This Proposed Plan (PP) presents the preferred alternative for addressing contaminated groundwater and springs at the Chemical Plant area of the Weldon Spring site, in Weldon Spring, Missouri. The site is located about 30 mi west of St. Louis, in St. Charles County (Figure 1). This proposed action constitutes the final remedial action for the Weldon Spring site. The residual contamination in groundwater and springs at the Chemical Plant area is the only remaining contamination that needs to be addressed for the site. All other contamination has been addressed by previous remedial actions. After this remedial action is implemented, long-term surveillance and maintenance activities will maintain the effectiveness of all remedial actions conducted at the Weldon Spring site, including this final remedial action for groundwater and springs that is being proposed in this plan. DOE complies with the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) in conducting remedial activities at the site. National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process; that is, the analysis conducted and presented in the remedial investigation/feasibility study (RI/FS) reports included an evaluation of environmental impacts that is comparable to that performed under NEPA. This PP is required under CERCLA to (1) notify the public and present a brief analysis of the remedial action alternatives, (2) identify and present the rationale for the preferred remedial action alternative identified in the PP, (3) summarize key information from the RI/FS evaluations, including the Baseline Risk Assessment (BRA), and (4) inform the public of its role in the remedy selection process and give the public the opportunity to participate in the process. Remediation activities at the Weldon Spring site have been coordinated with the U.S. Environmental Protection Agency (EPA) and the Missouri Department of Natural Resources (MDNR). The EPA has overall oversight and approval authority, with consultation provided by the MDNR. A range of alternatives was considered in identifying the preferred alternative. The alternatives were developed after careful analysis of geological, environmental, and human health and ecological risk data and an evaluation of the effectiveness, implementability, and cost of the various technologies available for groundwater remediation at the Chemical Plant area. Monitored natural attenuation (MNA) coupled with institutional controls (ICs) and contingency activities has been selected as the preferred alternative.

Proposed Plan for Final Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri

Proposed Plan for Final Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 34

Get Book Here

Book Description
This Proposed Plan (PP) presents the preferred alternative for addressing contaminated groundwater and springs at the Chemical Plant area of the Weldon Spring site, in Weldon Spring, Missouri. The site is located about 30 mi west of St. Louis, in St. Charles County (Figure 1). This proposed action constitutes the final remedial action for the Weldon Spring site. The residual contamination in groundwater and springs at the Chemical Plant area is the only remaining contamination that needs to be addressed for the site. All other contamination has been addressed by previous remedial actions. After this remedial action is implemented, long-term surveillance and maintenance activities will maintain the effectiveness of all remedial actions conducted at the Weldon Spring site, including this final remedial action for groundwater and springs that is being proposed in this plan. DOE complies with the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) in conducting remedial activities at the site. National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process; that is, the analysis conducted and presented in the remedial investigation/feasibility study (RI/FS) reports included an evaluation of environmental impacts that is comparable to that performed under NEPA. This PP is required under CERCLA to (1) notify the public and present a brief analysis of the remedial action alternatives, (2) identify and present the rationale for the preferred remedial action alternative identified in the PP, (3) summarize key information from the RI/FS evaluations, including the Baseline Risk Assessment (BRA), and (4) inform the public of its role in the remedy selection process and give the public the opportunity to participate in the process. Remediation activities at the Weldon Spring site have been coordinated with the U.S. Environmental Protection Agency (EPA) and the Missouri Department of Natural Resources (MDNR). The EPA has overall oversight and approval authority, with consultation provided by the MDNR. A range of alternatives was considered in identifying the preferred alternative. The alternatives were developed after careful analysis of geological, environmental, and human health and ecological risk data and an evaluation of the effectiveness, implementability, and cost of the various technologies available for groundwater remediation at the Chemical Plant area. Monitored natural attenuation (MNA) coupled with institutional controls (ICs) and contingency activities has been selected as the preferred alternative.

Proposed Plan for Final Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri

Proposed Plan for Final Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri PDF Author: United States. Department of Energy. Weldon Spring Site Remedial Action Project
Publisher:
ISBN:
Category : Hazardous waste site remediation
Languages : en
Pages : 0

Get Book Here

Book Description


Proposed Plan for Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri

Proposed Plan for Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 62

Get Book Here

Book Description
This Proposed Plan addresses the remediation of groundwater contamination at the chemical plant area of the Weldon Spring site in Weldon Spring, Missouri. The site is located approximately 48 km (30 mi) west of St. Louis in St. Charles County . Remedial activities at the site will be conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The U.S. Department of Energy (DOE), in conjunction with the U.S. Department of the Army (DA), conducted a joint remedial investigation/feasibility study (RI/FS) to allow for a comprehensive evaluation of groundwater conditions at the Weldon Spring chemical plant area and the Weldon Spring ordnance works area, which is an Army site adjacent to the chemical plant area. Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. That is, the analysis conducted and presented in the RVFS reports included an evaluation of environmental impacts that is comparable to that performed under NEPA. This Proposed Plan summarizes information about chemical plant area groundwater that is presented in the following documents: (1) The Remedial Investigation (RI), which presents information on the nature and extent of contamination; (2) The Baseline Risk Assessment (BRA), which evaluates impacts to human health and the environment that could occur if no cleanup action of the groundwater were taken (DOE and DA 1997a); and (3) The Feasibility Study (FS) and the Supplemental FS, which develop and evaluate remedial action alternatives for groundwater remediation.

