Options for the Navy's Future Fleet

Options for the Navy's Future Fleet PDF Author: Eric Jackson Labs
Publisher:
ISBN:
Category : Government publications
Languages : en
Pages : 120

Get Book Here

Book Description

Options for the Navy's Future Fleet

Options for the Navy's Future Fleet PDF Author: Eric Jackson Labs
Publisher:
ISBN:
Category : Government publications
Languages : en
Pages : 120

Get Book Here

Book Description


Options for the Navy's Future Fleet

Options for the Navy's Future Fleet PDF Author:
Publisher:
ISBN:
Category : Warships
Languages : en
Pages : 85

Get Book Here

Book Description


Navy Force Structure and Shipbuilding Plans

Navy Force Structure and Shipbuilding Plans PDF Author: Ronald O'Rourke
Publisher:
ISBN:
Category :
Languages : en
Pages : 145

Get Book Here

Book Description
Updated 12/10/2020: In December 2016, the Navy released a force-structure goal that callsfor achieving and maintaining a fleet of 355 ships of certain types and numbers. The 355-shipgoal was made U.S. policy by Section 1025 of the FY2018 National Defense AuthorizationAct (H.R. 2810/P.L. 115- 91 of December 12, 2017). The Navy and the Department of Defense(DOD) have been working since 2019 to develop a successor for the 355-ship force-level goal.The new goal is expected to introduce a new, more distributed fleet architecture featuring asmaller proportion of larger ships, a larger proportion of smaller ships, and a new third tier oflarge unmanned vehicles (UVs). On December 9, 2020, the Trump Administration released a document that can beviewed as its vision for future Navy force structure and/or a draft version of the FY202230-year Navy shipbuilding plan. The document presents a Navy force-level goal that callsfor achieving by 2045 a Navy with a more distributed fleet architecture, 382 to 446 mannedships, and 143 to 242 large UVs. The Administration that takes office on January 20, 2021,is required by law to release the FY2022 30-year Navy shipbuilding plan in connection withDOD's proposed FY2022 budget, which will be submitted to Congress in 2021. In preparingthe FY2022 30-year shipbuilding plan, the Administration that takes office on January 20,2021, may choose to adopt, revise, or set aside the document that was released on December9, 2020. The Navy states that its original FY2021 budget submission requests the procurement ofeight new ships, but this figure includes LPD-31, an LPD-17 Flight II amphibious ship thatCongress procured (i.e., authorized and appropriated procurement funding for) in FY2020.Excluding this ship, the Navy's original FY2021 budget submission requests the procurementof seven new ships rather than eight. In late November 2020, the Trump Administrationreportedly decided to request the procurement of a second Virginia-class attack submarinein FY2021. CRS as of December 10, 2020, had not received any documentation from theAdministration detailing the exact changes to the Virginia-class program funding linesthat would result from this reported change. Pending the delivery of that information fromthe administration, this CRS report continues to use the Navy's original FY2021 budgetsubmission in its tables and narrative discussions.

Navy Large Unmanned Surface and Undersea Vehicles

Navy Large Unmanned Surface and Undersea Vehicles PDF Author: Ronald O'Rourke
Publisher:
ISBN: 9781075833274
Category :
Languages : en
Pages : 30

