Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 378
Book Description
Schultz-Hanford Area Transmission Line Project
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 378
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 378
Book Description
Schultz-Hanford Area Transmission Line Project
Author:
Publisher:
ISBN:
Category : Electric lines
Languages : en
Pages : 35
Book Description
Publisher:
ISBN:
Category : Electric lines
Languages : en
Pages : 35
Book Description
Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 5
Book Description
This summary covers the major points of the Draft Environmental Impact Statement (EIS) prepared for the BPA Schultz-Hanford Transmission Project proposed by the Bonneville Power Administration (BPA). The project involves constructing a new 500-kilovolt (kV) line in central Washington, north of Hanford. The new line would connect to an existing line at the Schultz Substation near Ellensburg and to a new or existing substation in the Hanford area (see Map 2 in EIS). The project may also involve constructing a new substation to accommodate the new transmission line. As a federal agency, BPA is required by the National Environmental Policy Act (NEPA) to take into account potential environmental consequences of its proposal and take action to protect, restore, and enhance the environment during and after construction. Preparation of this EIS assists in meeting those requirements.
Publisher:
ISBN:
Category :
Languages : en
Pages : 5
Book Description
This summary covers the major points of the Draft Environmental Impact Statement (EIS) prepared for the BPA Schultz-Hanford Transmission Project proposed by the Bonneville Power Administration (BPA). The project involves constructing a new 500-kilovolt (kV) line in central Washington, north of Hanford. The new line would connect to an existing line at the Schultz Substation near Ellensburg and to a new or existing substation in the Hanford area (see Map 2 in EIS). The project may also involve constructing a new substation to accommodate the new transmission line. As a federal agency, BPA is required by the National Environmental Policy Act (NEPA) to take into account potential environmental consequences of its proposal and take action to protect, restore, and enhance the environment during and after construction. Preparation of this EIS assists in meeting those requirements.
Schultz-Hanford Area Transmission Line Project
Author:
Publisher:
ISBN:
Category : Electric lines
Languages : en
Pages : 35
Book Description
Publisher:
ISBN:
Category : Electric lines
Languages : en
Pages : 35
Book Description
Wallula Power Project and Wallula-McNary Transmission Line Project
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 524
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 524
Book Description
Federal Register
Author:
Publisher:
ISBN:
Category : Administrative law
Languages : en
Pages : 682
Book Description
Publisher:
ISBN:
Category : Administrative law
Languages : en
Pages : 682
Book Description
Sutter Basin Pilot Feasibility Final Report
Author: United States. Office of the Assistant Secretary of the Army (Civil Works)
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages : 1314
Book Description
Publisher:
ISBN:
Category : Environmental impact analysis
Languages : en
Pages : 1314
Book Description
Plymouth Generating Facility
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 598
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 598
Book Description
Maiden Wind Farm, Benton County
Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 314
Book Description
Publisher:
ISBN:
Category :
Languages : en
Pages : 314
Book Description
Federal Register Index
Author:
Publisher:
ISBN:
Category : Administrative law
Languages : en
Pages : 172
Book Description
Publisher:
ISBN:
Category : Administrative law
Languages : en
Pages : 172
Book Description