Proposed Plan for Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri

Proposed Plan for Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri PDF Author: United States. Department of Energy. Weldon Spring Site Remedial Action Project
Publisher:
ISBN:
Category : Hazardous waste site remediation
Languages : en
Pages : 0

Get Book Here

Book Description


Supporting Evaluation for the Proposed Plan for Final Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri

Supporting Evaluation for the Proposed Plan for Final Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri PDF Author: United States. Department of Energy. Weldon Spring Site Remedial Project
Publisher:
ISBN:
Category : Hazardous waste site remediation
Languages : en
Pages : 0

Get Book Here

Book Description


Supporting Evaluation for the Proposed Plan for Final Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri

Supporting Evaluation for the Proposed Plan for Final Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 104

Get Book Here

Book Description
This report presents the technical information developed since the interim record of decision (IROD) was issued in September 2000 (U.S. Department of Energy [DOE] 2000). The information was incorporated into the evaluation that was performed in selecting the preferred alternative for the Chemical Plant groundwater operable unit (GWOU) of the Weldon Spring site. The contaminants of concern (COCs) in groundwater and springs are trichloroethylene (TCE), nitrate, uranium, and nitroaromatic compounds. The preferred alternative of monitored natural attenuation (MNA) coupled with institutional controls (ICs) and contingency activities is described in the ''Proposed Plan (PP) for Final Remedial Action for the Groundwater Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri'' (DOE 2003b).

Final Proposed Plan for Remedial Action for the Groundwater Operable Unit, Operable Unit 2, Former Weldon Spring Ordinance Works, Weldon Spring, Missouri

Final Proposed Plan for Remedial Action for the Groundwater Operable Unit, Operable Unit 2, Former Weldon Spring Ordinance Works, Weldon Spring, Missouri PDF Author:
Publisher:
ISBN:
Category : Groundwater
Languages : en
Pages : 42

Get Book Here

Book Description
This proposed plan describes the remedial alternatives considered for Operable Unit 2 (OU2)' of the former Weldon Spring Ordnance Works (WSOW) and identifies the preferred alternative for remediation of groundwater.

Work Plan for the Remedial Investigation

Work Plan for the Remedial Investigation PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


Feasibility Study for Remedial Action for the Groundwater Operable Units at the Chemical Plant Area and the Ordnance Works Area at the Weldon Spring Site, Weldon Spring, Missouri

Feasibility Study for Remedial Action for the Groundwater Operable Units at the Chemical Plant Area and the Ordnance Works Area at the Weldon Spring Site, Weldon Spring, Missouri PDF Author:
Publisher:
ISBN:
Category : Groundwater
Languages : en
Pages :

Get Book Here

Book Description
This feasibility study (FS) has been prepared to evaluate potential options for addressing groundwater contamination at the WSCP (Weldon Spring Chemical Plant) and the WSOW (Weldon Spring Ordnance Works).

Feasibility Study for Remedial Action for the Groundwater Operable Units at the Chemical Plant Area and the Ordnance Works Area, Weldon Spring, Missouri

Feasibility Study for Remedial Action for the Groundwater Operable Units at the Chemical Plant Area and the Ordnance Works Area, Weldon Spring, Missouri PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 269

Get Book Here

Book Description
The U.S. Department of Energy (DOE) and the U.S. Department of Army (DA) are conducting an evaluation to identify the appropriate response action to address groundwater contamination at the Weldon Spring Chemical Plant (WSCP) and the Weldon Spring Ordnance Works (WSOW), respectively. The two areas are located in St. Charles County, about 48 km (30 rni) west of St. Louis. The groundwater operable unit (GWOU) at the WSCP is one of four operable units being evaluated by DOE as part of the Weldon Spring Site Remedial Action Project (WSSRAP). The groundwater operable unit at the WSOW is being evaluated by the DA as Operable Unit 2 (OU2); soil and pipeline contamination are being managed under Operable Unit 1 (OU1). Remedial activities at the WSCP and the WSOW are being conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consistent with DOE policy, National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process. A remedial investigation/feasibility study (RI/FS) work plan summarizing initial site conditions and providing site hydrogeological and exposure models was published in August of 1995 (DOE 1995). The remedial investigation (RI) and baseline risk assessment (BRA) have also recently been completed. The RI (DOE and DA 1998b) discusses in detail the nature, extent, fate, and transport of groundwater and spring water contamination. The BRA (DOE and DA 1998a) is a combined baseline assessment of potential human health and ecological impacts and provides the estimated potential health risks and ecological impacts associated with groundwater and springwater contamination if no remedial action were taken. This feasibility study (FS) has been prepared to evaluate potential options for addressing groundwater contamination at the WSCP and the WSOW. A brief description of the history and environmental setting of the sites is presented in Section 1.1, key information relative to the nature and extent of contamination is presented in Section 1.2, and the results of the BRA are summarized in Section 1.3. The objective of this FS is discussed in Section 1.4, and preliminary remediation goals are identified in Section 1.5. The organization of the remaining chapters of this FS is outlined in Section 1.6.