Get Book Here

Book Description
The Navy wants to develop and procure three new types of unmanned vehicles (UVs) in FY2020 and beyond-Large Unmanned Surface Vehicles (LUSVs), Medium Unmanned Surface Vehicles (MUSVs), and Extra-Large Unmanned Undersea Vehicles (XLUUVs). The Navy is requesting $628.8 million in FY2020 research and development funding for these three UV programs and their enabling technologies. The Navy wants to acquire these three types of UVs (which this report refers to collectively as large UVs) as part of an effort to shift the Navy to a new fleet architecture (i.e., a new combination of ships and other platforms) that is more widely distributed than the Navy's current architecture. Compared to the current fleet architecture, this more-distributed architecture is to include proportionately fewer large surface combatants (i.e., cruisers and destroyers), proportionately more small surface combatants (i.e., frigates and Littoral Combat Ships), and the addition of significant numbers of large UVs. The Navy wants to employ accelerated acquisition strategies for procuring these large UVs, so as to get them into service more quickly. The emphasis that the Navy placed on UV programs in its FY2020 budget submission and the Navy's desire to employ accelerated acquisition strategies in acquiring these large UVs together can be viewed as an expression of the urgency that the Navy attaches to fielding large UVs for meeting future military challenges from countries such as China. The LUSV program is a proposed new start project for FY2020. The Navy wants to procure two LUSVs per year in FY2020FY2024. The Navy wants LUSVs to be low-cost, high-endurance, reconfigurable ships based on commercial ship designs, with ample capacity for carrying various modular payloads-particularly anti-surface warfare (ASuW) and strike payloads, meaning principally anti-ship and land-attack missiles. The Navy reportedly envisions LUSVs as being 200 feet to 300 feet in length and having a full load displacement of about 2,000 tons. The MUSV program began in FY2019. The Navy plans to award a contract for the first MUSV in FY2019 and wants to award a contract for the second MUSV in FY2023. The Navy wants MUSVs, like LUSVs, to be low-cost, high-endurance, reconfigurable ships that can accommodate various payloads. Initial payloads for MUSVs are to be intelligence, surveillance and reconnaissance (ISR) payloads and electronic warfare (EW) systems. The Navy defines MUSVs as having a length of between 12 meters (about 39 feet) and 50 meters (about 164 feet). The Navy wants to pursue the MUSV program as a rapid prototyping effort under what is known as Section 804 acquisition authority. The XLUUV program, also known as Orca, was established to address a Joint Emergent Operational Need (JEON). The Navy wants to procure nine XLUUVs in FY2020-FY2024. The Navy announced on February 13, 2019, that it had selected Boeing to fabricate, test, and deliver the first four Orca XLUUVs and associated support elements. On March 27, 2019, the Navy announced that the award to Boeing had been expanded to include the fifth Orca. The Navy's large UV programs pose a number of oversight issues for Congress, including issues relating to the analytical basis for the more-distributed fleet architecture; the Navy's accelerated acquisition strategies and funding method for these programs; technical, schedule, and cost risk in the programs; the proposed annual procurement rates for the programs; the industrial base implications of the programs; the personnel implications of the programs; and whether the Navy has accurately priced the work it is proposing to do in FY2020 on the programs.

Budget Options

Budget Options PDF Author: United States. Congressional Budget Office
Publisher:
ISBN:
Category : Budget
Languages : en
Pages : 376

Get Book Here

Book Description


Options for the Navy's Future Fleet

Options for the Navy's Future Fleet PDF Author: Congressional Budget Office
Publisher: CreateSpace
ISBN: 9781500940430
Category : History
Languages : en
Pages : 110

Get Book Here

Book Description
Today's Navy numbers about 285 battle force ships (a category that includes aircraft carriers, submarines, surface combat ships, amphibious warfare ships, and various support vessels). Recently, the Navy indicated that it needs a fleet of 313 ships to perform all of its missions. Building and sustaining such a force, however, would require greater budgetary resources over the next three decades than the Navy has received in recent years. The Congressional Budget Office (CBO) estimates that the Navy would have to spend an average of about $21 billion per year (in 2007 dollars) on ship procurement to carry out its 313-ship plan— more than 70 percent greater than its average spending between 2000 and 2005. At the same time, the Navy has plans to modernize its aircraft that, if fully implemented, would require more resources than the service currently spends on new planes and helicopters.Given the many pressures that the federal budget will face in coming decades, the Navy might not receive a sizable increase in funding. In that case, what alternative force structures could be accommodated within existing spending levels? This CBO study—prepared at the request of the Subcommittee on Seapower of the Senate Committee on Armed Services—examines that question. It looks at the Navy's modernization plans for ships and aircraft and their budgetary implications. It also analyzes five alternative approaches to modernization that would cost roughly the same average annual amount as the Navy has spent since 2000. In keeping with CBO's mandate to provide impartial analysis, this study makes no recommendations.

Budget options for fiscal year

Budget options for fiscal year PDF Author:
Publisher:
ISBN:
Category : Budget
Languages : en
Pages :

Get Book Here

Book Description


Navy Destroyer Acquisition Programs

Navy Destroyer Acquisition Programs PDF Author: United States. Congress. House. Committee on Armed Services. Seapower and Expeditionary Forces Subcommittee
Publisher:
ISBN:
Category : History
Languages : en
Pages : 136

Get Book Here

Book Description


U.S. Military Forces in FY 2021

U.S. Military Forces in FY 2021 PDF Author: Mark F. Cancian
Publisher: Rowman & Littlefield
ISBN: 1538140365
Category : Political Science
Languages : en
Pages : 129

Get Book Here

Book Description
CSIS senior adviser Mark Cancian annually produces a series of white papers on U.S. military forces, including their composition, new initiatives, long-term trends, and challenges. This report is a compilation of these papers and takes a deep look at each of the military services, the new Space Force, special operations forces, DOD civilians, and contractors in the FY 2021 budget. This report further includes a foreword regarding how the Biden administration might approach decisions facing the military forces, drawing on insights from the individual chapters.

Building a 600-ship Navy

Building a 600-ship Navy PDF Author: Peter T. Tarpgaard
Publisher:
ISBN:
Category : Shipbuilding
Languages : en
Pages : 148

Get Book Here

Book Description