Improvements, Depoe Bay, Oregon
Author: United States. Army. Corps of Engineers. Portland District
Publisher:
ISBN:
Category : Depoe Bay (Or.)
Languages : en
Pages :
Book Description
Publisher:
ISBN:
Category : Depoe Bay (Or.)
Languages : en
Pages :
Book Description
Initial Appraisal Report on Flooding of Baldwin Creek in North Royalton, OH Under Section 205 of the 1948 Flood Control Act, as Amended
Author: United States. Army. Corps of Engineers. Buffalo District
Publisher:
ISBN:
Category : Flood control
Languages : en
Pages : 22
Book Description
Publisher:
ISBN:
Category : Flood control
Languages : en
Pages : 22
Book Description
Initial Appraisal Report on Flooding of Whites Landing and Crystal Rock in Erie County, Ohio, Under
Author: United States. Army. Corps of Engineers. Buffalo District
Publisher:
ISBN:
Category : Flood control
Languages : en
Pages : 57
Book Description
Publisher:
ISBN:
Category : Flood control
Languages : en
Pages : 57
Book Description
Initial Appraisal, Section 205 Flood Control, Scappoose, Oregon
Author: United States. Army. Corps of Engineers. Portland District
Publisher:
ISBN:
Category : Flood control
Languages : en
Pages : 41
Book Description
Publisher:
ISBN:
Category : Flood control
Languages : en
Pages : 41
Book Description
Initial Appraisal Report on Flooding on Plum Creek at Columbia Station, Ohio, Under Section 205 of the 1948 Flood Control Act, as Amended
Author: United States. Army. Corps of Engineers. Buffalo District
Publisher:
ISBN:
Category : Flood control
Languages : en
Pages : 76
Book Description
Publisher:
ISBN:
Category : Flood control
Languages : en
Pages : 76
Book Description
Salem, Oregon, Pringle Creek
Author: United States. Army. Corps of Engineers. Portland District
Publisher:
ISBN:
Category : Flood control
Languages : en
Pages : 54
Book Description
Publisher:
ISBN:
Category : Flood control
Languages : en
Pages : 54
Book Description
Detailed Project Report and Environmental Assessment, Section 205 Flood Risk Management, City of Independence, Cuyahoga County, Ohio
Author:
Publisher:
ISBN:
Category : Floods
Languages : en
Pages : 886
Book Description
Publisher:
ISBN:
Category : Floods
Languages : en
Pages : 886
Book Description
Journal of the House of Representatives of the United States
Author: United States. Congress. House
Publisher:
ISBN:
Category : CD-ROMs
Languages : en
Pages : 1668
Book Description
Some vols. include supplemental journals of "such proceedings of the sessions, as, during the time they were depending, were ordered to be kept secret, and respecting which the injunction of secrecy was afterwards taken off by the order of the House".
Publisher:
ISBN:
Category : CD-ROMs
Languages : en
Pages : 1668
Book Description
Some vols. include supplemental journals of "such proceedings of the sessions, as, during the time they were depending, were ordered to be kept secret, and respecting which the injunction of secrecy was afterwards taken off by the order of the House".
Section 205 Initial Appraisal for Turkey River, Elkader, Iowa
Author: Fred Schwada
Publisher:
ISBN:
Category :
Languages : en
Pages : 27
Book Description
The city of Elkader, Iowa, requested that the city's flooding problem from the Turkey River be investigated. This initial appraisal was undertaken to determine if there is sufficient evidence for an economically feasible project to justify the continuation of the reconnaissance study. Two structural alternatives were evaluated as possible solutions to the flooding problem. Plan A would protect the residential areas between Mulberry and Boardman Streets to Bronson Street from the 100-year frequency flooding event. Plan B would protect the commercial and residential areas from Bridge Street to Bronson Street from a 100-year frequency flooding event. These alternatives were studied on a preliminary basis to determine if a plan is economically feasible and warrants further study. All of the alternatives were determined to be economically infeasible and, therefore, the study has been terminated.
Publisher:
ISBN:
Category :
Languages : en
Pages : 27
Book Description
The city of Elkader, Iowa, requested that the city's flooding problem from the Turkey River be investigated. This initial appraisal was undertaken to determine if there is sufficient evidence for an economically feasible project to justify the continuation of the reconnaissance study. Two structural alternatives were evaluated as possible solutions to the flooding problem. Plan A would protect the residential areas between Mulberry and Boardman Streets to Bronson Street from the 100-year frequency flooding event. Plan B would protect the commercial and residential areas from Bridge Street to Bronson Street from a 100-year frequency flooding event. These alternatives were studied on a preliminary basis to determine if a plan is economically feasible and warrants further study. All of the alternatives were determined to be economically infeasible and, therefore, the study has been terminated.