Operability Test Procedure [Tank] 241-SY-101 Equipment Removal System

Operability Test Procedure [Tank] 241-SY-101 Equipment Removal System PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 107

Get Book Here

Book Description
The 241-SY-101 equipment removal system (ERS) consists of components, equipment, instrumentation and procedures that will provide the means to disconnect, retrieve, contain, load and transport the Mitigation Pump Assembly (MPA) from waste Tank 241-SY-101 to the Central Waste Complex (CWC). The Operability Test Procedure (OTP) will test the interfaces between ERS components and will rehearse the procedure for MPA removal and transportation to the extent they can be mocked-up at the CTF (Cold Test Facility). At the conclusion of the OTP, the ERS components and equipment will be removed from the CTF, entered into the Component Based Recall System (CBRS), and stored until needed for actual MPA removal and transportation.

Radioactive Waste Management

Radioactive Waste Management PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 544

Get Book Here

Book Description


Energy Research Abstracts

Energy Research Abstracts PDF Author:
Publisher:
ISBN:
Category : Power resources
Languages : en
Pages : 508

Get Book Here

Book Description


INIS Atomindex

INIS Atomindex PDF Author:
Publisher:
ISBN:
Category : Nuclear energy
Languages : en
Pages : 682

Get Book Here

Book Description


Acceptance Test Procedure, 241-SY-101

Acceptance Test Procedure, 241-SY-101 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 78

Get Book Here

Book Description
This Acceptance Test Procedure is for the 241-SY-101/241-C-106 Shot Loading System. The procedure will test the components of the Shot Loading System and its capability of adequately loading shot into the annular space of the Container. The loaded shot will provide shielding as required for transporting and storage of a contaminated pump after removal from the tank. This test serves as verification that the SLS is acceptable for use in the pump removal operations for Tanks 241-SY-101, 241-C-106 and 241-AY-102. The pump removal operation for these three tanks will be performed by two different organizations with different equipment, but the Shot Loading System will be compatible between the two operations.

Hanfor Site Tank 241-SY-101, Damaged Equipment Removal

Hanfor Site Tank 241-SY-101, Damaged Equipment Removal PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages :

Get Book Here

Book Description


The Office of Environmental Management Technical Reports

The Office of Environmental Management Technical Reports PDF Author:
Publisher:
ISBN:
Category : Environmental management
Languages : en
Pages : 972

Get Book Here

Book Description


Tank 241-SY-101 Surface Level Rise Remediation Test and Evaluation Plan for Transfer System

Tank 241-SY-101 Surface Level Rise Remediation Test and Evaluation Plan for Transfer System PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 41

Get Book Here

Book Description
The purpose of this testing and evaluation plan (TEP) is to provide the high level guidance on testing requirements for ensuring that the equipment and systems to be implemented for remediation of the SY-101 waste level rise USQ are effective.

Structural Analysis of the Equipment Removal System for Tank 241SY101

Structural Analysis of the Equipment Removal System for Tank 241SY101 PDF Author:
Publisher:
ISBN:
Category :
Languages : en
Pages : 0

Get Book Here

Book Description


Government Reports Announcements & Index

Government Reports Announcements & Index PDF Author:
Publisher:
ISBN:
Category : Science
Languages : en
Pages : 1164

Get Book Here

Book Description